CONSTRUCTION OF DRiVewAY
CROSSOVER TO BE IN ACCORDANCE WITH UNIT BLOCK A FINISHED FLOOR LEVELS Drive
Hofmann Drive LOCAL AUTHORITIES REGULATIONS IREFER TO
CIVIL ENGINEERS DETAILSI
UNTfSOI-07 Hofmann
Lot 5
(SP222982)
BUSHLAND
UNIT BLOCK D FINISHED FLOOR LEVELS
UNTfS 26 30
-
GROUND LEVEL TOP OF SLAB R.L. 4.950
FIRST LEVEL TOP OF FLOOR R.L. 8.00
UNIT BLOCK C FINISHED FLOOR LEVELS
UNTfS 20 25
-
GROUND LEVEL TOP OF SLAB R.L. 4.535
FIRST LEVEL TOP OF FLOOR R.L. 7.585
SEDIMENT CONTROL MEASURES TO BE TAKEN ON SITE DURING
CONSTRUCTION
FINAL LANDSCAPING TO BE DESIGNED BY LANDSCAPE
ARCHTfECT
ALL GLAZING WITHIN 10m FIRE ZONE TO BE IN
ACCORDANCE WTfH THE REQUIREMENT OF AS 3959
METAL FENCING TO BE FLUSH TO TOP OF RETAINING WALL.
SO AS TO NOT ALLOW POTENTIAL EMBER TO PASS THROUGH
8Y
8UILDER/CLlENT PRIOR TO COMMENCEMENT.
-
CUT & FILL BAnERS INDICATIVE ONLY
~
-
PLATFORM/AND OR TOP OF SLAB LEVElS
TO BE CONFIRMED ON SITE
-LOCATION OF EASEMENTS
-SEWER LINE
-
BUILDING COVENANT SITE REQUIREMENTS
-
DESIGNATED BUILDING ENVElOPES
-
SPECIAL HEIGHT RESTRAINTS BY COUNCIL OR DEVELOPER
-
SITE BEARINGS & DIMENSIONS
Client.
Canto Holdings P/L Supplement
Lot 4 Hofmann Drive
NOOSAVILLE Builder. J. & G. KNOWLES & ASSOCIATES (07)334
design to enjoy. www.rellsma.com.au P: 07 54916834 PO Box 3515 Coloundra QLD 4551 Pazcol Pt
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU11/0254 Response to information requestRelated documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.