Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
. ISSUES "PROCEDURES . Operational : ’ Phase The Body Corporate i is sto include the GPr s/Sed Traps into their maintenance , ” : :program which is to be carried out by: Suttons Cleaning or equivalent licensed . contractor: oe , Monitoring” : The Contractor will carry out six rronthly inspections of the. GPT s/Sed Traps. ‘The following will be examined at each. ‘inspection’. . * Gross Pollution ‘e Sediment build up on the surface © Oil build up Records are to be logged and kept for verification of compliance ¢ ona 2 need basis. , : 1 Incidents Gross pollutants clog the filter Corrective Action | Sediment builds up. Oil builds up. . When the. sediment, oil or gross pollutants builds up to half the depth of the . storage tanks the sediment build up will be pumped out by a Suttons vacuum truck or equivalent and taken to a Noosa Council approved disposal facitity.- ‘Erosion should be repaired and rock spalls placed so as to dissipate the flow across a broad area. 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.