06/2689 - Response to request for further Information [As Published] · 132006.2689

of 126

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Stormwater Drainage

Item 10

Demonstrate that the site can be developed with no net increase in runoff from the site for
storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the
stormwater drainage system designed for the site will need to incorporate an adequate
detention system (holding tanks and rainwater tanks) to retain these flows, which can be
utilised for irrigation, toilet flushing, hose down of paved surfaces, and ground water
recharging.

The present proposal and Stormwater Management Plan does not address this issue.

In this regard additional flows into the existing drainage system in the David Low Way will
not be supported.

 

Response
Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which
addresses this matter.

 

Item 11

Demonstrate that the site can be drained without the use of pumps in accordance with
Specific Outcome 017 of Table 14-46 of the Driveways & Carparking Code. In this regard
the basement proposal cannot be supported unless it can be drained by gravity means.

The applicant is also advised that given stormwater from the carparking and driveway areas
of will contain contaminants such as oil, grease, and fuel, all stormwater runoff will need to !
be collected and discharged through a suitable grease/oil arrestor and/or Gross Pollutant
Traps to separate these contaminants and prevent them from entering Council's drainage
system.

Response
Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which
addresses this matter.

Traffic Issues

 

Item 12
The previously submitted traffic report shall be amended to reflect the new proposal plan
(and any changes that may be generated as a result of this information request) and
_tesubmitted for Council to review.

 

 

 

Response
Please refer to the amended traffic impact assessment prepared by Burchill VDM which
reflects the proposal plans prepared by Ken Down Architects.

Engineering Reports

“Ttem 13 -
Please arrange for all engineering design plans and engineering reports submitted with the
application to be certified by an appropriately_qualified Registered Professional Engineer.

Used in these records

About this file

File size
19.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - Response to request for further Information [As Published].pdf · 19.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.