Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
In this regard a consolidated access needs to be provided with left-in/left-out access, and \ this driveway should not extend beyond the prolongation of the southern boundary of the | site (i.e. the driveway should be contained to the actual frontage of the development and _hot impede onto the frontage of adjoining properties). ___ 4 Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. The proposal plans prepared by Ken Down Architects namely the Slip Way Design Plan Drawing No. 2243 SD12 Revision B has been revised in line with recommendations from the traffic engineering response. Item 7 Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park on site, and leave the site without scraping and/or bottoming. This shall be undertaken for all types of vehicles expected to enter the site, with consideration given to the height of such vehicles and the headroom required under the building. This was previously requested by Council, but as the applicant has not provided any evidence to demonstrate that the proposal will work the information is still needed. Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. Item 8 Iltustrate on the proposal plans that suitable sight distances can be achieved from the proposed access driveway to pedestrians on the pathway network and to vehicles on the David Low Way based on the 85-percentile design speed of the David Low Way, not the sign posted speed limit. In this regard a design speed of 70km/h would be more realistic and consideration should also be given to existing vegetation and/or proposed vegetation that may restrict these sight lines. Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. End of Trip Facilities Item 9 Illustrate on the proposal plans all "end of trip facilities" such as bicycle storage lockers for staff, bicyde storage areas for customers, showers, change rooms, seating areas, drinking fountains, etc to cater for people who walk or cycle to the site. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Floor Plan Drawing No. 2243 SD02 Revision G which has been revised to include end of trip facilities within the unisex toilets in the individual buildings.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.