Appendix B - Engineering Plans

of 13

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                      4.    MATERIAL WON FROM SITE TO BE INSPECTED BY ENGINEER
GENERAL                                                      3.   CONSULTATION WITH AFFECTED PARTIES IS MANDATORY           FOR APPROVAL PRIOR TO USE AS FILLING UNDER SLABS.           NON-SAND FILL TO 95% MAXIMUM
                                                                  WHEN IDENTIFYING HAZARDS,ASSESSING RISKS AND              ANY IMPORTED FILL TO HAVE A MINIMUM CBR VALUE OF            DRY DENSITY STANDARD
1.   THESE ENGINEERING DRAWINGS HAVE BEEN PREPARED
                                                             DECIDING ON CONTROL MEASURES.                            15%. ALL FILL TO BE COMPACTED TO EITHER CONTROLLED                COMPACTION) IN ACCORDANCE
FROM INFORMATION AVAILABLE AT THE TIME. AS THIS
                                                                                                                      OR ROLLED FILL STANDARD AS SPECIFIED ELSEWHERE                    WITH AUSTRALIAN STANDARD
INFORMATION MAY BE THE SUBJECT OF CHANGE PRIOR TO            4.  CONSTRUCTION SHALL BE CARRIED OUT USING SAFE
OR DURING CONSTRUCTION, THE CONTRACTOR IS REQUESTED          WORK METHODS AND IN ACCORDANCE WITH THE FOLLOWING                                                                          COMPACTION TESTS SHALL BE
                                                                                                                      5.   WHERE SERVICE TRENCHES ARE REQUIRED TO BE
TO ADVISE THE ENGINEER WHERE DIFFERENCES OCCUR. THESE
DRAWINGS SHALL NOT BE USED FOR FINAL SETOUT OF THE
                                                             DOCUMENTS:-                                              EXCAVATED BELOW FOOTING BASE LEVEL, SIDE OF                       CARRIED OUT ON EACH LAYER AS                            LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                   LTD
                                                                                                                      TRENCH SHALL BE LOCATED AWAY FROM SIDE OF FOOTING                 THE FILLING IS PLACED. IF THE
PROJECT UNLESS SPECIFICALLY STATED.
                                                             LEGISLATION                                              BY THE SAME DISTANCE THAT THE TRENCH IS BELOW                     COMPACTION STANDARD
                                                                                                                      FOOTING BASE. WHERE THIS CANNOT BE ACHIEVED, THE                  SPECIFIED IS NOT ACHIEVED, THEN
2.   INSPECTIONS ARE REQUIRED TO BE PERFORMED BY A
                                                             -       WORKPLACE HEALTH AND SAFETY ACT 2011             STRUCTURAL ENGINEER SHALL BE CONTACTED FOR                        A "PIER AND SLAB" AND "PIER AND
DULY APPOINTED COMPETENT PERSON(S). REFER TO PRINCIPLE
                                                             -       WORKPLACE HEALTH AND SAFETY REGULATION 2011      FURTHER DIRECTION.                                                BEAM" FOOTING DESIGN SHALL BE
CONTRACTOR, CERTIFIER, STATE GOVERNMENT LEGISLATION
                                                                                                                                                                                        ADOPTED WITH ALL PIERS FOUNDED
OR COUNCIL FOR FOR HOLD POINTS.
                                                                                                                      6.   ALL SOIL CONDITIONS SHALL BE AS PER SPECIFIED                ON THE NATURAL UNDERLYING
                                                             QUEENSLAND GOVERNMENT CODES OF                           GEOTECHNICAL REPORT. WHERE CONDITIONS VARY FROM                   MATERIAL.
3.   THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH        PRACTICE                                                 REPORT THE GEOTECHNICAL ENGINEER SHALL BE CONTACTED
     ALL ARCHITECTURAL AND OTHER CONSULTANTS
                                                                                                                      FOR DIRECTIONS
DRAWINGS AND SPECIFICATIONS AND WITH SUCH OTHER
WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE
                                                             -    CONFINED SPACES: CODE OF PRACTICE 2016                                                                           STORMWATER DRAINAGE NOTES
                                                             -    FORMWORK CODE OF PRACTICE 2016                      7.   THE CONTRACTOR(S) SHALL FULLY INFORM THEMSELVES
COURSE OF THE CONTRACT.                                      -    HAZARDOUS MANUAL TASKS: CODE OF PRACTICE 2016            OF THE GROUND CONDITIONS ON SITE PRIOR TO               1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN
                                                             -    HOW TO MANAGE WORK HEALTH AND SAFETY RISKS: CODE    COMMENCEMENT OF THE WORKS AND ADOPT SEEPAGE AND              WRITING PRIOR TO CARRYING OUT OF THE WORKS
4.  ALL DISCREPANCIES SHALL BE REFERRED TO THE                    OF PRACTICE 2011                                    DRAINAGE CONTROL AND CONSTRUCTION PRACTICES
ARCHITECT FOR DECISION BEFORE PROCEEDING WITH THE            -    MANAGING NOISE AND PREVENTING HEARING LOSS AT       APPROPRIATE FOR THE SITE CONDITIONS.                         2.ALL LEVELS TO AHD.
WORK.                                                        WORK: CODE OF PRACTICE 2015
                                                             -    MANAGING THE RISK OF FALLS AT WORKPLACES: CODE OF   8.   WHERE ANY FILLING IS CARRIED OUT ON THE SITE AFTER      3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED
5.    ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE         PRACTICE 2011                                            THE COMPLETION OF THE SITE INVESTIGATION, THE           OTHERWISE.
      WORK SHALL BE VERIFIED BY THE CONTRACTOR BEFORE        -    MANAGING WORK ENVIRONMENT AND FACILITIES: CODE OF   FOLLOWING REQUIREMENTS SHALL BE FOLLOWED:
      CONSTRUCTION AND FABRICATION IS COMMENCED.                  PRACTICE 2011                                                                                                    4.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE
                                                             -    MOBILE CRANE: CODE OF PRACTICE 2006                      THE SITE SHALL BE STRIPPED OF ALL VEGETATION            BEFORE WORK COMMENCES.
6.    THE ENGINEER'S DRAWINGS SHALL NOT BE SCALED.           -    SCAFFOLDING: CODE OF PRACTICE 2009                       PRIOR TO THE PLACEMENT OF ANY FILLING
                                                             -    STEEL CONSTRUCTION: CODE OF PRACTICE 2004                MATERIAL.                                               5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE
7.  DURING CONSTRUCTION THE CONTRACTOR SHALL BE              -    TILT-UP AND PRE-CAST CONSTRUCTION INDUSTRY CODE                                                                  DRAWING.
RESPONSIBLE FOR MAINTAINING THE STRUCTURE IN A STABLE             OF PRACTICE 2003                                         COMPACTION STANDARDS FOR FILLING MATERIAL
CONDITION AND ENSURING NO PART SHALL BE OVERSTRESSED         -    TOWER CRANE: CODE OF PRACTICE 2006                                                                               6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS
UNDER CONSTRUCTION ACTIVITIES.                               -    WORK HEALTH AND SAFETY CONSULTATION,                          CONTROLLED FILLING
                                                             CO-OPERATION AND CO-ORDINATION CODE OF PRACTICE                                                                       7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE
8.   WORKMANSHIP AND MATERIALS ARE TO BE IN                  2011                                                               (A)   SAND FILLING UP TO 800 DEEP, PLACED IN       VERIFIED ON SITE WITH THE REVLEVANT AUTHORITY PRIOR TO
ACCORDANCE WITH THE RELEVANT CURRENT S.A.A. CODES
INCLUDING ALL AMENDMENTS, AND THE LOCAL STATUTORY
                                                             QUEENSLAND GOVERNMENT CODES OF                                           MAXIMUM 300mm THICK LAYERS AND               THE COMMENCEMENT OF WORKS
                                                             PRACTICE (CONTINUED)                                                     COMPACTED WITH A VIBRATING ROLLER TO
AUTHORITIES, EXCEPT WHERE VARIED BY THE CONTRACT                                                                                      ACHIEVE A MINIMUM DYNAMIC CONE PENETRO-      8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE
DOCUMENTS.
                                                                                                                                      METER READING OF 7 BLOWS PER 300             MAINTAINED TO ENSURE SAFE PASSAGE OF TRAFFIC AND
                                                             -   SAFE DESIGN OF STRUCTURES CODE OF PRACTICE 2014
                                                                                                                                      PENETRATION (REFER AS 1289.F3.3).            PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF
9.   THE APPROVAL OF A SUBSTITUTION SHALL BE SOUGHT          OTHER REFERENCES:
                                                             -   NATIONAL CODE OF PRACTICE FOR PRECAST, TILT UP AND                                                                THE LOCAL AUTHORITY.
FROM THE ENGINEER, BUT IS NOT AN AUTHORIZATION FOR                                                                                    SAND FILL MAY BE FLOODED IF NECESSARY TO
AN EXTRA. ANY EXTRA INVOLVED MUST BE TAKEN UP WITH               CONCRETE ELEMENTS IN BUILDING CONSTRUCTION, 2008
                                                                                                                                      ACHIEVE THIS COMPACTION STANDARD,            9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH
THE ARCHITECT AND/OR PRINCIPLE BEFORE THE WORK                                                                                        PROVIDED THE WATER CAN SUBSEQUENTLY BE       CURRENT LOCAL AUTHORITIES SPECIFICATIONS AND
COMMENCES.                                                   CONTRACTORS SUBMISSIONS                                                  DRAINED FROM THE SITE.                       STANDARDS.
10.  UNLESS NOTED OTHERWISE ALL DIMENSIONS ARE IN
                                                             1.   THE REINFORCEMENT, PRE-STRESSING AND STRUCTURAL               (B)   NON-SAND FILLING UP TO 400 DEEP, PLACED IN   10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING
MILLIMETRES                                                                                                                           MAXIMUM 150 mm THICK LAYERS AND
                                                                  STEEL MATERIAL SUPPLIER MUST BE CERTIFIED BY ACRS                                                                ALL RELEVANT AUTHORITIES AND PAYING ALL FEES NECESSARY
                                                                  (AUSTRALIAN STANDARDS CERTIFICATION AND                             COMPACTED WITH A MECHANICAL ROLLER.          BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING
11.   ALL LEVELS ARE EXPRESSED IN METRES.
                                                             VERIFICATION OF REINFORCING, PRE-STRESSING AND                           CLAY FILL SHALL BE MOIST DURING              SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A
                                                             STRUCTURAL STEELS) FOR THE SUPPLY OF REINFORCEMENT,                      COMPACTION.                                  RESULT OF THE FOOTPATHS AND PRIVATE PROPERTY SHALL BE
12.   ALL PROPS AND FORMWORK FOR BEAMS AND SLABS SHALL
                                                             PRE-STRESSING STRUCTURAL STEEL.                                                                                       REINSTATED TO THEIR ORIGINAL CONDITION.
      BE REMOVED BEFORE CONSTRUCTION OF ANY MASONRY
                                                                                                                                (C)   CONTROLLED FILLING SHALL CONTINUE FOR AT
      WALLS OR PARTITIONS ON THE FLOOR.
                                                             2.      SUBMIT CURRENT CERTIFICATES.                                     LEAST 1 METRE PAST THE EDGE OF THE           11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND
                                                                                                                                      FOOTING BEAM AND SHALL BE BATTERED BACK      DRAINAGE OUTLETS FROM THE KERB AND CHANNEL INCLUDING
13.   ALL NON LOAD BEARING WALLS SHALL BE KEPT CLEAR OF
                                                                                                                                      TO THE ORIGINAL SURFACE WITH A SLOPE OF      ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE REMOVED
      THE UNDERSIDE OF SLABS AND BEAMS BY 20mm
                                                                                                                                      NO MORE THAN 1:2 (VERT : HOR).
                                                             WATERPROOFING                                                                                                         AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO
                                                                                                                                                                                   THE LOCAL AUTHORITIES CURRENT SPECIFICATIONS AND OR
14.  UNLESS OTHERWISE SHOWN. SUBTERRANEAN TERMITE
                                                                                                                                (D)   WHERE THE DEPTH OF FILLING MATERIAL          STANDARDS
PROTECTION SHALL BE IN ACCORDANCE WITH AS 3660 - PART 1      1.  REFER TO ARCHITECTS DOCUMENTATION FOR                                EXCEEDS THAT SPECIFIED ABOVE, THE FILLING
AND THE BCA.                                                 WATERPROOFING DETAILS AND PRODUCT SPECIFICATIONS                         MATERIAL SHALL BE COMPACTED                  12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE
                                                             GENERALLY.                                                               AS FOLLOWS:-                                 REQUIREMENTS OF THE WORKPLACE HEALTH AND SAFETY ACT
15.  NON-STRUCTURAL ITEMS SUCH AS DAMP PROOF
                                                                                                                                                                                   1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH
COURSING, FLASHING AND WEEP HOLES ARE NOT SHOWN              2.   WHILE THE SELECTION AND DETAILING OF                     SAND FILL TO 65% DENSITY INDEX IN                       THIS ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE
FOR CLARITY. REFER TO THE ARCHITECTURAL DETAILS AS           WATERPROOFING PRODUCTS IS OUTSIDE THE SCOPE OF                ACCORDANCE WITH AS1289.E6.1                             THE REQUIREMENTS OF THIS SPECIFICATION WITH REGARD TO
REQUIRED                                                     THE STRUCTURAL DOCUMENTATION, THE FOLLOWING   ITEMS
                                                                                                                                                                                   'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE
                                                             MUST BE NOTED:                                                NON-SAND FILL TO 95% MAXIMUM                            FULFILLED.
                                                                                                                           DRY DENSITY (STANDARD
16. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL           (i)     REINFORCED CONCRETE AND REINFORCED                    COMPACTION) IN ACCORDANCE                               13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH
ROOFWATER PIPES TO BE uPVC                                           CONCRETE BLOCKWORK ON THEIR OWN ARE NOT               WITH AUSTRALIAN STANDARD                                FINISHED SURFACE, AND PIPES SHALL NOT PROJECT INSIDE THE
                                                                     WATERPROOF.
                                                                                                                                                                                   SHAFT OF THE PIT.
17. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL
                                                                                                                           COMPACTION TESTS SHALL BE
COMPLETION OF WORKS AND 2. ALL PROPOSED OPERATIONAL          (ii)    LINDSAY CONSULTING PTY LTD RECOMMENDS                 CARRIED OUT ON EACH LAYER AS                            14.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE
WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH                        WATERPROOFING MEASURES FOR ALL EXTERNAL               THE FILLING IS PLACED. IF THE                           (MINIMUM SEWER CLASS SN8) TO AS 14. 1260 OR APPROVED
COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND                      SLABS OVER USABLE SPACES AND EXTERNAL SINGLE          COMPACTION STANDARD SPECIFIED                           EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE
COUNCIL'S DECISION                                                   SKIN MASONRY.                                         IS NOT ACHIEVED, THEN A "PIER AND                       50mm EXCEPT WHERE REDUCED COVER IS REQUIRED TO
                                                                                                                           SLAB" AND "PIER AND BEAM"                               DISCHARGE TO THE KERB AND CHANNEL.
18.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH       (iii)   FAILURE TO PROVIDE WATERPROOFING, OR                  FOOTING DESIGN SHALL BE
COUNCIL'S STANDARD DRAWING AND SHALL BE CONSTRUCTED                  INADEQUATE WATERPROOFING MEASURES MAY                 ADOPTED WITH ALL PIERS FOUNDED                          15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3:
STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD                         RESULT IN LEAKS.                                      ON THE NATURAL UNDERLYING                               PIPES SHALL COMPLY WITH - 1.0% (MIN) GRADE FOR PIPES < 150
                                                                                                                           MATERIAL.                                               DIA. - 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.
19. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND               (iv)    PROLONGED LEAKS CAN LEAD TO PREMATURE
LINEMARKING SHALL COMPLY WITH THE CURRENT MANUAL OF                  DETERIORATION OF STRUCTURAL ELEMENTS.                      ROLLED FILLING                                     16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE
UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
                                                                                                                                                                                   CONSTRUCTED WITH 32 MPa
MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING            (v)     WATER LEAKING THROUGH CONCRETE STRUCTURES                  (A)   SAND FILLING UP TO 600 DEEP, PLACED IN
OUT". COUNCIL DOES NOT APPROVE OF BLACKING OUT OF                    TYPICALLY CONTAINS CALCIUM WHICH CAN DAMAGE                      MAXIMUM 300mm THICK LAYERS AND               17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE
EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED                PAINTWORK                                                        COMPACTED BY REPEATED ROLLING WITH AN        LAYOUTS.
FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT
                                                                                                                                      EXCAVATOR.
ROAD CROSSINGS AS APPLICABLE.
                                                             EARTHWORKS                                                                                                            18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS
                                                                                                                                (B)   NON-SAND FILING UP TO 300 DEEP, PLACED IN    AND PARKING AREAS SHALL BE (i) 75% MINIMUM DENSITY FOR
SAFETY                                                       1.      EARTHWORKS TO COMPLY WITH AS3798.                                MAXIMUM 150mm THICK LAYERS AND               COHESIONLESS MATERIAL (AS 1289 E5.1) AND (ii) 90% RELATIVE
                                                                                                                                      COMPACTED BY REPEATED ROLLING WITH AN        DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)
1.  REFER TO THE PROJECT DOCUMENTS FOR AN                    2.  STRIP SITE OF ALL TOPSOIL, VEGETATION AND                            EXCAVATOR
ASSESSMENT OF THE RISKS ASSOCIATED WITH THE ANY              DELETERIOUS MATTER TO A MINIMUM DEPTH OF 150 mm.
WORKS AND RECOMMENDED TREATMENTS.                                                                                               (C)   WHERE THE DEPTH OF FILLING MATERIAL
                                                             3.   PROOF ROLL SUBGRADE TO REVEAL SOFT SPOTS. SOFT                      EXCEEDS THAT SPECIFIED ABOVE, THE FILLING
2.  WHERE THERE IS IS NO OVER RIDING PROJECT DOCUMENT/       SPOTS TO BE REMOVED AND BACKFILLED. ALL NATURAL                          MATERIAL SHALL BE COMPACTED AS
    SPECIFICATIONS THEN REFER TO THE PRINCIPLE               SUBGRADE IS TO BE COMPACTED TO ACHIEVE A DENSITY                         FOLLOWS:-
CONTRACTOR FOR ALL SAFETY REQUIREMENTS                       INDEX OF 70%.                                                 SAND FILL TO 65% DENSITY INDEX IN
                                                                                                                           ACCORDANCE WITH AS1289.E6.1
Log in to download the original file

Appendix B - Engineering Plans.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.