Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM (Queensland Urban Drainage Manual) and considering the extent of proposed development within the catchment. 2.5.3 Impervious Areas After inspecting the site, it was decided that an impervious area of 20% would be used for the pre development case. In accordance with the post- developed situation, 90% of impervious ground area was used in the post development model. 2.5.4 Manning's ‘n’ Values for the dimensionless Manning’s ‘n’ coefficient for open channel and piped flows were assigned according to Table 2.1 in accordance with QUDM. Table 2.1: Study Manning's ‘n’ Conduit Condition Manning’s ‘n’ Grassed, Landscaped 0.045 Swales Reinforced Concrete 0.014 2.5.5 Energy Loss Coefficients Entrance and exit loss coefficients were utilised according to Table 2.2 in general accordance with QUDM. Table 2.2: Pipe Energy Loss Coefficients Energy Loss Loss Coefficient Entry Loss 0.5 Exit Loss 0.2 2.5.6 Results The following table shows maximum stormwater flows generated in the pre development case.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.