INTEGRATED PLANNING ACT 1997

{Operational work that is tidal work or
{work in coastal management district
|For more Information refer to Guide 18. For ,
more information about prescribed tidal work in: .
ocal goverment dal areas refer to Guide 24, 24. ,
‘Unless you answered “non of the above® te. Q9,
sthe application requires assessment by the

{Environmental Proetion Aaency (EPAY
(ran agency other than EPA 1s the assessment
i manager for theiapplication, EPA Is: al ad
concurrence agency for the application In’
relation t to this. matter. -

| Locat government wth the ascessinent manages

 

 

9.

(DAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: ( tick the applicable box/es)

(1 (i)__tidat work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidat work — complete Part M of Form 1; OF

OW tidal work that is prescribed tidal work" other than in a canal’? -comptete Part P of Form 1; oF

C1 dil) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) fo (i) below are ticked.

(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

(J (b) constructing a canai'? intended to be connected to tidal waters;

(1 (c) constructing an artificial waterway;

C1 (d) reclaiming land under tidal water;

(1 (e) disposing of dredge spoil or other solid waste material in tidal water;

(J (f) _ interfering with quarry material on State coastal land above high-water mark;

(1 (g)_ draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

(1) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

El (iv) none of the above.

 

 

 

 

more information about prescribed fidal work it in.
[local government tidal areas refer to Guide 24. -
Unless you answered ‘nore af the above’ to:-
Q10, the application tiggers referral to |
Queensiand Transport (QT) (Maritime Safety :
Oia asa concurrence agency. 4 ~ oe
Local govemment i s the ‘assessment manager,” ‘
ifor all prescribed dal work, AMT og

 

 

-/10. The application involves operational work that is: (tick the applicable box/es)

[2 (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF

CO (i) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; of
C2 (iti) carried out within a coastal management district'S under the Coastal Act and for -

C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form 1;

(1 (b) reclaiming land under tidal water - complete Part M of Form 1; or

(1 (c) constructing a canal’2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

(iv) none of the above,

 

 

 

‘Coastal. managertent 2
{For mare information refer to Guide 18 48. -
‘Unless you answered “none of the. above" to
(at the application requires assessment by the
"Environmental Protection Agency (EPA).
ittan agency other than EPA is the assessment

‘manager for the application, EPABa tr
e@ [mans nay pete ..
{relation to this iat.

 

 

a4 11,

The application involves: (tick the applicable box/es)

Ci (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district’

Di (ii) a material change of use assessable under a planning scheme involving building
work, cartied out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2

Dili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

(iv) reconfiguring a fot’? assessable under schedule 8 of the {PA and in connection with
the construction of a canal!2 ~ complete Part M of Form 1

EX] (v) none of the above

 

 

10 Tidal work is defined in sch 40 of the IPA.

 

11 Prescribed tidat work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a focal government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area deciared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, whese the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.