Original source · versioned page text
RFI -Civil Technical Memorandum
may create additional pedestrian risk; and • any infrastructure within Council’s road reserve must be DDA compliant, achieve a suitable drainage outcome and be designed and certified by a RPEQ. Information Required Provide a detailed design of the proposed “Basement Access” from the existing pedestrian footpath and any “redesigned” pedestrian footpaths/stairs. The detailed design must be prepared by a suitably qualified person (RPEQ) and include, but not be limited to: a. the removal of all garden beds and retaining structures for the road reserve; and b. a detailed design of the pedestrian footpath and staircase for the full length of the site frontage to the road reserve (as shown below), including sections through the “Basement Access” and southern elevations. RECOR RESPONSE: The detailed design of the proposed “Basement Access” and the redesigned pedestrian footpaths/stairs has been provided in the Operational Works drawings, reviewed and certified by RECORs RPEQ. The design incorporates the removal of all garden beds and retaining structures within the road reserve, as requested. The proposed pedestrian access maintains appropriate grading and is not expected to result in any increase that could be deemed unacceptable by Council for access to the stairs. The revised plans are included in the updated submission for Council’s review. Issue – On Site Detention Volume SCCE’s Stormwater Management Plan (24083, Rev. 00) dated 8 November 2024 proposes to limit pre-developed unmitigated peak flows against the mitigated post-development flows during various storm events through 2.5m3 and 20m3 detention tanks. Council is concerned that the available detention volume may be undersized as it appears that SCCE’s Rational Method Summary Calculations – Developed Case Unmitigated has not considered a 20% increase in rainfall intensity (i.e., climate change factor). Information Required Provide confirmation that a 20% increase in rainfall intensity has been included as part of the sizing of the on-site detention tanks as required by Acceptable Outcome 2.4 of the Water Quality and Drainage Code. 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original