ISSUES

 

 

GTP/SEDIMENT
a0.
ARRESTOR

Design Phase

Monitoring. -

. Reporting
. -Incidents. ..

Corrective
Actions

Construction
Phase

Monitoring

Incidents

Corrective Action

 

PROCEDURES

Ensure that the GTP’ Ss 1 Sed. Traps are generally sized as per these reports _
recommendations and to- calculations as per Fox Systems Guidelines ofa-

: minimum of one trap per 300m* of i impervious é area.

The Consulting Engineer i is io ensure that the GPT’ s/Sed Traps are located in
a suitable area, sized according to guidelines and provided with’ the .

. appropriate erosion overfiow protection. ”

Noosa Council is to-review the Operational Works Plan.

The GPT’s/Sed Traps are roteproves according. to submitted plans.

The Consultant will.correct the placement of the Sediment Ponds to reflect .
Councils requirements.
Major changes will require further Stormwater Quality Management Modelling,

The Contractor will install the GPT's/Sed Traps in accordance with the
Operational Works drawings. -

The Contractor will carry out weekly inspections of the GPT's/Sed Traps
(Including during the defects liability period). The following will.be examined at ”
each inspection: .

Gross pollution build up-
-¢ Oilbuildup . © :
. * Sediment build up Erosion at the inlet & outlet

 

: Records are to be logged: and t kept for verification of compliance on a need
‘| basis. - :

Gross pollutants clog basket.
Sediment builds up. ~

Erosion-occurs.

‘| Olt builds: up.

“When the sediment, oll or gross 5 pollutants builds up to half the: depth of the

storage tanks the sediment build up will be pumped out by a Suttons vacuum
truck or equivalent and taken to a Noosa Council approved disposal facility.

Erosion should be repaired and: rock spalls placed so as to dissipate the flow
across a-broad area.”

 

19

 

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.