SHEET NO. Drawing Title Scale (Printed on A3)
01 Table of Contents + Site Plan 1:500
02 SU[2[2lementarv Site Plan 1 :300
03 Unit Block A -
Ground Level Floor Plan 1 :100
04 Unit Block A -
First Level Floor Plan 1 :100
05 Unit Block A -
Elevations A + B 1 :100
06 Unit Block A -
Elevations C + D 1 :100
07 Unit Block B 1 -
Ground Level Floor Plan 1 :100
08 Unit Block B 1 -
First Level Floor Plan 1:100
09 Unit Block B 1 -
Elevations A + B 1 :100
10 Unit Block B 1 -
Elevations C + D 1:100
11 Unit Block B2 -
Ground Level Floor Plan 1:100
12 Unit Block B2 -
First Level Floor Plan 1:100
13 Unit Block B2 -
Elevations A + B 1:100
14 Unit Block B2 -
Elevations C + D 1:100
15 Unit Block C -
Ground Level Floor Plan 1:100
16 Unit Block C -
First Level Floor Plan 1 :100
17 Unit Block C -
Elevations A + B 1 :100
18 Unit Block C -
Elevations C + D 1 :100
19 Unit Block D -
Ground Level Floor Plan 1 :100
20 Unit Block D -
First Level Floor Plan 1 :100
21 Unit Block D -
Elevations A + B 1 :100
22 Unit Block D -
Elevations C + D 1 :100
23 General Section 01 a 1:50
24 General Section 01 b 1:50
EAVE CALCULATIONS
25 General Section 02 1:50 UNIT BLOCK A -
Ground level 69.2% -
First level -74.4%
LEGEN
26 3D Colour Renders 1 of 3 Not to Scale UNIT BLOCK B -
Ground level -74.2%
First level -
77.4%
SYMBO
27 3D Colour Renders 2 of 3 Not to Scale
28 3D Colour Renders 3 of 3 Not to Scale
UNIT BLOCK C -
Ground level
First level
-
-
66.35%
71.55% ~
UNIT BLOCK D -
Ground level -
59.54%
First level -
68.10%
TOTAL -
Ground level -
68.69%
First level -
73.69%
Overall - 72.11 %
.AlTHOUGH EAVES COVER IS 72.11" SHOULD BE NOTED
21.71" OF THIS OVERHANG IS 1.. METRES OR GREATER
SEDIMENT CONTROL MEASURES TO BE TAKEN ON SITE DURING
CONSTRUCTION
FINAL LANDSCAPING TO BE DESIGNED BY LANDSCAPE
ARCHITECT STOREYS/HEIGHTS SITE COVERAGE
ALL GLAZING WITHIN 10m FIRE ZONE TO BE IN UNIT BLOCK MAXIMUM HEIGHT ""OT "’~~v
Vt’lll I.H....,...."A- 556.7m2
’"0M NATURAL O.l.)
ACCORDANCE WITH THE REQUIREMENT OF AS 3959 UNIT BLOCK B- 952.8m2
UNIT BLOCK A -
2 STOREYS 6.975m
METAL FENCING TO BE FLUSH TO TOP OF RETAINING WALL. UNIT BLOCK C- 477.9m2
UNIT BLOCK B-2 STOREYS 8.260m ...."I
SO AS TO NOT ALLOW POTENTIAL EMBER TO PASS THROUGH UNIT BLOCK D- 396.4m2
UNIT BLOCK C -
2 STOREYS 7.875m
TOTAL- 2383.8m2
UNIT BLOCK D -
2 STOREYS 7.130m
THE FOLLOWING ITEMS ARE TO BE VERIFIED BY
BUILDER/CLIENT PRIOR TO COMMENCEMENT. LOI.DlSCIIPlION .
-
CUT & FILL BAnERS INDICATIVE ONLY l. ,.~’ .~
..01’: ’1t GROSS FLOOR AREA (GFA)CALCULATIONS
Q9
’..
-
PLATFORM/AND OR TOP OF SLAB LEVELS .
TO BE CONFIRMED ON SITE P.Wt .~ UNIT TYPE 01 a lEND UNITS) UNIT NO.s 01.07.08. 7 UNITS GROUND lEVEL GFA -
46.0m2 (per Unit)
LOCATION OF EASEMENTS 19. 20. 25. 30 FIRST lEVEL GFA 41.0m2 (per Unit)
-
-SEWER LINE
AftEAr: .
"89m2 -
UNIT TYPE 01 b (CENTRAL UNITS) UNIT NO.s 02-<J6. 09-18. 22 UNITS GROUND lEVEL GFA -
45.2m2 (per Unit)
-
BUILDING COVENANT SITE REQUIREMENTS PAJISH: TeWANllN 21-24.27-29 FIRST lEVEL GFA -
40.1 m2 (per’Unit)
DESIGNATED BUILDING ENVELOPES
-
’: MA-RCK UNIT TYPE 02 UNITS NO. 26 I UNIT GROUND lEVEL GFA -
47.5m2
-
SPECIAL HEIGHT RESTRAINTS BY COUNCIL OR DEVELOPER
-
SITE BEARINGS & DIMENSIONS C~38.51~f2383.8m2j GFA TO BE 60% IMAX)OF SITE AREA = GFA(MAX) AllOWED -
3713.4m2
FIRST lEVEL GFA -
42.2m2
TOTAL GFA ACHIEVED. 2575.3m2
Client.
Canto Holdings P/L Table of Content
Lot 4 Hofmann Drive
NOOSAVILLE Builder. J. & G. KNOWLES & ASSOCIATES (07)334
www.reltsma.com.auP:0754916834POBox3515CaloundraQLD4551PozeotPt
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU11/0254 Response to information requestRelated documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.