Stormwater Drainage Item 10 Demonstrate that the site can be developed with no net increase in runoff from the site for storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the stormwater drainage system designed for the site will need to incorporate an adequate detention system (holding tanks and rainwater tanks) to retain these flows, which can be utilised for irrigation, toilet flushing, hose down of paved surfaces, and ground water recharging. The present proposal and Stormwater Management Plan does not address this issue. In this regard additional flows into the existing drainage system in the David Low Way will not be supported. Response Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which addresses this matter. Item 11 Demonstrate that the site can be drained without the use of pumps in accordance with Specific Outcome 017 of Table 14-46 of the Driveways & Carparking Code. In this regard the basement proposal cannot be supported unless it can be drained by gravity means. The applicant is also advised that given stormwater from the carparking and driveway areas of will contain contaminants such as oil, grease, and fuel, all stormwater runoff will need to ! be collected and discharged through a suitable grease/oil arrestor and/or Gross Pollutant Traps to separate these contaminants and prevent them from entering Council's drainage system. Response Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which addresses this matter. Traffic Issues Item 12 The previously submitted traffic report shall be amended to reflect the new proposal plan (and any changes that may be generated as a result of this information request) and _tesubmitted for Council to review. Response Please refer to the amended traffic impact assessment prepared by Burchill VDM which reflects the proposal plans prepared by Ken Down Architects. Engineering Reports “Ttem 13 - Please arrange for all engineering design plans and engineering reports submitted with the application to be certified by an appropriately_qualified Registered Professional Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.