RFI -Civil Technical Memorandum
Issue – Extent of Filling in the Elanda Street Road Reserve SCCE’s Earthworks Layout Plan (C0202, Rev. B) dated 22 November 2024 does not include sufficient detail for Council to accurately assess the extent of earthworks in the Elanda Street road reserve. Information Required Provide additional detail demonstrating the extent of proposed earthworks within the road reserve. The additional detail must be prepared by a suitably qualified person and include, but not be limited to: a. spot levels indicating the fill above natural ground; b. demonstrate that existing subsurface infrastructure will not be adversely affected; and c. ensure the exiting drainage regime is not worsened. RECOR RESPONSE: The updated plans include spot levels and contours, clearly demonstrating the extent of proposed earthworks within the road reserve, including the fill above natural ground. The design has also accounted for existing subsurface infrastructure, which has been assessed and confirmed as not being adversely affected. Additionally, the drainage regime will be improved through the construction of the kerb and channel along the frontage, facilitating the natural overland flow to the west. Issue – Driveway Crossover and Internal Down Ramp SCCE’s Engineering Plans does not include sufficient detail about the proposed driveway crossover and internal down ramp. Any driveway crossover and internal down ramp must meet the recommendations contained in ITE Consulting’s Traffic Impact Statement (Report No. 001, Rev. 01) dated 25 November 2024. Information Required Provide additional detail about the proposed driveway crossover and internal down ramp. The additional detail must be prepared by a suitably qualified person, be suitable for construction, meet 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original