Skip to the record
The gold standard in government transparency.

Council archive · source document

06/2689 - Response to request for further Information [As Published] · 132006.2689

of 126

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

12

 

David Low Way past the development site is a two way two lane road, and from
Table 4.3, has a desirable maximum capacity of 20,000 vehicles per day. From
Table 3.1, traffic volumes in 2018 on David Low Way past the site can be
expected to be approximately 19,248 vehicles per day, which is within this limit.

The proposed development will not have a major impact on these volumes (up to
118 daily vehicles). However, past 2018 and with additional development
associated with the Peregian Beach Master Plan, volumes may increase to over
20,000 vehicles per day. This may also be the case for holiday periods. Further
upgrading of David Low Way or the redirection of traffic to bypass Peregian
Beach may be required further into the future past 2018.

 

Neon ver BURCHILL VDM

Used in these records

About this file

File size
19.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - Response to request for further Information [As Published].pdf · 19.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.