Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
“APPENDIX 4: PRELIMINARY STORMWATER QUALITY. MANAGEMENT PLAN ISSUES PROCEDURES BIO-RETENTION “ZONE - _ Design Phase » Monitoring . Reporting _ Incidents - Corrective ‘Actions Construction Phase Monitoring Incidents Corrective Action Ensure that the Bio- Retention Zones are generally sized as per these reports : recommendations and to calculations: as per BBC. Water Sensitive Road ; Design ‘Guidelines, ) The Consulting Engineer i is to ensure that the Bio-| Retention Zones are located : | in a suitable area, sized.accordingly to guidelines and provided with the .- appropriate construction materials, subsoil-drainage. and outlet pipe and gross pollutant traps, sediment traps and oil traps. ay | Noosa Council is to review the Operational Works Plan. . The Bio-Retention Zones are not approved according to submitted plains. The Consultant will correct the ptacement of the: Bio-! Retention Zones to reflect Councils. requirements. : : Major changes will require further Stormwater Quality Management Modelling. The Contractor will install the’ Bio-Retention Zone in accordance with the Operational. Works drawings. The Contractor will carry out weekly inspections of the Bio-Retention Zone . (Including during the defects liability period). The following will be examined at each inspection: : Sediment build up on the surface Health of vegetation Pondage during major storms not infiltrating into the sand Erosion.at theoutlet Pondage during minor storms | Records are to be logged and Kept for verification of compliance ona. need basis. Sediment builds up on the surface. The vegetation dies off. Pondage of water is in excess of one hour. Erosion occurs. Pondage of water occurs at every minor rainfall event. Weed growth occurs, The Contractor will check up stream sediment control and fix failures. The sediment build up will-be shovelled off the non-woven geotextile of the Bio- Retention Zone. The geotextile will be replaced at the beginning of the defects liability period © : Unsuccessful plantings will be placed 2 as fequired. A normal allowance of 10% ‘should be made for unsuccessful plantings. 17.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.