Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
_ISSUES - “PROCEDURES Corrective Action (Cont)-.: ‘ Operational, Phase Monitoring , Incidents. Corrective Action : maintenance program. Replace geotextile. where used, check and if necessary replace sand media: ‘with coarser sand. Check that slotted pipe is not blocked and outlet free’ draining. Replace and repair where necessary. Erosion should be repaired and rock spalls placed upstream of the erosion so ‘as to dissipate the. flow across a broad area. Dominating weeds shoitd be removed by hand and taken to the Council’ S Refuse Centre. . woe . . The Body Corporate | is to include the Bio-Retention Zones into their The Body Corporate Landscape Gardener will carry out six fonihly - ‘inspections of the Bio- Retention Zone. ‘The following will be examined at-each -inspection: - : Sediment build up on the surface sunder the river stones ~ Health of vegetation Pondage during major storms not infiltrating | into the sand Erosion at the outlet Pondage during minor.storms Records are to be lagged and kept for verification of compliance 0 on a-need basis. Sediment builds up on the surface: The vegetation dies off. Pondage of water is in excess of one hour.. | Erosion occurs. ‘|. Pondage of water occurs at every minor rainfall’ event. Weed growth occurs. The Body Corporate Landscape Gardener will check’ up stream sediment control and fix failures. The sediment build up will be shovelled off the non- woven geotextile of.the Bio-Retention Zone. Unsuccessful plantings wiil be ‘placed as s required. A. normal allowance of 10% should be made for unsuccessful plantings. . Replace geotextile, check and if necessary replace sand media with coarser sand. Check that slotted pipe is not blocked and, outlet free draining. Replace and repair y where necessary. . Erosion Should be repaired and rock ‘$palls placed upstream of ‘the erosion so as to dissipate the flow: across a broad area. . Dominating weeds’ should be removed by | hand and: taker to the Courcit s Refuse Centre. ~ : . . 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.