Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
INTEGRATED PLANNING ACT 1997
{Development within the limits of a-
I [port 2 ‘
+ For more informatin refer to Guide 18: For: |
[information abot prescbed al wor refer f
Guide 24. vatt soaty
itfyou answered "YES" to Q12, the apicoton
triggers referral to the Bort Authority.”
The Port ‘Authority is sa COnCUTTENCE agency i it he
development be
‘© within 200m of a shipping channel oran erty
. and exit shipping corridor for the port ©
® within 1000m of a swing basin, a commercial
. Shipping-wharf, a mooring, oma or Spoil
grounds; .
he within. 1000m of a planned paftfaciity ’
identified in a land-use plan approved under“
the Transport nfrasttucture Act 1994. ° es
[an a ather stuafon the Port Authority isan wy
jBdvice agency, os rN eee
IDAS Assessment Checklist, Version 20, 2 April 2007
“112. Does the application involve development below high water mark’8 and within the limits of a port
under the Transport Infrastructure Act 1994?
{I NO
(C1 YES - complete Part M of Form 1, or Part P of Form 1 ifthe work is prescribed tidal work
‘Marinas. Oe
{For more information refer to G Guide 18. For’
{information about whether @ marina is prescribed
dal work refer to Guide 24: The'local’. ¥
govemmentis.the assessment manager for all -
{prescribed dal work. =="
: ifyou answered, "YES" to 043, the application.”-
triggers referral to GuectsindF Fire and Rescue
| Service as ari advice agency... .
13. Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
J No
{11 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
eo {Tidat works in strategic p port land tidal
jareas. *
j [For more information refer to Guide 18 18.
7 Unless j you answered ‘NO to.Q14, the relevant
| Port Authority is the assessment manager for. the
Lapplication and the Environmental Protection
‘Aasney (EPA) and Queensland Transport (QT)
afe concurrence agencies for the application.
14. Does the application involve tidal works within a strategic port land tidal area20?
XI No
(CI YES - complete Part M of Form 1
‘Heritage «
For further information refer to Guide 19.
Hfyou answered "YES" to Q15, the application
iggers referral to the Queensland Heritage
‘Council as concurrence. agency for the
application. y :
4 £ : : * . . ™
TunéSS you answered “none of the above” to.
t
jQ150), the application involves referral tothe .
d as anadvice *
‘Sere brie rican .”
j : —
i as ‘
% . ‘ aah
ee veo. »
15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
No
(11 YES - complete Part C of Form 1
5(b)The application involves: (tick applicable boxes)
LI (i) —amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
C1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
XI (ili) none of the above.
; ‘Declared catchmient areas
For more information, including a fistof the.
| declared catchment areas within Queensiand,.
peer to Guide 13. : wht 2 it.
{Unless yoii answered *none of the above™ fo.
! |C16, fhe apptcation requires assessment byte’
| | Department of Natural Resources ang. Water .
NRW): oe
) Ifan agency, other than NRWi is the assessment
;Manager for the application, NRWisa ~- ”«
| oncurrenca agency for the application i in’
[felation to this matter... ~, B
:| 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
(i) reconfiguring a Iot if any lot resulting from the reconfiguration is less than 16 hectares;
Oli) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,
EX] (iii) none of the above
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinaty high water mark at spring tide.
19 Marina is defined in the Transport Operations {Maritime Pollution) Reguiation 1995.
20 Strategic port land tidal areas are the araas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.