Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
12 David Low Way past the development site is a two way two lane road, and from Table 4.3, has a desirable maximum capacity of 20,000 vehicles per day. From Table 3.1, traffic volumes in 2018 on David Low Way past the site can be expected to be approximately 19,248 vehicles per day, which is within this limit. The proposed development will not have a major impact on these volumes (up to 118 daily vehicles). However, past 2018 and with additional development associated with the Peregian Beach Master Plan, volumes may increase to over 20,000 vehicles per day. This may also be the case for holiday periods. Further upgrading of David Low Way or the redirection of traffic to bypass Peregian Beach may be required further into the future past 2018. Neon ver BURCHILL VDM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.