_ISSUES -

“PROCEDURES

 

 

Corrective Action

(Cont)-.:

‘ Operational,
Phase

Monitoring ,

Incidents.

Corrective Action

: maintenance program.

 

Replace geotextile. where used, check and if necessary replace sand media:
‘with coarser sand. Check that slotted pipe is not blocked and outlet free’
draining. Replace and repair where necessary.

Erosion should be repaired and rock spalls placed upstream of the erosion so

‘as to dissipate the. flow across a broad area.

Dominating weeds shoitd be removed by hand and taken to the Council’ S
Refuse Centre. . woe . .

The Body Corporate | is to include the Bio-Retention Zones into their

The Body Corporate Landscape Gardener will carry out six fonihly -

‘inspections of the Bio- Retention Zone. ‘The following will be examined at-each
-inspection: - :

Sediment build up on the surface sunder the river stones ~
Health of vegetation

Pondage during major storms not infiltrating | into the sand
Erosion at the outlet

Pondage during minor.storms

Records are to be lagged and kept for verification of compliance 0 on a-need

basis.

Sediment builds up on the surface:

The vegetation dies off.

Pondage of water is in excess of one hour..

| Erosion occurs.

‘|. Pondage of water occurs at every minor rainfall’ event.

Weed growth occurs.

The Body Corporate Landscape Gardener will check’ up stream sediment
control and fix failures. The sediment build up will be shovelled off the non-
woven geotextile of.the Bio-Retention Zone.

Unsuccessful plantings wiil be ‘placed as s required. A. normal allowance of 10%
should be made for unsuccessful plantings. .

Replace geotextile, check and if necessary replace sand media with coarser
sand. Check that slotted pipe is not blocked and, outlet free draining. Replace
and repair y where necessary. .

Erosion Should be repaired and rock ‘$palls placed upstream of ‘the erosion so
as to dissipate the flow: across a broad area. .

Dominating weeds’ should be removed by | hand and: taker to the Courcit s
Refuse Centre. ~ : . .

 

18

 

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.