2020-08-11 Services & Organisation Committee Agenda

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Services & Organisation
     Committee Meeting


              Tuesday, 11 August 2020


                    commencing at 1.30pm
           Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Amelia Lorentson, Clare Stewart, Frank Wilkie




                       “Noosa Shire – different by nature”
Log in to download the original file

2020-08-11 Services & Organisation Committee Agenda(PDF, 4MB).pdf · 4.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 76 (of 100)

Section 2

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                    11 AUGUST 2020


TABLE OF CONTENTS

ITEM                                                                         PAGE

ATTENDANCE & APOLOGIES                                                            -

PRESENTATIONS                                                                     -

DEPUTATIONS                                                                       -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                       3

1      APPOINTMENT OF 2021 SHOW HOLIDAY                                          3

2      TENDER CONSIDERATION       PLAN   -   COUNCIL   FACILITY   DESIGN   AND
       CONSTRUCTION                                                              5

REPORTS FOR NOTING BY THE COMMITTEE                                              9

3      COMMUNITY SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20                9

4      CORPORATE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20                25

5      NOOSA HOLIDAY PARKS UPDATE REPORT TO 30 JUNE 2020                         33

6      EXECUTIVE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20                38

7      CAPITAL PROGRAM DELIVERY STATUS - 30 JUNE 2020                            48

8      INFRASTRUCTURE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20           59

9      OPERATIONAL PLAN PROGRESS REPORT - 4TH QUARTER 2019-20                    73

10     YEAR IN REVIEW – 2019-20                                                  87

CLOSED SESSION                                                              -




                                                                      Page 2 of 100

Section 3

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  11 AUGUST 2020



REPORTS FOR CONSIDERATION OF THE COMMITTEE
1                        APPOINTMENT OF 2021 SHOW HOLIDAY
DOCUMENT INFORM AT ION




Author                           Chief Executive Officer, Brett de Chastel
                                 CEO’s Office

Index                            ECM/ Subject/ Public Holidays - Noosa Show Day

Attachments                      Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 11 August 2020 and request the Chief Executive Officer to write to the
Office of Industrial Relations requesting the appointment of Friday, 10 September 2021 as a
Show Holiday for the Noosa Shire.


REPORT
Under the Holidays Act 1983, the Minister can appoint, upon request by a local government, a
special holiday within a district. Holidays of this nature are usually appointed for an annual
agricultural, horticultural or industrial show.

The Noosa Country Show has traditionally been held annually on the second weekend in
September. For 2021, the Noosa Country Show is proposed for the weekend of 10 – 11
September.

Requests for the appointment of a special holiday for 2021 are required to be submitted no later
than 21 August 2020. After consultation with the Noosa Show Society, it is proposed that an
application be made to the Minister to appoint Friday, 10 September 2021 as the Show Holiday
for Noosa Shire for 2021.

The 2020 Noosa Country Show has been cancelled due to the coronavirus COVID-19 pandemic.
The Noosa Show Society are now focussed on preparations for the Show in 2021.

Previous Council Consideration
Nil.

Finance
Nil.

Risks & Opportunities
Nil.




                                                                                    Page 3 of 100

Section 4

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 11 AUGUST 2020


Consultation
External Consultation - Community & Stakeholder
Noosa Show Society

Internal Consultation
Nil.

Departments/Sections Consulted:

X      Chief Executive Officer    Community Services                      Corporate Services
       Executive Officer          Director                                Director
X      Executive Support          Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

       Executive Services         Environment & Sustainable Development   Infrastructure Services
       Director                   Director                                Director
       Community Engagement       Building & Plumbing Services            Asset Management
       Customer Service           Development Assessment                  Buildings and Facilities
       Governance                 Economic Development                    Civil Operations
       People and Culture         Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 4 of 100

Section 5

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                    11 AUGUST 2020


2                        TENDER CONSIDERATION               PLAN      -   COUNCIL       FACILITY      DESIGN      AND
                         CONSTRUCTION
DOCUMENT INFORM AT ION




Author                               Community Development Manager, Alison Hamblin
                                     Community Services Department

Index                                ECM/ Branch Management/ Community and Development

Attachments                          Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 11 August 2020 and:
A.                       Resolve to prepare a Tender Consideration Plan for the procurement of Design and
                         Construction services for a temporary accommodation house, under section 230 of the
                         Local Government Regulation 2012 and;
B.                       Delegate authority to the Chief Executive Officer to:
                         1.   Prepare, finalise and adopt the plan; and
                         2.   Enter into contract/s, within the Chief Executive Officer’s financial delegation, in order
                              to achieve the objectives of the Tender Consideration Plan.


REPORT
The purpose of this report is to provide an update on the procurement process to build
accommodation for women and children leaving domestic violence situations and seek Council’s
resolution to prepare a Tender Consideration Plan, to procure the necessary design and
construction services to complete the project.
1.                       Background
Council received $1,830,000 funding through the Queensland Government’s “Works for
Queensland” program as part of the coronavirus Covid-19 state recovery measures. Council
allocated $250,000 of this funding to build new safe, secure accommodation to support women
and children leaving domestic violence situations.

The funding conditions require the project to be completed by 30 June 2021. Council officers
have been reviewing options for the procurement of the necessary design and construction
services while respecting the sensitivity of the project.
2.                       Considerations
This project is a critical domestic violence initiative that requires high degrees of discretion and
confidentiality in its administration. A public request-for-tender process, being the general
procurement approach for a project of this value, presents an unacceptable risk in this situation
by potentially compromising the confidential nature of the project, particularly the location of the
accommodation. This is primarily due to the request-for-tender having to be advertised in the
public domain and include an appropriate level of information about the project’s desired
services, delierables and outcomes, for tenderers to be able to respond in sufficient detail.

                                                                                                        Page 5 of 100

Section 6

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 11 AUGUST 2020


The minimum requirement for the accommodation includes:
   2/3 bedrooms including 1 of the bedrooms to be a ‘safe-room’
   2 access points (front door and back door)– with ‘Crim-Safe’ security screens
   Covered outdoor area
   1 Full Bathroom
   Drive way access
   Under Dwelling security

While it has been concluded that a public request-for-tender process is not appropriate for this
project, Council must continue to ensure that it procures services in a manner that meets
legislative requirements and results in value for money.

As such, Council officers reviewed two options provided in the Local Government Regulation
2012 to meet these requirements as follows:.
1.   Section 235 - Council could consider applying an exception under section 235 of the
     Regulation, due to the confidential nature of the engagement as follows:
     (b)   the local government resolves that, because of the specialised or confidential nature
           of the services that are sought, it would be impractical or disadvantageous for the
           local government to invite quotes or tenders;
2.   Section 230 - Council could also resolve to use a Tender Consideration Plan under section
     230 of the Regulation.

Council officers have determined that the Tender Consideration Plan (Section 230) is a more
robust approach to adopt. It provides more detail in regard to the proposed process and a greater
focus on competitive procurement while still maintain confidentiality over the sensitive aspects of
the project.
3.   Tender Consideration Plan
Division 3 – Exceptions for medium sized and large sized contractual arrangements of the Local
Government Regulation 2012 allows for a local government to enter into a large size (>$200,000
GST Inc.) contractual arrangement, without first inviting Tenders. Specifically, section 230 of the
Regulation enables Council to resolve to prepare a tender consideration plan that addresses the
following:
(a) the objectives of the plan; and
(b) how the objectives are to be achieved; and
(c) how the achievement of the objectives will be measured; and
(d) any alternative ways of achieving the objectives, and why the alternative ways were not
      adopted; and
(e) the proposed terms of the contract for the goods or services; and
(f)   a risk analysis of the market from which the goods or services are to be obtained

Once prepared, it allows for Council to undertake a procurement approach aligned with the
objectives outlined in the plan.

The objective of the Tender Consideration Plan is to enter into a contract with a suitable, selected
contractor to design and construct the accommodation facility which achieves value for money for
Council whilst maintaining confidentiality over the project. The Tender Consideration Plan will be
developed by mid-September and reviewed and approved by the Chief Executive Officer prior to
the procumement process commencing.


                                                                                     Page 6 of 100

Section 7

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 11 AUGUST 2020


Council staff have undertaken initial market research and identified up to four (4) regional
contractors that publicly advertise the ability to design, construct and deliver buildings of a type
which appear suitable for this project as well as meeting the aims of the Works for Queensland
program. All four contractors are located within the Sunshine Coast/Gympie Region including one
located in the Noosa Shire Council local government area.

The following weighted criteria is proposed:

 Criteria                             Weighting
 Price                                35
 Fit for Purpose Design               25
 Capability/Past Performance          15
 Contribution to Community            15
 Contribution to Local Economy        10


Previous Council Consideration
Ordinary Meeting Minutes, 16 July 2020, Item 4, Page 10

That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 13 July 2020 and endorse the various projects submitted to the State and Commonwealth
governments for funding as set out in the report.

Finance
The direct costs ($250,000) of the accommodation project is to be delivered under the Works for
Queensland funding program with the exception of some overhead costs such as procurement,
governance and financial management. Whole of life cost implications (i.e. depreciation,
operations and maintenance) will need to be considered and factored into future Council budgets
where applicable. Any additional costs such as furniture, fixtures and fittings will be contributed
by community partners.

Risks & Opportunities
This funding provides Council with an opportunity to achieve projects on behalf of the Noosa
community that would not otherwise be undertaken due to financial constraints as a result of
COVID-19. The funding program has very tight timeframes. This has been evident in both the
submission/bid process and also in non-negotiable timeframes for completion by 30 June 2021.
A Project Control Group (PCG) will be established to ensure that this project will be well
managed and completed on time.

Consultation
External Consultation - Community & Stakeholder
Domestic Violence Service Agencies




                                                                                     Page 7 of 100

Section 8

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 AUGUST 2020


Internal Consultation
Departments/Sections Consulted:

   Chief Executive Officer   x    Community Services                      x   Corporate Services
   Executive Officer         X    Director                                    Director
   Executive Support         x    Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                   x   Procurement & Fleet
                                  Local Laws                              x   Property
                                  Waste & Environmental Health                Revenue Services

   Executive Services        x    Environment & Sustainable Development   x   Infrastructure Services
   Director                       Director                                    Director
   Community Engagement           Building & Plumbing Services                Asset Management
   Customer Service          x    Development Assessment                      Buildings and Facilities
   Governance                     Economic Development                        Civil Operations
   People and Culture             Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             x   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 8 of 100

Section 9

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 AUGUST 2020


REPORTS FOR NOTING BY THE COMMITTEE
3                        COMMUNITY SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20
DOCUMENT INFORM AT ION




Author:                           Director Community Services, Kerri Contini
                                  Community Services Department

Index:                            ECM/ Subject/ Branch Manager/ Community Services

Attachments                       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Community Services to the Services & Organisation
Committee meeting dated 11 August 2020 providing an update on the operations of the
Community Services Department for the period 1 April to 30 June 2020.


REPORT
The adopted organisation structure includes the following branches under the Community
Services Department:

                       Director’s Office;
                       Community Development and Community Grants;
                       Community Facilities (Including Noosa Community Support, The J, Bicentennial
                         Community Centre, Noosa Aquatic Centre and Noosa Leisure Centre);
                       Libraries and Galleries;
                       Local Laws: and
                       Waste, Environmental Health and Cemeteries.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Community Services Department for the period 1 April to 30 June 2020.




                                                                                         Page 9 of 100

Section 10

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                 11 AUGUST 2020


COMMUNITY SERVICES DEPARTMENT

BRANCH ACTIVITIES                RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
DIRECTOR’S OFFICE
Rufous St Precinct Development      Detailed design for new Peregian           Completing necessary processes as          Commence tender process for
                                      Beach House completed                        part of Ri-Con liquidation                   community house and green space
                                    Concept options for conversion of          Preparing for tender process for           Progress design for conversion of
                                      existing   community       house   to        community house and green space              existing community house
                                      extension of Digital Hub completed
Disaster Recovery                   Developed      2-year      Community       Recruiting Community Development           Reviewing third party Recovery and
                                      Development Bushfire Recovery                Recovery Officer                             Evacuation arrangements
                                      Plan, outlining areas of need for          Working with community on 1-year           Undertake Evacuation Centre audits
                                      human social recovery                        anniversary     events/activities  in      Investigate and develop a Disaster
                                    Wrote, submitted and awarded                 Peregian Beach, Cooroibah and                Preparedness guide/reference for all
                                      tender for 2-year CDO recovery               North shore bushfire affected areas          disasters for residents
                                      position (Category C)                        Event focus to build community             Look at events and activities in the
                                    Received $127 million from Federal           resilience and disaster preparedness         region that could build community
                                      Government (Category D) with               Working with fire affected areas to          resilience and help prepare for future
                                      $350k allocated to Human Social              assist vulnerable residents and              disaster events
                                      recovery                                     community groups in their recovery
                                    Formed an Aged Care/Retirement               and resilience
                                      forum to discuss recent bushfires          Coordinating Mental Health First Aid
                                      and disaster preparedness as a               training for front line Council staff
                                      community and sector Identified the          and community representatives to
                                      need for a consultant to work with           better assist in disasters and
                                      the sector and the disaster                  recovery
                                      management and evacuation plans
                                    Submitted a funding application for a
                                      consultant to carry out the above
                                    Continue to support those residents
                                      affected by the recent fires




                                                                                                                                                   Page 10 of 100

Section 11

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                  11 AUGUST 2020


BRANCH ACTIVITIES                RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
COMMUNITY DEVELOPMENT
Social Strategy Implementation      Developed a Human Social COVID-             COVID-19 Recovery                          Investigate the potential for growth
                                      19 Recovery Plan                            Supporting social service agencies           of senior's health and wellbeing
                                    Facilitated two Northern Social               in delivery of ER services Virtual           program (Ageing Well Noosa) in
                                      Services Networks and supported               Social Services Hub continues until          collaboration with Noosa Community
                                      agencies with their COVID-19                  regular service delivery available           Support and Noosaville Leisure
                                      Response                                    Planning for reopening of the Social         Centre to put on more classes within
                                                                                    Services Hub                                 the region to support demand
                                    Supported vulnerable people and
                                      Not for Profits organisations               Ongoing participation in Place-            Host a series of senior's week 2020
                                                                                    Based Response to Homelessness               events to celebrate seniors in our
                                    Relaunched Ageing Well Noosa –
                                                                                  Ongoing Community Meal Delivery              region 15-23 August
                                      Noosa's positive ageing health and            Program in partnership with Oz
                                      wellbeing initiative Over 65’s classes                                                   Develop programs, activities and
                                                                                    Harvest and Urban Angels
                                      at Cooroy, Cooran and Noosaville                                                           events      that    could      activate
                                                                                  Visiting Halls & Community Centres           community and encourage social
                                    Grow Your Arts E-News going out               with Environmental Health Officers           inclusion post COVID-19 and
                                      monthly and Community Connect e-              to provide COVID-19 advice to                Bushfires - Connecting Noosa
                                      news going out fortnightly since              reopen                                       (program from Sept to March)
                                      March 2020 updating community on            Coordinate Halls & Community               Complete concept designs for the
                                      COVID issues and assistance in                Centres meet and greet and                   Cooroy      gymnastics     hall    and
                                      community                                     information share – 8 August                 soccer/cricket              clubhouse
                                    Partnered with the Australian                 Ridgewood Hall                               redevelopment project
                                      Skateboarding Community Initiative          Supporting the completion of               Progress tenure of Tewantin-Noosa
                                      to     deliver     a   Noosa       web        projects funded under Works for Qld          Lions
                                      championship as a feeder to the             Investigating new location for             Host Sunshine Coast Youth Network
                                      National Championships (U6 –                  Orange Sky Laundry service in                at Digital Hub with workshop on
                                      Open)                                         Noosa Shire                                  Tech pathways for young people
                                                                                  Coordinating a senior's health and      
                                    Assisted with the Noosa Rugby                                                              Progress detailed design of the
                                                                                    wellbeing program in collaboration           Noosa District Sports Complex
                                      League and Touch Football lighting
                                                                                    with Noosa Community Support and             internal road and physical activity
                                      project (installation of lighting to 3        Noosaville Leisure Centre
                                      fields) funded through Council                                                             and wellbeing hub Seeking external
                                                                                  Working with Aged Care and                   funding        opportunities        for
                                      grants, Qld Rugby League, both                Retirement facilities regarding their        construction of project
                                      clubs and Qld Government                      disaster preparation and response to
                                    Worked with Infrastructure services           COVID 19
                                      to complete the preliminary designs         Plug IN Online Music Development
                                      for the Noosa District Sports                 program – partnership with Creative
                                      Complex internal road                         Arts Alliance

                                                                                                                                                     Page 11 of 100

Section 12

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                            THE NEXT QUARTER
                                                                                          Developing a calendar of free events
                                                                                            for senior's week that encourage
                                                                                            seniors to feel included and
                                                                                            celebrated post COVID 19
                                                                                          Developing a 2 week Come and Try
                                                                                            adults' calendar of events to
                                                                                            encourage adults to be healthy and
                                                                                            active
                                                                                          Promoting the Ageing Well Noosa
                                                                                            program to the region and launching
                                                                                            the     10-week     Aquatic     Centre
                                                                                            component of the program
Council Community       Grants   Program      Finalised Round 12 RADF grant             Hosting 2 x Q and A style Zoom              Prepare for RADF 2020-21 Funding
including RADF                                  payments and Round 13 RADF                  session on next round of Council              agreement and 2019-20 Annual
                                                grant payments                              Community Project grants – 30 July            Report (September)
                                              Reopened Round 13 Community               Supporting community organisations          Plan and deliver RADF Round 14
                                                Project Grants                              and service organisations with
                                              Submitted         2020-21    RADF           Council     and      external    grant
                                                application to Arts Qld                     applications, prioritising those that
                                              Developed and delivered a Disaster          aid     community      recovery   and
                                                Recovery and Resilience Grant               resilience
                                                Program      with    54   community
                                                organisations applying
                                              Worked with local businesses to
                                                support community organisations –
                                                over $100,000 worth of hyenine
                                                products donated by two local
                                                businesses
Volunteer Initiatives                         Developed and provided a series of        Continue to provide up to date              Continue to prepare and deliver the
                                                6 webinars for community groups to          information and support as well as            2020/21 Workshop and Event
                                                assist with COVID 19 response and           managing a response to community              calendar for volunteers including
                                                recovery                                    organisations     and      volunteers         workshops on Event Management,
                                              Held two sessions of volunteer first        regarding their needs during COVID-           Conflict     resolution,    Volunteer
                                                aid training with 26 volunteers now         19                                            Recruitment and Retention and
                                                holding First Aid qualifications                                                          workshops that build resilience for
                                                                                                                                          Not for Profits and volunteers



                                                                                                                                                             Page 12 of 100

Section 13

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                              THE NEXT QUARTER
                                            Provided ongoing and up to date              Working with and collaborating with
                                              information        for      community          local community organisations to
                                              organisations and volunteers on                ensure food supply for vulnerable
                                              Council’s COVID-19 Community                   persons is available
                                              Support page
                                            Provided support and assistance to
                                              community organisations in relation
                                              to COVID restrictions and return to
                                              play, including liaison with State and
                                              Regional bodies, local and state
                                              government staff, reviewing plans
                                              etc
Business as Usual Activities                Restumping and painting project at           Support reinstating ceramics studio
                                              Wallace House (Noosa Arts and                  at Wallace House
                                              Crafts)                                      Assist sports clubs to apply for Qld
                                            QMusic Industry Connect Workshop               Government          Active      Restart
                                              content delivered online                       Infrastructure Recovery Fund (15
                                            Assisted      sports     clubs     with        clubs looking to apply)
                                              information and applications for             Work with University of Sunshine
                                              Sport specific funding form the                Coast and local schools to deliver a
                                              Department of Housing and Public               variety of talks around resilience and
                                              Works (43 clubs received Active                overcoming adversity
                                              Clubs Restart)                               Working with the Noosa Boardriders
                                                                                             Club to identify potential locations for
                                                                                             a water sport clubhouse (multi-sport)


COMMUNITY FACILITIES
Noosa Leisure Centre (NLC) – Financial      Financial performance was impacted           Continue to closely monitor and               Continue to closely monitor and
Performance                                   by the closure of the Centre due to            minimise financial impacts from                 minimise financial impacts from
                                              COVID-19 from March 23 to 14                   COVID-19                                        COVID-19
                                              June. Revenue finished the year
                                              $111k behind budget expectations,
                                              while expenditure finished $91k
                                              under budget, leading to net
                                              performance $20k behind budget. It
                                              was a disappointing way to end the
                                              year having been $55k ahead of

                                                                                                                                                             Page 13 of 100

Section 14

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                           11 AUGUST 2020


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                             THE NEXT QUARTER
                                              budget at end of Q3 On a positive
                                              note, the final result was $30k ahead
                                              of the revised COVID budget
                                              projections.
Noosa Leisure Centre - General              Annual audit of external basketball         Complete mini upgrade to Kids’               Continue to minimise the impacts
                                              backboard structures completed                Playroom ready for re-opening of               and risks of COVID-19 for staff and
                                            Completed         building        and         entire facility in line with the easing        patrons
                                              maintenance       works      including        of Stage 3 restrictions                      Carpet installation for downstairs
                                              servicing     of  faulting    stadium       Continue to train and upskill staff to         meeting rooms scheduled for late
                                              ventilation fans and electrical safety        assist in multiple areas as required           July
                                              works                                       Continue to work with user groups to         New Rollerfit booking to commence
                                            Thoroughly cleaned and freshened              ensure compliance with relevant                from July, providing additional
                                              up the facility during the enforced           industry COVID Safe Plans, before              skating opportunities for adults and
                                              closure                                       re-commencing bookings at the                  new kids’ classes on offer
                                            Reviewed and updated operational              facility                                     Annual rock wall audit scheduled for
                                              procedures                                  Ongoing monitoring of COVID-19                 July
                                            Partial reopening of facility on 15           landscape and adjustment of                  Ongoing monitoring of COVID-19
                                              June for group fitness and stadium            operations if required                         landscape and adjustment of
                                              sports only                                                                                  operations if required
Noosa Aquatic Centre (NAC) – Financial      The NAC’s financial performance for         Continue to closely monitor and              Continue to closely monitor and
Performance                                   the quarter was heavily impacted by           minimise financial impacts from                minimise financial impacts from
                                              the COVID-19 closure. This added              COVID-19                                       COVID-19
                                              to the budget variances experienced
                                              because of longer than anticipated
                                              maintenance       closure  at    the
                                              beginning 19/20. In the end, NAC
                                              revenue was $432k behind budget
                                              for the year, with expenditure
                                              finishing $357k under budget.
                                              Collectively this meant net financial
                                              performance $75k behind budget. At
                                              the end of Q3 and prior to COVID
                                              closures, the centre was $84k ahead
                                              of YTD budget.




                                                                                                                                                             Page 14 of 100

Section 15

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                     RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
Noosa Aquatic Centre – General           Supported staff through COVID                Safely ramp up operations under            Continue to minimise the impacts
                                           closure     with     alternate  duties,        stage 3 relaxations of the COVID             and risks of COVID-19 to staff and
                                           redeployments           across      the        restrictions                                 patrons while maximising the
                                           organisation and provision of staffing       Implement revised Junior Squad               financial performance of the centre
                                           assistance to community groups in              Program following departure of             Review success of revised Junior
                                           need of assistance to continue                 Contractor during COVID closure              Squad Program and determine
                                           delivering vital services to the             Continue to market to and                    future direction
                                           community                                      communicate      with    users    to       Complete work on the Centre’s
                                         Reopened facility under Stage 2                encourage regular utilisation of the         masterplan and Learn to Swim
                                           restrictions on 15 June                        NAC’s services                               program strategy
                                         Marketing campaign launched to               Coordinate required works for light
                                           reengage with patrons to encourage             pole footings
                                           a return to activities at the NAC
                                         Installation of new 50m pool heat
                                           pump
The J & Bicentennial Centre (BCC) –      The      J’s    reported   financial         Continue to monitor and review             Continue to monitor and review
Financial Performance                      performance was heavily impacted               financial impacts of COVID-19 while          financial impacts of COVID-19 while
                                           by the COVID shutdown. Revenue                 maximising     revenue     generating        maximising     revenue     generating
                                           finished the year $171k behind                 opportunities (currently via meeting         opportunities (currently via meeting
                                           budget and expenditure came in                 spaces and small group use of the            spaces and small group use of the
                                           $115k below expectations. Overall              theatre) where available                     theatre) where available
                                           The J missed budget by $56k. It was
                                           a disappointing finish to the year
                                           having been $31k ahead of budget
                                           at the end of Q3.
                                         BCC finished the year approx $22k
                                           behind budget, almost entirely
                                           because of rent relief provided to
                                           Noosa Gymnastics Club during
                                           COVID




                                                                                                                                                          Page 15 of 100

Section 16

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                   11 AUGUST 2020


BRANCH ACTIVITIES                 RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             THE NEXT QUARTER
The J & BCC – General                Facility closed throughout quarter         Closely monitor COVID-19 operating           Monitor         ongoing     COVID-19
                                       due     to     mandated    COVID-19          restrictions and determine whether             restrictions and continue to safely
                                       shutdowns                                    operations beyond current small                maximise opportunities for the
                                     Commenced major maintenance                  group use of venue becomes more                facility to operate in some capacity
                                       works including floor sanding and            viable                                       Continue to liaise with promoters to
                                       resealing and improvement works to         Further review and liaise with                 reschedule, postpone or cancel
                                       rear deck, storage areas and loading         promoters to reschedule, postpone              future events affected by COVID
                                       dock                                         or cancel future events affected by            restrictions, if required
                                     Rescheduled,       postponed     and         COVID restrictions                           Take the opportunity to further
                                       cancelled events following COVID           Finalise building and maintenance              review and update admin and
                                       shutdown Liaised with hirers and             works                                          operational processes
                                       patrons throughout                         Review LED lighting options for              Liaise with Montessori Noosa
                                     Transitioned ticketing system from           upper and lower foyers, upper deck             regarding expansion of their lease at
                                       SABO to TicketSearch, a major                and ramp areas                                 BCC as previously discussed
                                       piece of work for the team                 Complete back-office processes to            Review The J’s performance against
                                     Staffing assistance provided to local        finalise transition of ticketing system        previous business plan and develop
                                       not-for-profits and agencies during        Determine        best      redeployment        a new one for the next 5 years
                                       COVID-19 to ensure critical services         options for staff affected by
                                       could continue to be delivered to            slowdown of duties at The J
                                       those most in need within our
                                       community
Noosa Community Support (NCS) –      NCS broadly performed in line with         Continue to closely monitor financial        Continue to closely monitor financial
Financial Performance                  budget expectations and was able to          and funding body KPI (output                   and funding body KPI (output
                                       maintain a level of service provision        achievement)           performance,            achievement)           performance,
                                       to clients throughout the recent             particularly in light of COVID-19              particularly in light of COVID-19
                                       COVID-19 restrictions. A small level         disruption                                     disruption
                                       of surplus funds will be carried
                                       forward into 2020/21 as some
                                       funding couldn’t be expended in
                                       2019/20 because of the suspension
                                       of group activities across NCS.




                                                                                                                                                      Page 16 of 100

Section 17

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                          THE NEXT QUARTER
Noosa Community Support – General           Social support groups suspended            Continue to review operations to          Continue to review operations to
                                              due to COVID, although some Zoom             ensure compliance with COVID-19             ensure compliance with COVID-19
                                              exercise classes continued Almost            restrictions and meeting of funding         restrictions and meeting of funding
                                              business as usual for home                   body obligations                            body obligations
                                              maintenance, transport and in-home         Telephone support and welfare             Continue to review systems and
                                              care with the addition of thorough           checks will continue for clients who        processes, particularly ways to get
                                              infection control measures to                choose to remain isolated                   more from our client management
                                              mitigate COVID risks for all               Slowly introduce outings and offsite        software or alternative systems
                                            Finalised updated model of service           activities for small social groups        Continue       to    monitor  funding
                                              delivery to evolve to meet the needs       Welcome volunteer drivers back on           landscape for changes to ensure
                                              of the first wave of baby boomers            board following their COVID Safe            NCS can respond swiftly and
                                              coming      through    the   service.        induction process                           effectively if required
                                              Conducted       a     workshop    on                                                   Prepare centre for full reopening in
                                              generational change to engage staff                                                      October (pending positive tracking
                                              on the need to evolve and modify                                                         on the COVID front) and introduce
                                              our services.                                                                            new activities for dementia clients
                                            Secured           extension        of                                                    who have carers that need respite
                                              Commonwealth        Home     Support                                                   Work closely with Community
                                              Programme (CHSP) funding for a                                                           Development to introduce more
                                              further two years. This program                                                          wellness and reablement programs
                                              provides more than 85% of the                                                            in the hinterland and Peregian
                                              team’s total funding.                                                                    Beach


LIBRARIES & GALLERIES
LIBRARIES                                   Concept plans for proposed vehicle         Begin scoping out the design for the      Gain updated costings for capital
Mobile Library   Service   Replacement        reviewed and finalised                       exterior wrap of proposed vehicle           elements of future replacement
Plan                                        Researched possible locations and          Council to consider and decide on           model
                                              shelters for potential library kiosks        future replacement model for library      Commence procurement of capital
                                                                                           outreach services                           elements of replacement model
                                                                                         Review and update draft project plan      Implement     project   plan  and
                                                                                           inclusive     of       comprehensive        communication plan
                                                                                           communication plan based on
                                                                                           confirmation of future model



                                                                                                                                                          Page 17 of 100

Section 18

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                               11 AUGUST 2020


BRANCH ACTIVITIES                             RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
Plan and deliver a range of engaging             Program Attendance: No face-to-             Liaise with Monica McInerney to            Implement and launch Seed Library
public library programs which support              face programs                                 secure signature literary event              Program
reading, learning and literacy (including        Online programming (March to June)          Develop Senior’s Week activities           Continue to deliver a broad range of
digital literacy)                                  - 142 programs, with over 500 hours         Develop project plan and begin               programming within current COVID
                                                   of viewing, including children’s story        partnership collaborations for grant-        restrictions
                                                   time, adult literacy, Book Café,              funded Seed Library program
                                                   special day/week celebrations               Deliver postponed grant-funded
                                                 Awarded $25,000 through a State               programs – Engaging Science, Tech
                                                                                                 Savvy Seniors and First Five
                                                   Library of Queensland grant funding
                                                                                                 Forever
                                                   opportunity to develop and deliver a
                                                   Seed Library Collection and suite of
                                                   educational workshops
Deliver capital   works   and    facilities      Completed installation of solar             Generator Connection Point to be           Rectification of identified defects on
projects                                           panels on Noosaville Library                  installed at Cooroy Library (to              Cooroy Library roof
                                                 Completed installation of solar               support      Evacuation        Centre      Commence         Gallery     amenities
                                                   panels on the Butter Factory Arts             operations)                                  upgrade project
                                                   Centre                                      Complete identified roof repairs on
                                                                                                 Butter Factory Arts Centre
                                                                                               Undertake               Conservation
                                                                                                 Management Plan on Butter Factory
                                                                                                 Arts Centre
                                                                                               Deliver staff training on library
                                                                                                 branches operating as Evacuation
                                                                                                 Centres
                                                                                               Review design plans for Gallery
                                                                                                 amenities upgrade and scope out
                                                                                                 project plan
                                                                                               Commence Butter Factory Pottery
                                                                                                 Studio external fencing project
GALLERIES                                        Re-opened        Mary   Macqueen            Reschedule exhibitions impacted by         Monitoring exhibition and public
Plan and deliver a schedule of engaging            Retrospective (closed to public in            COVID-19 (2021- 2022)                        programming         scheduling   and
exhibitions and programs which diversify           first quarter for 11 weeks due to           Curating engagement content for              delivery relative to changing COVID-
and grow audiences; and support local              COVID-19)                                     online delivery (video, exhibition           19 circumstances
arts practices                                   Re-opened Rosie Lloyd-Giblett,                catalogues,        image  galleries,       Liaising with programmed artists and
                                                   Between the Trees (closed to public           children’s activities)                       stakeholders e adjustments to


                                                                                                                                                                 Page 18 of 100

Section 19

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
                                              in first quarter for 11 weeks due to      Deliver Lyn McCrea Memorial                 delivery of exhibitions
                                              COVID-19)                                   Drawing Prize and DRAW Student            Adjusting usual operations for online
                                            Delivered public programs online            Art Award online                            delivery where appropriate
                                              associated with each exhibition and       Plan for 2022 exhibition programs         Delivery of exhibitions by Rowley
                                              project                                   Adapt After School Art program for          Drysdale, Ian Smith, Beatrice Prost,
                                                                                          live online delivery                        Elysha Rei, Daniel Agdag and
                                                                                                                                      Miriam Innes
                                                                                                                                    Planning for Floating Land 2021
Noosa Cultural Plan 2018      – 2023        Engaged Outside the Square                Continue to analyse options for           Continue to implement 2020/21
Implementation                                Creative Consultants to undertake           future models of how Council                Action Plan
                                              New Gallery Pre-Feasibility Study           delivers     cultural   development       Complete pre-feasibility study for
                                            Planning for new Gallery website as         activities                                  new/upgraded Regional Gallery
                                                                                        Continue work towards Wood-fired
                                              engagement tool for exhibitions,                                                      Commence            an      economic
                                              education and public programs               Ceramics from Cooroy travelling
                                                                                                                                      assessment of the impact of Covid-
                                                                                          exhibition in line with Growing the
                                                                                          Cultural Economy                            19 on local cultural sector
                                                                                        Support the local cultural sector in      Review and re-develop Council
                                                                                          accessing Covid recovery funding            cultural websites enabling additional
                                                                                                                                      digital content and archiving projects
                                                                                                                                    Commence desktop research to
                                                                                                                                      inform and develop draft Public Arts
                                                                                                                                      Policy
HERITAGE - Plan and deliver key           Stage 2 of Local Heritage Register        Complete 2019/20 Heritage Levy            Continue to monitor COVID-19
Heritage Levy Initiatives & a range of      Review and Citation update project          Budget Initiative projects that were        conditions in context of impacts on
Heritage projects and programs              completed                                   delayed due to COVID-19 including:          proposed 2020/21 projects
                                          Historian-in-Residence and Noosa            o     Local Heritage Register Review      Progress work on 2020/21 Heritage
                                            Notables projects able to continue          and Citation updates                        Levy Budget Initiative projects
                                            and make substantial progress, with
                                                                                        o     Historian-in-Residence project      Continue to develop and deliver
                                            modifications for COVID restrictions
                                                                                        o     Noosa      News    and   Noosa        heritage     programming        within
                                                                                        Advocate digitisation                       parameters of ongoing COVID
                                                                                        o     Noosa Notables                        restrictions
                                                                                      Review and update project plans for
                                                                                        2020/21 Heritage Levy Budget
                                                                                        Initiative projects




                                                                                                                                                         Page 19 of 100

Section 20

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                11 AUGUST 2020


BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER
Business as Usual activities      Total April – June 2020 (note Library      Undertake Library Management                Continue to adapt business as usual
                                    branches and Gallery closed during           database clean-up projects following          activities to suit Covid-19 conditions
                                    Covid-19 from 25 March)                      collection stocktake
                                  LIBRARY -         Click And Collect        Creation      of    Covid-19     risk-
                                    operating from 18 May; Library open          assessments for each new service
                                    on reduced hours from 15 June:               re-introduced. Focus on potential
                                    o Visitors: Library: 9,664;                  re-introduction    of    face-to-face
                                    o Library Loans: 22,309 – majority           Library and Gallery programs in
                                         via Click And Collect temporary         September and the return of
                                         pick-up service; 347 new                volunteers.
                                         members; 8390 reserved library        Recruitment for Young People’s
                                         items issued                            Librarian due to incumbent retiring
                                    o E-Resources - 591 new users                after 23 years
                                         of e-books/e-audiobooks; 6045
                                         e-magazines on loan; 8690 e-
                                         audio books loaned; 10,972 e-
                                         books loaned
                                  Completed stocktake of library
                                    collection
                                  In partnership with People & Culture,
                                    developed a corporate training
                                    program for internal staff to
                                    undertake during Covid-19
                                  GALLERY - reopened 9 June 2020
                                     Visitors: 841
                                     Online public programs: 44


LOCAL LAWS
Manage Local Laws Compliance      837 customer requests                      Adjusting enforcement approach,             Post     Covid-19:    Re-commence
                                  23 reported dog attacks (15 on               particularly in parking due to Covid-         school lectures and introduce
                                    animals - 8 on people)                       19 impacts                                    community group lectures on
                                  51 proactive patrols undertaken            Continuing to conduct early patrols           responsible pet ownership and
                                                                                 to address illegal camping, animal            safety around animals
                                                                                 related offences and unlawful


                                                                                                                                                  Page 20 of 100

Section 21

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                               11 AUGUST 2020


BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
                                  2961 Local Laws Infringements                 prescribed activities in-line with        Monitor budget implications from
                                    issued: (approx 1,000 less than               Covid-19 reduced enforcement                Covid-19
                                    previous ¼ due to Covid-19                  Exploring new options in Operational      Monitor and review compliance
                                    relaxation on enforcement)                    processes to maintain service               areas
                                    o 224 Animal infringements                    delivery and customer satisfaction        Evaluate required animal pound
                                    o 219 Restricted activity – camping                                                       improvements
                                    o 2518           Parking       related
                                       infringements
                                  197 Appeals assessed
                                  Increase in online dog registrations
                                  Seamless transition to working
                                    remotely
                                  Increased efficiency achieved with
                                    in-field use of technology


WASTE &        ENVIRONMENTAL
HEALTH
Waste Management Contract         A workshop with Executive Officers,         Request quotes from waste industry        Work with the Infrastructure Services
                                    Waste Officers and industry experts           experts     to   commence       the         Department to project manage
                                    was conducted This is the first step          development of the Waste Strategy           construction      of      a     second
                                    on the production of a 20-year              Waste officers continuing to work           weighbridge, new gatehouse and
                                    Waste Strategy                                closely with Cleanaway to ensure            new landfill cell
                                  Successfully applied for a $50,149            business continuity during the            Review the draft 2020/21 waste
                                    grant for illegal dumping from State          COVID-19 pandemic                           budget and financial impacts of
                                    Government                                                                                COVID – 19
                                  Provided a submission to State                                                          Research potential service delivery
                                    Government on proposed changes                                                            methods to provide a bulk kerbside
                                    to waste legislation intending to                                                         collection service in the future
                                    remove protection of existing waste
                                    collection contracts
                                  Introduction of Garden Waste
                                    Service to commercial premises and
                                    using bulk bins




                                                                                                                                                 Page 21 of 100

Section 22

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        11 AUGUST 2020


BRANCH ACTIVITIES                     RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
Waste Levy                               Waste Levy fees being paid to State         Payment of waste levy revenue on            Work with the Rates Section on the
                                           Government in accordance with                 time in accordance with legislation to        introduction of the $5 increase to the
                                           monthly invoices received                     avoid interest penalty payments               Waste Levy from January 2021
Container Refund Scheme (CRS)            Container refund payments continue          Maintain communications with VISY           Review the budget impacts of the
                                           to be received from VISY under the            Recycling regarding the viability of          CRS revenue sharing agreement as
                                           Container Refund Scheme which                 processing recyclable material in the         the volume of recyclable material
                                           has a significant impact on offsetting        current COVID – 19 crisis and                 collected in the kerbside collection
                                           the gate fee for processing recycled          prepare for any significant impacts           service. There is a trend in reduction
                                           material through the VISY recycling           on Councils kerbside recycling                in volume of recyclable sent to VISY
                                           facility at Bli Bli                           collection service                            which reduces the revenue paid to
                                                                                                                                       Council.
Memorandum of Understanding (MOU)        Waste officers continued to meet            Council Waste Managers will meet
with Unity Water regarding Advanced        with other stakeholders to progress           to discuss potential opportunities for
Waste Treatment                            the study                                     the three Councils to work
                                                                                         collaboratively
Waste Education                          Completed construction and fit-out of       Commence         school    education        Open the facility to the community
                                           the Waste Education building at               sessions at the facility                      post COVID-19 restrictions
                                           Reviva
Health Inspection Program                Licensed      premises      inspection      Conduct annual inspection program           Planning for the reinspection of
                                           program was impacted by COVID –               of licensed premises where possible           industrial premises likely to pollute
                                           19 The program was on track in                and monitor the ongoing impact of             waterways that were inspected in
                                           January and February except for               COVID-19                                      the 2018/19 financial period
                                           implementing the licensing of public        Liaise with Queensland Health,              Planning      for     the    smooth
                                           swimming pools                                Public Health Unit on Covid safe              implementation of licencing and
                                         EHO’s have worked hard to catch-up            compliance for the Noosa region
                                                                                                                                       inspection program for public
                                           on inspections impacted by COVID-           Planning to build capacity for an             swimming pool local law
                                           19 period and have 95% complete               effective    multi-agency     health
                                           the inspection program                        response in preparedness for a              Continued integration of covid safe
                                         Fees and charges for public                   second wave of COVID-19 on the                compliance workload into current
                                           swimming pool approvals complete              Sunshine Coast                                work structures
                                         Complete transition from paper-                                                           Provide technical and specialist
                                           based     inspection    program     to                                                      advice to the community and internal
                                           electronic inspections via iPads                                                            business units on covid safe
                                                                                                                                       practices from a Public Health
                                                                                                                                       perspective



                                                                                                                                                          Page 22 of 100

Section 23

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                              11 AUGUST 2020


BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                            THE NEXT QUARTER
Vector Control (Mosquitoes)       Commenced aerial control of               Continue regular aerial mosquito            Monitor salt marsh breeding areas
                                    mosquito borne diseases in salt             control in salt marsh areas at each           following rainfall and spring tidal
                                    marsh areas during the heavy wet            peak tide or coinciding with heavy            activity
                                    weather after Christmas                     rainfall events                             Conduct regular aerial treatment
                                  Dry conditions have reduced the           Limited fogging to be implemented             program for the salt marsh breeding
                                    need for regular aerial treatment of        where weather conditions prevent              areas and fogging of adult
                                    salt marsh areas that normally start        aerial control by helicopter resulting        mosquitoes with potential to transmit
                                    in September                                in massive breeding of mosquitoes             mosquito borne illness
                                                                                and complaints from residents               Work with our communication staff
                                                                              Ensure the program focuses on                 to improve information to public on
                                                                                disease transmitting mosquitoes and           the treatment program. Recent
                                                                                not nuisance pest species that do             advertising of proposed treatment
                                                                                not transmit disease                          resulted in a negative public
                                                                                                                              response to our program, despite
                                                                                                                              similar advertising being conducted
                                                                                                                              prior to each treatment for many
                                                                                                                              years.
Business as Usual activities      Supported businesses, community           Forced deferral of the Council              Refine the online burial database
                                    organisations and the Council in            approved       behavioural change             that allows the public to search for
                                    responding    to  the   Covid-19            program for better segregation of             burial records online
                                    pandemic                                    waste and recyclable material,
                                                                                impacted by COVID –19 and is
                                                                                unlikely to progress this financial
                                                                                year




                                                                                                                                                 Page 23 of 100

Section 24

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    11 AUGUST 2020


Previous Council Consideration

Nil.

Finance

Given the significant disruption of the coronavirus COVID-19 pandemic, the Department finished
the 2019/20 year in a reasonable position with a deficit of $1.4Million, noting that there was a
$3.1M increase in the cost of the landfill provision.

Risks & Opportunities
The major risks facing the department include:
 maintaining adequate health, hygiene and mitigation measures in response to the
   coronavirus COVID-19 pandemic;
 maintaining a sound financial position in the face of COVID-19 disruptions;
 managing waste and associated emissions;
 responding to funding changes in Noosa Community Support; and
 managing transition of key staff close to retirement.

The main opportunities the department is investigating include:
 investigating new models of service and operation as a result of COVID-19;
 reviewing Council’s role in affordable housing;
 exploring new service models for the Library’s outreach services; and
 diversifying revenue streams.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Community Services’ Managers and Coordinators contributed to the preparation of the quarterly
departmental update report.


Departments/Sections Consulted:

       Chief Executive Officer   X   Community Services                      Corporate Services
       Executive Officer         X   Director                                Director
       Executive Support         X   Community Development                   Financial Services
                                 X   Community Facilities                    ICT
                                 X   Libraries & Galleries                   Procurement & Fleet
                                 X   Local Laws                              Property
                                 X   Waste & Environmental Health            Revenue Services

       Executive Services            Environment & Sustainable Development   Infrastructure Services
       Director                      Director                                Director
       Community Engagement          Building & Plumbing Services            Asset Management
       Customer Service              Development Assessment                  Buildings and Facilities
       Governance                    Economic Development                    Civil Operations
       People and Culture            Environmental Services                  Disaster Management
                                     Strategic Land Use Planning             Infrastructure Planning,
                                                                             Design and Delivery




                                                                                        Page 24 of 100

Section 25

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       11 AUGUST 2020


4                        CORPORATE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20
DOCUMENT INFORM AT ION




Author                           Director Corporate Services, Michael Shave
                                 Corporate Services Department

Index                            ECM/ Subject/ Branch Management/ Corporate Services

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the Services & Organisation
Committee Meeting dated 11 August 2020 providing an update on operations of the Corporate
Services Department for the period 1 April – 30 June 2020.


REPORT
The adopted organisation structure includes the following branches under the Corporate Services
Department:
   Director’s Office
   Financial Services;
   ICT (including Records and GIS);
   Procurement & Fleet;
   Property; and
   Revenue Services.

Corporate Services primarily provides internal support to the other Council Departments, with the
exception of the Director’s Office involvement in strategic Council issues and projects, and the
Property branch that deals primarily with land and property management issues.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the department.




                                                                                         Page 25 of 100

Section 26

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         11 AUGUST 2020


CORPORATE SERVICES DEPARTMENT

BRANCH ACTIVITIES                      RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                           THE NEXT QUARTER
Financial Services
Budget                                    2020/21 budget adopted at Special             Finalisation of   BR1    budget            Continue to monitor COVID-19
                                            Meeting 10 July 2020.                           carryovers.                                  impacts to Council’s budget.
                                                                                          Ongoing monthly budget reporting           Development of the 2021/22 budget
                                                                                            and support.                                 plan and proposed community
                                                                                                                                         engagement process.
Assets                                    Capitalisation of constructed and             Continued asset capitalisation to          Streamline asset data capture
                                            developer contributed assets to                 address backlog in Work in Progress          procedures.
                                            complete the year-end process.                  (WIP).                                     Commence scope and tenders for
                                          Comprehensive valuation of buildings                                                         2020/21 comprehensive valuation of
                                            and stormwater assets completed.                                                             parks and other infrastructure
                                          Desktop      indexation   revaluation                                                        assets.
                                            completed for road assets.                                                                 Commence the second stages of the
                                                                                                                                         three year asset data improvement
                                                                                                                                         project.
Statutory Reporting, Risk Management      Queensland Audit Office (QAO)                 Completion of the 2019/20 year end         QAO final external financial audit in
and Audit Compliance                        interim audit completed for the                 statutory reports and final external         September 2020.
                                            2019/20 year in May.                            financial audit.                           Review issues identified during
                                                                                          Finalise the review of changes to            external and internal audits to
                                                                                            accounting standards.                        improve Council’s internal controls.
Treasury, Investments and Banking         Review of long term cash flow                 Review of bank guarantee policy            Review of purchase card policy to
                                            implication to Council from the                 and processes to ensure best                 ensure optimal use of purchasing
                                            COVID-19 pandemic.                              practice approach.                           cards and effective management of
                                          Determine        loan      borrowing          Investigating Technology One CIA             fraud risk.
                                            requirements for the 2020/21 budget.            bank reconciliation module.
                                          Investment portfolio managed to
                                            ensure optimal return for Council in
                                            alignment with Investment Policy
                                            requirements.
Business As Usual Activities              Monthly      financial   performance          Annual 2020/21 performance plan            Implementation of Technology One
                                            reporting.                                      development for all staff.                   automated scanning and transacting
                                          Reduced payment terms for local               Recruitment of two vacant positions          of creditor invoices.
                                            suppliers to 7-days to assist with their        within the financial services branch.      Branch service review underway to
                                            cashflow        during      COVID-19          Improved fraud prevention controls           identify        opportunities   for


                                                                                                                                                            Page 26 of 100

Section 27

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
                                               pandemic.                                     under development to further                 improvements and efficiencies in
                                             Implementation of Technology One              mitigate any possible risk with              financial services operations.
                                               online system solution for processing         supplier bank details.                     Prepare branch COVID-19 recovery
                                               of   non-creditor payments and                                                             plan and activate as appropriate.
                                               reimbursements.
ICT
Technology One (T1) CI Anywhere (CIA)        CIA     online    requests   system         Early adopter involvement in new           Procure to pay stage 2 including e-
web   browser    based    functionality        implemented in June 2020.                     TechnologyOne digital experience             invoicing, processing with scanning
implementation                               Upgraded to the latest version of             meetings application (DXP).                  and automatic document matching,
                                               TechnologyOne           with    new         Further refinements of online request        and supplier portal introduction.
                                               capabilities.                                 system      functionality   including      Investigate implementation of next
                                             Extra cemeteries and plumbing                 introduction of Noosa Council app.           version of T1 software release.
                                               applications put online.                    Implementation of CIA e-recruitment        CIA         capital         budgeting
                                                                                             module.                                      implementation for 2021/22 budget
                                                                                           Implementation of CIA work orders            process.
                                                                                             and financial assets.                      Further     enterprise      budgeting
                                                                                           Investigation into CIA contracts             enhancements including fees and
                                                                                             module stage 2.                              charges functionality.
GIS Mapping                                  Risk assessment mapping for                 Upgrading to the new way of                Continuous improvement of mapping
                                               coastal hazards.                              exchanging           data        with        data.
                                             Noosa Plan biodiversity updates.              TechnologyOne        that    provides      GIS mapping projects.
                                             Mapping short term accommodation              opportunities for automation.
                                               data.                                       Mapping of capital works program.
                                             Processing as-constructed plans for
                                               Council capital works to allow asset
                                               management.
                                             Updated Nearmaps aerial photos
                                               from June available on Council
                                               mapping.
ICT Security                                 No security breaches during the             Eliminating vulnerabilities found by       Continuous improvement of ICT
                                               period.                                       external review.                             security to meet emerging threats.
                                             Vulnerability assessment conducted          Upgrading email security system to         Implementation of new security
                                               by external security firm.                    provide    improved      spam    and         controls to address risks in the ICT
                                             Monthly online cyber-security training        malicious email detection.                   Branch Risk Register.
                                               and email phishing test delivered.

                                                                                                                                                             Page 27 of 100

Section 28

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        11 AUGUST 2020


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                          THE NEXT QUARTER
                                           Improved ICT Business Continuity              Ensuring the security of systems
                                             Plan.                                           while staff work from home.

ICT Strategy and roadmap                   Formalised early adopter relationship         Adapting the roadmap to align to          Update the ICT Strategy.
                                             with    TechnologyOne       including           TechnologyOne release dates and
                                             software licensing provided by                  capabilities.
                                             TechnologyOne.                                Continuing positive partnership with
                                                                                             TechnologyOne       to     progress
                                                                                             projects.
Business as Usual activities               Started migration of ICT staff (pilot         Annual 2020/21 performance plan           Reduction in the number of printers
                                             project) to Microsoft Teams for                 development for all staff.                  and replacing oldest devices.
                                             electronic communications.                    Supporting staff working at home          Prepare branch COVID-19 recovery
                                                                                             during COVID-19.                            plan and activate as appropriate.
Procurement
Contract      Management/Procurement       Development of key procurement/               Planning underway for 2020/21             Commence delivery of 2020/21
Support                                      probity information for new Council.            capital    program     procurement          program of work with a focus on
                                           Development       of    local  spend            support.                                    support for grant funded projects
                                             analytical data.                              Planning and delivery for issuing           due to timing pressures.
                                                                                             tenders that were delayed (with           Brief new Council in regards to
                                                                                             contract extensions) due to COVID-          Procurement/Probity     policy and
                                                                                             19.                                         procedures.
Undertake early adoption project with      Contracts Module     now    ‘live’   for      Continue to enter >$200K contracts        Review and refine Contracts Module
Technology One (T1) to implement the         >$200K Contracts.                               into the new module and monitor.            implementation    and   commence
new CI Anywhere Contracts Module.                                                          Schedule scoping for Stage 2                scoping for Stage 2.

Business as Usual activities               Departmental Purchasing Officers              Provide       ongoing    procurement      Ongoing development of systems
                                             network monthly meetings continue.              support across Council during               including VendorPanel and T1
                                           Ongoing     assistance    with     the          COVID-19                                    (Contracts Module and e-Probity)
                                             assessment     of    the   hinterland         Continue to investigate/develop           Recruitment process for new
                                             playground restricted tender.                   ‘Professional      Services’   Panel        Procurement and Contracts Advisor.
                                                                                             initiative (ongoing).                     Prepare branch COVID-19 recovery
                                                                                           Prepare for 2020/21 capital program         plan and activate as appropriate.
                                                                                             and associated tenders/procurement
                                                                                             processes.
                                                                                           Annual 2020/21 performance plan
                                                                                             development for all staff.

                                                                                                                                                           Page 28 of 100

Section 29

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                    11 AUGUST 2020


BRANCH ACTIVITIES                    RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Fleet
Fleet Replacement and Maintenance       2019/20 fleet capital       program        Plan for 2020/21 (revised) fleet           Ongoing maintenance for fleet and
Program                                   completed with one         carryover         replacement program delivery.                small plant.
                                          vehicle.                                   Continue to coordinate team through        Monitor orders and body builds for
                                                                                       a rotating roster between working            deliveries within the financial year.
                                                                                       from home and in the office.
Business as Usual activities            Co-ordinated vehicle reallocations to      Provide ongoing support across             Map key work processes with the
                                          continue service delivery and ensure         Council during COVID-19.                     team    to     identify roles     and
                                          COVID-19 safety compliance.                Continue to investigate/develop              responsibilities.
                                        Monthly Fleet Advisory group                 ‘Professional      Services’    Panel      Prepare branch COVID-19 recovery
                                          meetings continue to discuss and             initiative (ongoing).                        plan and activate as appropriate.
                                          manage all fleet matters.                  Finalise and issue fleet telematics
                                                                                       (i.e. GPS) invitation to quote.
                                                                                     Annual 2020/21 performance plan
                                                                                       development for all staff.
Property
Holiday Parks                         All holiday parks reopened due to            Continue to work with park                 North   Shore   Campground    –
                                          COVID-19 pandemic shutdowns.                 managers to manage COVID-19                  development of tender documents
                                          Point and Noosa North Shore                  pandemic impacts.                            for new management services
                                          Campgrounds – both sites closed 26         Monitoring QLD Government health             agreement.
                                          March 2020 due to COVID-19                   advice    to   ensure    operating
                                          pandemic.                                    procedures remain compliant.
                                        Successfully             managed
                                          implementation   of     COVID-19
                                          management strategies to allow
                                          holiday parks to reopen to 80%
                                          occupancy.
                                        Completed minor site works at the
                                          North Shore Campground.
Development    and finalisation of      Executed tenure agreements:                Continue with annual community             Progress capital works projects and
community tenure documents with           o Noosa Outriggers (Chaplain                 tenure renewals due.                         operational     maintenance       on
community groups                             Park)                                                                                  community properties for 2020/21.
                                          o Camphor Laurel Woodworkers
                                             Storage     (Johnson     Avenue
                                             Cooroy)


                                                                                                                                                       Page 29 of 100

Section 30

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                          THE NEXT QUARTER
                                               o   Noosa Triathlon Club      (Lions
                                                   Park Noosa Heads)
Development     and   finalisation   of      Finalised rent abatement package for       Continuing to align Certificates of       Develop Council’s approach and
commercial tenure documents                    commercial lessees.                          Currency for Public Liability to            framework for rent waiver provisions
                                                                                            financial year.                             to assess rent relief requests in
                                                                                          Continue to work with lessees to            accordance     with   the   Federal
                                                                                            quantify     COVID-19    pandemic           Government’s Code of Conduct and
                                                                                            impacts.                                    QLD Government regulations.
                                                                                                                                      Finalise development of business
                                                                                                                                        plan     for     Sunrise     Beach
                                                                                                                                        Neighbourhood Shopping Centre.
Permits                                      Successful refunding of cancellations      Issuing Footpath Trading renewals.        Developing a framework to consider
                                               for permit activities.                     Developing COVID-19 safe event              footpath   trading   permit    fee
                                                                                            planning protocols in accordance            abatement.
                                                                                            with Qld Government industry
                                                                                            framework.
                                                                                          Assessment of temporary event
                                                                                            permit applications within COVID-19
                                                                                            environment.
                                                                                          Cancellation    and    refunds   for
                                                                                            wedding permits.
Business as Usual activities                 Work Health and Safety Hazard              Updating application forms in             Implementation of service review
                                               Inspections completed for Lifeguard          readiness for new financial year.           recommendations.
                                               towers and holiday parks.                  Developing application guidelines to      Ongoing assessment of applications
                                             Various high use permit and                  assist event organisers to lodge            and permits for use of Council
                                               temporary      event     applications        event applications.                         owned or managed land.
                                               decided.                                   Annual 2020/21 performance plan           Prepare branch COVID-19 recovery
                                             Finalised 2020/21 operational budget         development for all staff.                  plan and activate as appropriate.
                                               development and fees and charges.
                                             Issued Commercial Low Use and
                                               Street      Performance        Permit
                                               Renewals.




                                                                                                                                                          Page 30 of 100

Section 31

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                               11 AUGUST 2020


BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                          THE NEXT QUARTER
Revenue Services
Property and Rating System        Finalised budget and revenue policy/         Issue of July 2020 rate levy.             Monitor the impact of COVID-19 on
                                    statement for 2020/21 financial year.        Refine new customer request                 rate   payments      and  potential
                                  Liaised with the Noosability project           system for rates requests and               increase in arrears.
                                    team to implement the new customer             streamline process for synchronising      Recommence recovery action for
                                    request module, with specific focus            data between the two name and               those properties with large pre-
                                    on the name and address register.              address registers.                          COVID rate arrears.
                                  Processed requests for adjustment
                                    to waste services for approximately
                                    2,500 commercial properties and
                                    units in resort complexes resulting
                                    from COVID-19 restrictions and
                                    refunded credits when requested.
Business as Usual activities      End of financial year returns for State      Processing of agency payments and         Process September Fire Returns in
                                    Emergency Management Levy, Rural               direct debit payments.                      compliance with state regulations.
                                    Fire Levy and State pensioner                Completion of rate searches in            Issue    reminder     notices    after
                                    concession scheme completed.                   required periods.                           conclusion of July 2020 levy period.
                                  Undertook      pre-levy     pensioner        Processing of property transfers.         Prepare branch COVID-19 recovery
                                    verification.                                Respond to customer queries re July         plan and activate as appropriate.
                                  Test rate runs completed in                    2020 rate levy in a timely and
                                    preparation for issue of July 2020             efficient manner.
                                    levy.                                        Annual 2020/21 performance plan
                                                                                   development for all staff.




                                                                                                                                                  Page 31 of 100

Section 32

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 AUGUST 2020


Previous Council Consideration
Nil.

Finance
Current business as usual activities and projects of the department are funded within the current
adopted budget.

Risks & Opportunities
Periodic reporting of departmental performance allows Council to fulfil their governance
responsibilities and ensures transparency within the organisation and to the community.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Nil.

Departments/Sections Consulted:

       Chief Executive Officer    Community Services                      X   Corporate Services
       Executive Officer          Director                                X   Director
       Executive Support          Community Development                   X   Financial Services
                                  Community Facilities                    X   ICT
                                  Libraries & Galleries                   X   Procurement & Fleet
                                  Local Laws                              X   Property
                                  Waste & Environmental Health            X   Revenue Services

       Executive Services         Environment & Sustainable Development       Infrastructure Services
       Director                   Director                                    Director
       Community Engagement       Building & Plumbing Services                Asset Management
       Customer Service           Development Assessment                      Buildings and Facilities
       Governance                 Economic Development                        Civil Operations
       People and Culture         Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 32 of 100

Section 33

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       11 AUGUST 2020


5                        NOOSA HOLIDAY PARKS UPDATE REPORT TO 30 JUNE 2020
DOCUMENT INFORM AT ION




Author                           Property Advisor Commercial Property, Robyn Mercer
                                 Corporate Services Department

Index                            ECM/ 8.16 Camping and Caravan Facilities (General)

Attachments                      Nil

EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Property Advisor Commercial Property to the Services &
Organisation Committee Meeting dated 11 August 2020 providing an update on operations of the
Noosa Holiday Parks Business Activity to 30 June 2020.

REPORT
FINANCIAL PERFORMANCE

                                                  2019/20     2019/20
                                                                         % Current        YTD
         TOTAL BUSINESS ACTIVITY                  Current        YTD
                                                                           Budget     Variance
                                                  Budget      Actuals
         Total Revenue                          3,089,128    2,150,628     69.62%     (938,500)
         Total Expenditure                      2,266,092    1,852,458     81.75%       413,634
         Operating Surplus/(Deficit)              823,036      298,170                (524,866)

Key Comments Total Business Activity
The 2019/20 financial performance for the total business activity did not achieve budget forecast,
as a result of the COVID-19 pandemic impact on park revenues. On 26 March 2020, in response
to Queensland Health Directives all holiday parks were closed with the Noosa River Holiday Park
remaining open for essential travellers only. All holiday parks reopened in mid-June with a staged
reopening approach incorporating lower occupancy limits in accordance with advice from
Council’s COVID taskforce. A staged reopening approach was implemented to allow evaluation
and assessment of COVID-19 control measures before consideration of increased occupancy
limits.

Further commentary on each site is included below.

Boreen Point Campground
                                                  2019/20     2019/20
                                                                         % Current        YTD
         Boreen Point Campground                  Current         YTD
                                                                           Budget     Variance
                                                  Budget      Actuals
         Total Revenue                            496,571     359,163      72.33%     (137,408)
         Total Expenditure                        396,282     390,394      98.51%         5,889
         Operating Surplus/(Deficit)              100,289     (31,231)                (131,520)

 The site was closed to all patrons from 26 March 2020 – 11 June 2020.
 The site reopened on 12 June with a 40% occupancy limit and at 30 June was operating with
   an 80% occupancy limit.

                                                                                          Page 33 of 100

Section 34

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                           11 AUGUST 2020


Noosa River Holiday Park
                                   2019/20      2019/20
                                                           % Current          YTD
 Noosa River Holiday Park          Current         YTD
                                                             Budget       Variance
                                   Budget       Actuals
 Total Revenue                    2,206,229    1,694,740      76.82%      (511,489)
 Total Expenditure                1,500,605    1,226,027      81.70%        274,579
 Operating Surplus/(Deficit)        705,624      468,713                  (236,911)

 The site was closed to all patrons from 26 March 2020 – 11 June 2020 with the exception of
   essential travellers.
 Budgeted variable costs such as management commission and water and wastewater
   charges reduced as a result of the closure.
 The site reopened on 12 June with 35% occupancy limit and at 30 June was operating with
   an 80% occupancy limit.

Noosa North Shore Campground
                                   2019/20      2019/20
                                                           % Current          YTD
 North Shore Campground            Current         YTD
                                                             Budget       Variance
                                   Budget       Actuals
 Total Revenue                     386,328        96,725      25.04%      (289,603)
 Total Expenditure                 369,205      236,037       63.93%       133,167
 Operating Surplus/(Deficit)        17,123     (139,312)                  (156,435)

 The site was closed to all patrons from 26 March 2020 – 18 June 2020.
 Budgeted variable costs such as management commission and water charges reduced as a
   result of the closure.
 The site reopened on 19 June 2020 with a 40% occupancy limit and at 30 June 2020 was
   operating with an 80% occupancy limit.

COVID-19 REOPENING AND OPERATIONAL PLANS
Extensive consultation was undertaken with park managers and the COVID-19 Taskforce to
develop reopening and operational plans for all holiday parks during the COVID-19 pandemic.
Risk registers have been prepared for each site with a suite of control measures implemented
including the staged reopening approach to ensure the risk of COVID-19 transmission is
minimised.

Current occupancy limits are being maintained with a watching brief in place given recent
increases in reinfection rates in Victoria and NSW.

PARK OCCUPANCY PERFORMANCE
Figure 1. Occupancy (%)
                                                       Figure 1 highlights the impact of
                                                       closure or restricted operations on the
                                                       aggregate financial year occupancy
                                                       level achieved for each site. The
                                                       higher levels of occupancy at Noosa
                                                       River Holiday Park reflect the location
                                                       of the park and its popularity with
                                                       customers, whilst the lower occupancy
                                                       level at Boreen Point Campground
                                                       reflect the geographical location and
                                                       different experiential offering for
                                                       guests.

                                                                              Page 34 of 100

Section 35

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              11 AUGUST 2020


The significantly low occupancy level of 5% achieved at Noosa North Shore Campground was
due to site closure from July 2019 to January 2020 for redevelopment works and from March
2020 to June 2020 due to COVID-19.

Figure 2. Average Stay (days)




Figure 3. Occupants




MAINTENANCE

Maintenance for each facility is performed in line with established budget allocations, including
any reactive maintenance. Completed works at the holiday parks include:

Noosa River Holiday Park:
 Completed electrical audit and associated rectification works.
 Re-mulching of the foreshore camping area.

Noosa North Shore Campground
 Site upgrade, levelling and associated works to provide a further 13 -15 sites in the south-
   eastern section of the campground.

Boreen Point Campground
 Internal repainting of the large amenity block.
 Refurbishment and modernisation of the reception area.




                                                                                 Page 35 of 100

Section 36

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                               11 AUGUST 2020


Previous Council Consideration
Ordinary Meeting Minutes, 20 February 2020, Item 6, Page 8
That Council note the report by the Property Advisor – Commercial Property to the Services &
Organisation Committee Meeting dated 11 February 2020 providing an update on operations of
the Noosa Holiday Parks for the period 1 July 2019 to 31 December 2019.
Ordinary Meeting Minutes, 15 August 2019, Item 11, Page 8
That Council note the report by the Property Manager to the Services & Organisation Committee
Meeting dated 6 August 2019 providing an update on operations of the Noosa Holiday Parks
Business Activity to 30 June 2019.

Finance
Periodic reporting of holiday park business activity performance allows Council to fulfil its
governance responsibilities and ensures transparency within the organisation and the
community.

Risks & Opportunities
Risks

 It is possible that COVID-19 infection rates will increase in Queensland and interstate forcing
   Council to reduce occupancy limits or again close holiday parks entirely. Decisions to reduce
   occupancy limits or close holiday parks will be guided by the COVID-19 Taskforce and the
   State Government.
 Assumptions were included in the 2020/21 holiday park budget relating to further COVID-19
   impacts. Should closures / reduced occupancy result in greater than forecasted budget
   impacts, the negative financial implications will need to be considered on the overall Council
   budget.

Opportunities

 If COVID-19 restrictions continue to ease Council will consider increasing current occupancy
   limits in consultation with park managers and the COVID-19 Taskforce.
 Should increased occupancy levels hold throughout the 2020/21 financial year upside
   financial performance will provide additional profit to Council to reduce the current budgeted
   Council operating deficit.
 An invitation to quote has been issued for a new brand development initiative, as the first
   phase of a broader marketing project which will seek to capitalise on emerging opportunities
   within and beyond the current COVID-19 environment.
 Migration of the Noosa Holiday Parks website to the LGAQ platform will provide a new
   customised design and mobile friendly layout for digital devices.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Director Corporate Services
Property Manager
Management Accountant




                                                                                  Page 36 of 100

Section 37

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 AUGUST 2020


Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      X   Corporate Services
   Executive Officer              Director                                X   Director
   Executive Support              Community Development                   X   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                              X   Property
                                  Waste & Environmental Health                Revenue Services

   Executive Services             Environment & Sustainable Development       Infrastructure Services
   Director                       Director                                    Director
   Community Engagement           Building & Plumbing Services                Asset Management
   Customer Service               Development Assessment                      Buildings and Facilities
   Governance                     Economic Development                        Civil Operations
   People and Culture             Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 37 of 100

Section 38

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                11 AUGUST 2020


6                        EXECUTIVE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20
DOCUMENT INFORM AT ION




Author                           Director Executive Services, Debra Iezzi
                                 Executive Services Department

Index                            ECM/Subject/Executive Branch Updates

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Executive Services to the Services & Organisation
Committee Meeting dated 11 August 2020 providing an update on operations of the Executive
Services Department for the period 1 April to 30 June 2020.


REPORT
The adopted organisation structure includes the following branches under the Executive Services
Department:
   Governance;
   People and Culture;
   Community Engagement; and
   Customer Service.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Executive Services Department.

The impact of the COVID-19 pandemic has required the reprioritisation of some projects however
every effort has been made to maintain standards of service to the community and support our
employees. The Department has also been responsive in dealing with emerging issues,
highlights include:
    Governance:
      -      Providing support to operational areas in effective risk management and business
             continuity planning.
    People and Culture:
      -      Supporting our employees and Managers to implement new temporary flexible work
             arrangements;
      -      Providing advice and assistance to employees in support of their health and
             wellbeing; and
      -      Providing WH&S advice relating to special work arrangements to ensure the safety of
             our employees and the community.
    Community Engagement:
      -      Providing relevant and timely communications through the media and web to inform
             our community of developments on the response to COVID-19 and available support.
    Customer Service:
      -      Working to ensure the needs of our customers are met and our customer service
             levels are maintained as far as possible.


                                                                                  Page 38 of 100

Section 39

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         11 AUGUST 2020


EXECUTIVE SERVICES DEPARTMENT

BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                           THE NEXT QUARTER
Governance
Support the organisation with integrity      Participated in statewide Public          Roll-out online human rights training      Finalisation of Organisational Policy
related matters                                Interest Disclosure (PID) Quarterly         targeted at public sector agencies           on Conflicts of Interest.
                                               Meeting hosted by the QLD                   for the organisation.
                                               Ombudsman.                                Preparation of response to QLD
                                             Participated in Councillor Induction        Human Rights Commission’s audit
                                               training on governance and integrity        on implementation of the QLD
                                               matters      hosted     by     State        Human Rights Act 2019 in our
                                               departments, including Department           Council.
                                               of Local Government, Integrity            Preparation of training pack for
                                               Commissioner etc.                           Councillors on governance and
                                             Council’s website content prepared          integrity matters.
                                               and published in relation to Human
                                               Rights, including a new complaint
                                               form.
                                             Review of all Council adopted
                                               policies for compliance with the
                                               Human Rights Act 2019 completed.
                                             Prepared draft Conflict of Interest
                                               COI Policy.
Support Council’s    Audit   and   Risk      Coordinated       and      prepared       Review and finalisation of Internal        Prepare reports and information for
Committee                                      Governance and Risk related                 Audit   Reports   for   Contractor           upcoming Audit and Risk Committee
                                               documents and reports for Council’s         Management & WH&S Management                 Meeting in late August.
                                               Audit and Risk Committee Meeting            of Contractors.
                                               of 5 June 2020.
Coordination of Council’s     Business       COVID-19 BCP prepared for               Review and implement improvement             Commence implementation of 2019
Continuity Framework                           Governance. Note - all other              opportunities identified from internal         Audit     recommendations          for
                                               Departments have also submitted           audit.                                         Business Continuity Planning – has
                                               BCPs in relation to COVID-19.                                                            been delayed due to other priorities.




                                                                                                                                                            Page 39 of 100

Section 40

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        11 AUGUST 2020


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
Governance    and   Risk   Management      Completed Insurance Renewals for             Self-Assessment        Questionnaire       Continue    implementation       of
Items                                        20/21.                                         completion for LGMS.                         recommendations resulting from the
                                           Attended       training on     claims        Preparing privacy advice for ELT             internal audit    of    the    risk
                                             management by our insurer.                     consideration – to avoid misuse of           management framework.
                                           Submitted new internal insurance               personal information.
                                             claims       process    management           Annual     update     of   Council’s
                                             proposal for ELT.                              Delegations Registers.
                                           Updated external website with                Coordination and completion of
                                             insurance       claims  management             Annual Report for FY2019-20.
                                             process and form for the public.
                                           Prepared two quotes for new types
                                             of insurance coverage from ELT
                                             consideration – crime and statutory
                                             liability coverage.
                                           Prepared new draft Compliance and
                                             Enforcement Policy.
                                           Assistance on the COVID-19
                                             taskforce by providing advice.
Business as Usual activities               16 insurance claims received*                Ongoing coordination of progress           FY2019-20 RTI Statistics reporting
                                           6 Administrative Action Complaints             updates for the Operational Plan             for Department of Justice and
                                             received (increase of 100% from                and Branch Plans for Council.                Attorney-General.
                                             last qtr);                                   Continue to network with Local and
                                           8 Right to Information (RTI)                   State groups for best practice and
                                             applications received (increase of             process improvements.
                                             100% from last qtr).                         Creation of a Council-wide litigation
                                           Ongoing advice and support to                  tracker identifying all legal cases
                                             operational teams on various                   that Council is currently engaged in
                                             matters including risk and policy              for CEO consideration.
                                             advice.                                      Operational processing of insurance
                                                                                            claims has commenced (formally
                                        *Note – 12 public liability claims received,        processed by our insurer, now any
                                        mainly for tree branches and 4 motor                claims below our excess threshold
                                        vehicle claims.                                     need    to    be     processed     by
                                                                                            Governance).




                                                                                                                                                           Page 40 of 100

Section 41

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                      RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                          THE NEXT QUARTER
People and Culture
Leadership     Group     Development      Promote the progress and purpose             Review the program for 20/21 and          Two follow up sessions have been
Program                                     of the group to teams and the                  organise development sessions.              scheduled with the Leadership
                                            organisation, reinforcing the agreed                                                       Group between July and December
                                            values which have been adopted by                                                          2020 to check in and reinforce the
                                            the group.                                                                                 agreed values.
Mentoring Program                         Check-ins with mentor pairs for              Program put on hold for the majority      Re-engage the mentoring program.
                                            feedback on the relationship in the            of participants due to competing
                                            current climate.                               priorities for both mentors and
                                                                                           mentees.
Young Employees Program                   Program put on hold due to COVID-            Program is on hold due to COVID-          Recommence the program pending
                                            19                                             19.                                         budget, availability of participants
                                                                                                                                       and external influences.
Traineeships                              Recruitment of trainees put on hold          Place bid for one additional trainee      Resume recruitment process for two
                                            due to COVID-19 restrictions and               in Community Support (commencing            trainees       (ICT/      Economic
                                            limited resources.                             2021).                                      Development) that were put on hold
                                                                                                                                       due to COVID19.
                                                                                                                                     Consider future opportunities for
                                                                                                                                       traineeships in the event of govt.
                                                                                                                                       funding being made available.
Work Health and Safety                    Managed Workcover claims and                 Implementation of the new WH&S            Implementation of the new WHS
                                            supported employees in suitable                Management System Plan.                     Management Plan and training
                                            duties     and   return    to    work        Continuous improvement of the               programme.
                                            programmes.                                    WHS       system     and     Safety       Identify and implement strategies to
                                          Development of TAKE 5 papers to                Awareness.                                  reduce workcover premiums.
                                            reflect    COVID-19     safe     work        Ongoing management of cases to            Continue to roll out the SKYTRUST
                                            practices.                                     achieve better claim and return to          system in a staged process.
                                          Modification of work practices (eg:            work outcomes.                            Identify and implement strategies to
                                            number of passengers in vehicles)            Providing    COVID-19     response          improve      Council’s    workcover
                                            to reflect COVID-19 restrictions.              services.                                   premiums.
                                          Complete project plan for the                Implementation of the SKYTRUST
                                            SKYTRUST                          pilot        system for identified pilot groups
                                            (WHS/rehabilitation system).                   (Parks and Gardens, Libraries and
                                                                                           Galleries).




                                                                                                                                                          Page 41 of 100

Section 42

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                        CURRENT PRIORITIES                           THE NEXT QUARTER
Co-ordinate   2019/2020      Training      Some non-essential training was not      Implementation of the 20/21 training       Minimal essential training to be
Programme and Budget                         completed due to COVID-19                  programme and review of training             completed as available.
                                             restrictions.                              provision/methods given COVID-19
                                           Online training has been offered           restrictions.
                                             where possible.                          Training          limited          to
                                           Preparation of the 20/21 training          essential/compliance training due to
                                             programme and budget.                      COVID-19 and financial constraints.
Workforce Planning                         Put on hold due to COVID-19              Put on hold due to COVID19                 Review the Workforce Planning
                                             priorities.                                priorities                                   Strategy.
                                                                                                                                   Work with Departments to identify
                                                                                                                                     key priority areas and commence
                                                                                                                                     operational workforce planning incl.
                                                                                                                                     the identification of actionable
                                                                                                                                     strategies and addressing specific
                                                                                                                                     workforce gaps incl. succession
                                                                                                                                     planning.
Council’s Drug and Alcohol Policy and    Random testing put on hold due to        Review of Drug and Alcohol policy to         Re-commence random testing.
Procedure                                  COVID-19.                                  incorporate           pre-employment
                                                                                      medicals.
Employee Relations                         Review of P&C policies for             Resolution      of    any   emerging         Prepare for commencement of
                                             compliance with the Qld. Anti-            workplace issues.                             enterprise bargaining for the new
                                             Discrimination Act.                    Endorsement of updated P&C                     Certified Agreement.
                                                                                      policies
Employee Wellness Program                  Development    of   a   wellbeing      Maintain wellness site with up to            Identify initiatives that will have a
                                             program to support the health and         date, relevant information and                direct impact on the well-being of
                                             wellbeing of employees during the         resources                                     employees           and       increase
                                             COVID-19 pandemic and beyond.          Produce         wellness     calendar          participation and engagement with
                                                                                       identifying key dates for wellbeing           the     Wellness       Project     incl.
                                                                                       initiatives                                   organizational team challenges.
                                                                                    Undertake a series of pulse surveys
                                                                                       with employees to identify the
                                                                                       issues they face while working
                                                                                       remotely and as a result of COVID-
                                                                                       19 to help council manage
                                                                                       their well-being.




                                                                                                                                                          Page 42 of 100

Section 43

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                           11 AUGUST 2020


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
Business as Usual activities                 Provide frontline response services         Provide response services as part of        Continue to provide response
Support the organisation with HRM              to the COVID-19 Taskforce Team                the COVID19 Taskforce Team.                   services to the COVID-19 Taskforce
services incl. payroll, work health and        including    employee     relations,        Re-commence recruitment for key               Team.
safety, recruitment, on-boarding and           wellbeing, deployment opportunities,          positions.                                  Assess future work practices,
workplace relations.                           implementing working from home              Partner with ICT to develop scope             policies and procedures post
                                               arrangements      and    supporting           for implementation of new T1 e-               COVID-19.
                                               employees      impacted   by     the          recruitment module.                         Implement project plan for new e-
                                               temporary closure of Council                                                                recruitment module.
                                               facilities.
                                                                                                                                         Finalise the recruitment process for
                                             External recruitment put on hold                                                            the P&C Manager position which
                                               from Apr-June 20.                                                                           was delayed as a result of COVID-
                                                                                                                                           19.
Community Engagement
Communications      and    Community         Date yet to be finalised to discuss         Finalise new communication tool             Continue to produce weekly Mayor
Engagement Strategy Review incl.               Engagement component of Strategy              which is a monthly double page                Community Video update for
Review of branch services.                     with new council.                             spread in Noosa Today.                        website and social media
                                             Your Say Noosa has transitioned to          Conduct a three-month trial of the          Review monthly double page
                                               a     new       upgraded     platform.        initiative    and       review     its        spread.
                                               Completed in mid-June.                        effectiveness, prior to committing to       Investigate Budget engagement
                                             Team functioning well during                  a full year.                                  methods that could be utilised for
                                               COVID.          Rotational      roster      Commence start of weekly Mayor                future engagement on Budget.
                                               implemented to have an officer on             video segment for website and               Organise community engagement
                                               site at least three days a week.              social media.                                 discussion with councillors.

Website Project                              Website now operating effectively.          New shared model in operation, but          Conduct first quarterly catch up of
                                             Ongoing liaison with LGAQ as web              COVID-19 has prevented a regular              new Website Hierarchy Approval
                                               provider to iron out a few technical          web catch up forum.                           team.
                                               issues                                      Recorded an average of 68,000               Continue to focus on improving
                                             Continuing to provide assistance              monthly visitors to Council website           website pages content and links.
                                               and guidance on web improvements              between April and June. Over
                                               to staff.                                     90,000 unique visitors recorded in
                                             All necessary staff trained on new            April, at height of COVID-19
                                               platform.                                     lockdown.      The   three   month
                                                                                             visitation was 203,941.
                                             Staff assisted with transition of
                                               council intranet to new JADU                COVID-19 and Landfill Resource
                                               platform this included one-on-one             Recovery were popular in April at
                                               training for staff.                           the height of COVID shutdown.

                                                                                                                                                             Page 43 of 100

Section 44

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                  11 AUGUST 2020


BRANCH ACTIVITIES                  RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
                                                                                    Positions Vacant was the most
                                                                                      popular page in June.
                                                                                    Review COVID-19 webpages. Liaise
                                                                                      with Economic Development and
                                                                                      Community Services to ensure
                                                                                      content is factual and up to date.
Social Media                          Introduction of nightly COVID-19            Preparations        underway       on      Identify regular weekly posts to
                                        Community        Update    to    keep         developing a content calendar for            generate better engagement.
                                        community informed about COVID                social media through to October            Look for ways to increase Council’s
                                        locally.                                      2020.                                        Instagram following.
                                      This included videos twice a week           Further equipment purchased to
                                        which had good engagement and                 improve video content.
                                        well received.                              Review underway on current video
                                      More than 30 videos produced                  editing software to determine
                                        during the height of COVID.                   whether upgrade required.
                                      During April and May – these
                                        COVID        Community        Updates
                                        averaged a reach of about 6,200.
                                      Time-lapse camera installed for
                                        Orealla         Crescent       Bridge
                                        construction.     Regular     updates
                                        uploaded to social media to keep
                                        community informed of progress.
                                      Steady      growth    in    Facebook
                                        followers during the quarter. Now
                                        17,608 - up from 17,039 in March.
                                      LinkedIn growth continues, with an
                                        18 per cent increase in followers this
                                        quarter. There are now 3,750
                                        followers.
Corporate E-newsletter promotion      Weekly eNews produced and                 Review current software and eNews          Look to produce a video to promote
                                        delivered every Friday during               provider to ascertain a better option.       eNews subscriptions to use on social
                                        COVID-19 until June 30.                   Design limitations with current              media and website.
                                      eNews returning to a monthly                provider.
                                        edition in July 2020.
                                      Good growth with subscribers now
                                        2402 – up 13% from previous
                                        quarter.

                                                                                                                                                     Page 44 of 100

Section 45

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                            11 AUGUST 2020


BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                        CURRENT PRIORITIES                            THE NEXT QUARTER
Business as Usual activities      21 media releases prepared (as           Deliver Citizenship Ceremonies in           Produce a generic promotional
                                    listed on Council’s website)               August and lock in more permanent             video on community engagement
                                  Significant      work  on    COVID         dates for future ceremonies.                  and use of newly designed website.
                                    community matters and keeping the                                                      With COVID-19 restrictions easing,
                                    public informed.                                                                         workload is now focussing on
                                  Work resumed on arranging post                                                           roadworks, and council related
                                    COVID-19 citizenship ceremonies.                                                         matters.
                                    Three small functions have been                                                        Council budget:
                                    scheduled for August.                                                                    - Produce material for double-page
                                  Council budget:                                                                          spread for Noosa Today on budget
                                    - Produced a number of pre-budget                                                        initiatives.
                                    stories for media.                                                                       - Prepare double-page publication
                                    - Extensive budget media material                                                        for August and September.
                                    developed, including a two-page
                                    budget overview document.
                                    -Media conference arranged on
                                    Budget Day for local media
                                    -Produced Budget video, involving
                                    all councillors.


Customer Service
Recruitment and Training          Onboarding of 3 Customer Service         Training of a Customer Service              Recruit vacant permanent positions
                                    Officers and development to face to        Officer to support team leader role           (2 x FT and 1 x PT).
                                    face functions.                            with aim to backfill position in times      Continue training of customer
                                  Transition to work from home due to        of leave.                                     service team on critical areas of
                                    COVID-19 with minimal disruption to      Rates refresh training.                       knowledge.
                                    call contacts.                           Support Customer Service team
                                  Transition back to the office with         with training and coaching of CiA
                                    safety of staff considered and             request system
                                    implemented for face to face
                                    contacts.
Review of Branch Policies         COVID-19       BCP    created  and       Review Customer Service BCP.                Ensure new or changed council
                                    implemented                              Update Customer Service Cash                  policies relating to new financial
                                  COVID-19 Risk assessment created           Handling Policy.                              year are up to date on [email protected] implemented.                         Determine     branch   KPI’s   in
                                  Adoption of Flag Policy.                   preparation for performance plan
                                                                               period.

                                                                                                                                              Page 45 of 100

Section 46

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         11 AUGUST 2020


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
Continual Customer Service intranet         Update all links and processes after        Review and update pages affected           Adding quick access to iP@N pages
(iP@N) improvements                           CIA request system implementation.            by EOFY changes.                             where     media      releases   are
                                            Roll out all users’ access IP@N             Continue to update iP@N link to CiA          applicable.
                                              pages to organisation.                        request system as request types still      Linking website policies to iP@N for
                                            Review Rates pages and generate               changing.                                    easy access.
                                              quiz in preparation for peak period.                                                     Development of procedures folder
                                            Review of recognition program for                                                          for iP@N administration.
                                              feedback initiative, as well as review
                                              of iP@N knowledge pages and
                                              processes.
Service Review                              Combined        Service      Meetings       Development        of     progression      Work on identifying workflow
                                              ongoing, additional meetings on               opportunities within the branch.             improvements for the customer
                                              hold due to COVID-19.                                                                      service team.
New phone call system incl. On line         License upgrade to Purecloud 3.             Implement Skype for Business               Investigate post call survey options
Chat and Snap Send Solve requests.          Updated       Purecloud        canned         integration to Purecloud.                    including as part of email replies.
                                              responses (templates) for both              Implement training and Purecloud           Create training guides.
                                              webchat and email contacts.                   rostering.
Customer Service Charter and review of      Train and work with Noosability             Continue      to  work    with    the      Continue    to   work   with  the
the management of customer requests.          team for CiA deployment of new                Noosability team to implement the            Noosability team to implement the
                                              request system.                               new request system.                          new request system.
Business as Usual activities                Transition to and from WFH with             Peak period operationally (rates)          Review QA and training progress
                                              minimal disruption to service due to        Offer feedback on current issues             and plan, implement improvements.
                                              COVID-19                                      with CiA.
                                                                                          Review COVID-19 BCP and update
                                                                                            with learnings.




                                                                                                                                                            Page 46 of 100

Section 47

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 11 AUGUST 2020


Previous Council Consideration

Nil.

Finance

Nil.

Risk & Opportunities

The impact of COVID-19 has resulted in the reprioritisation of several projects and delayed the
delivery of some programmes.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Branch Managers of the Department were consulted in the preparation of this report.


Departments/Sections Consulted:

       Chief Executive Officer    Community Services                      Corporate Services
       Executive Officer          Director                                Director
       Executive Support          Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

X      Executive Services         Environment & Sustainable Development   Infrastructure Services
X      Director                   Director                                Director
X      Community Engagement       Building & Plumbing Services            Asset Management
X      Customer Service           Development Assessment                  Buildings and Facilities
X      Governance                 Economic Development                    Civil Operations
X      People and Culture         Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                     Page 47 of 100

Section 48

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          11 AUGUST 2020


7                        CAPITAL PROGRAM DELIVERY STATUS - 30 JUNE 2020
DOCUMENT INFORM AT ION




Author                             Asset Planning Manager, Bryan O’Connor

Index                              ECM/ Subject/ 2019-2020 Annual Capital Works Program

Attachments                        1.   Capital Projects Delivery Status – 30 June 2020



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Asset Planning Manager to the Services & Organisation
Committee Meeting dated 11 August 2020 providing an update on the status of the 2019/20
Capital Works Program and note that the anticipated 2019/20 Financial Year capital expenditure
final result will be $25.9M, equivalent to 84% of the $30.8m capital works budget.



REPORT
The purpose of this report is to inform Council of the overall status and associated activities of
the Capital Works Program to the end of June 2020. The report provides an opportunity to
highlight and discuss projects within the program and confirm the delivery status of projects
delivered throughout the 2019/20 financial year.

There were 112 active projects in the 2019/20 capital program as of 30 June 2020 (including the
carryover projects from 2018/2019) with a value of $30.8m.

1.                       Current Projects

The major focus in the final quarter of the financial year was to complete the construction phase
of projects. However, some significant projects are programmed as multi-year projects, meaning
they will be delivered over two or more financial years. Additionally, the majority of design-only
projects in the financial year are completed in preparedness for the construction phase
throughout the 2020/21 financial year

Projects currently underway or being delivered across multiple years of the capital program
include:
    Sunrise Beach – Orealla Bridge Renewal
    Hinterland Playground, Cooroy (planning & design)
    Tewantin, Hilton Terrace intersection upgrade
    Kin Kin Wahpunga Lane Bridge Renewal
    Cooran Tablelands Road Bridge Renewal
    Stage 3 Rufous St Peregian




                                                                                            Page 48 of 100

Section 49

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                11 AUGUST 2020


Image 1: Sunrise Beach – Orealla Bridge Renewal




2.   Completed Projects

A major achievement for Noosa Council was the delivery of $25.9m of capital works in a single
financial year. This is a significant result in the current environment and demonstrates that
Council continues to mature in delivering a large capital works program consistently, particularly
with the 2018/19 financial year also delivering $26.1m. The capital works framework of project
control groups and a capital works executive have continued with organisational efficiencies and
enabled staff and Councillors to make informed decisions that relate to projects that are delivered
throughout the year. This is aided by having valuable resources within the design and delivery
teams.

Some of the projects completed across the capital program throughout 2019/20 include multi-
year projects that have been underway for more than one financial year and are considered:
    large projects that require extended periods for delivery, or need to be timed to reduce the
      impact on the community; or
    are complex that require extended planning and consultation periods before construction
      can commence.

These include but are not limited to the following projects:
   Cooroy – Black Mountain Road Priority Sections and Road Reconstruction
   Noosaville - Gympie Terrace Stormwater Renewal
   Cooran – Pioneer Park Facilities Upgrade
   Peregian Beach – Peregian Beach Public Amenities Renewal

In addition, delivery of the 2019/20 road reseal program of approximately $4m was completed
across both coastal and hinterland sealed road networks.


                                                                                  Page 49 of 100

Section 50

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                               11 AUGUST 2020


Image 2: Noosaville – Hilton terrace Corridor upgrade




3.     Summary

The current capital delivery expenditure to 30 June 2020 is $25.9m, or 84% of the capital
program.

It is important to note that there are $5.7m in outstanding commitments. This amount not only
reflects those projects currently being delivered, but also new contracts awarded for the 2020/21
financial year capital program.

The financial outcome of the 2019/20 financial year capital works program will also be reported to
Council in the first budget review of 2020/21 financial year and will confirm the significant
achievement of delivering another large capital works program throughout 2019/20.

Image 3: Black Mountain - Black Mountain Road Reconstruction




Previous Council Consideration
Nil.

Finance
The final capital delivery expenditure to 30 June 2020 including actuals and commitments is
$25.9m or 84% of the full year Capital Program. The delivery and completion of projects
continues across the Program with staffing resources to be increased in the coming months to
support the design and delivery phases of the 2020/21 projects.




                                                                                  Page 50 of 100

Section 51

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 AUGUST 2020


The table and the graph provided shows a breakdown of expenditure as at 30 June 2020.

 Capital Works Program                      Amount
 YTD Actual Expenditure                      $25,920,940
 Committed Expenditure                        $4,845,178
 Remaining Capital Expenditure                  $106,483
 Full Year Budgeted Expenditure              $30,872,601


              Committed                   Remaining Capital
              Expenditure                   Expenditure…
                15.69%

                                                  YTD Actual
                                                 Expenditure
                                                   83.96%




Risks & Opportunities
The current risk to the Capital Program is the resourcing of Planning, Design and Delivery staff.
In mitigating this risk, projects have been reviewed and where necessary, projects were re-
profiled and adjusted through the budget review process, although there was no budget review in
the second half of the year due to COVID-19. In addition, the recruitment activities have resulted
in the appointment of a capital planning position, to assist in the delivery of the 2020/21 and
future years capital program.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Project delivery staff within the Infrastructure Services Department were consulted in the
preparation of this report.
       Chief Executive Officer    Community Services                      x   Corporate Services
       Executive Officer          Director                                    Director
       Executive Support          Community Development                   x   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

       Executive Services         Environment & Sustainable Development   x   Infrastructure Services
       Director                   Director                                x   Director
       Community Engagement       Building & Plumbing Services            x   Asset Management
       Customer Service           Development Assessment                      Buildings and Facilities
       Governance                 Economic Development                        Civil Operations
       People and Culture         Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             x   Infrastructure        Planning,
                                                                              Design and Delivery




                                                                                         Page 51 of 100

Section 52

ATTACHMENT 1




  Page 52 of 100

ATTACHMENT 1
                                     ay,   =|            a                                                                                                                    .
                          NOOSA COUNCIL                                                                                                                                Capital Schedule
                                                                                                                                                                                 As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

  5008 12         500812 - Orealla Crescent Overpass Refurbishment                              1,765,000      1,754,514        754,515         754,515       966,099         2,078,[email protected]%
  500864          500864 - Tewantin Doonella Bridge Renewal                                      282,000        293,047         143,047         143,047        127,169          76,[email protected]%
  500962          500942 - Cooran Tablelands Road Bridge Renewal                                 100,000         100,000        50,000          50,000          82,220           12,980 ©     164.44%
  500970          500944 - Noosa Heads Weyba Road Pedestrian Bridge Rehabilitation               154,000         154,000        154,000         154,000        145,270               0g        94.33%
  500972          500946 - Kin Kin Wahpunga Lane Bridge Renewal Annual                          200,000         200,000         50,000          50,000          82,180           12,980 ©     164.36%
                                                                            Total Bridges      2,501,000       2,501,561       1,151,561      1,151,561       1,402,939       2,180,731       121.83%

  500510          500510 - Noosa Main Beach - Sand Pump Replacement                                   0               0               0              0          45,253               08         0.00%
  500820          500820 - Renewal of revetment wall at O-Boats Gympie Tce, Noosaville                0           17,707         17,707          17,707         29,592               08       167.12%
  500867          500867 - Peregian Beach Boardwalk Renewal North of Tower to Access 57          415,000        410,931         30,931          30,931          18,128               0g        58.61%
  500965          500930 - Beach Access Shower Renewal Claude Batten Drive                            0         45,980           45,980         45,980          23,629               [email protected]%
  501012          500980 - Installation of Permanent Tide Gauges in Lower Noosa River                 0          47,500          47,500          47,500         20,237               [email protected]%
  501013          500981 - Noosa Council Flood Forecasting system                                     0          47,500          47,500          47,500         75,021               09       157.94%
                                                        Total Coastal Canals and Waterways       415,000       569,618          189,618         189,618        211,859               0        111.73%

  501005          500965 - Cooroy Cemetery Plant & Equipment Shed                                60,000          60,000         60,000          60,000               0               0g         0.00%
                                                                         Total Cemeteries        60,000          60,000         60,000          60,000               0               0          0.00%

  500953          500939 - Tewantin Former TAFE Property Purchase                                     0               0               0              0           6,626            3,[email protected]%
                                                          Total Commercial Land & Property            0               0               0              0          6,626            3,196          0.00%

  500842          500840 - Tewantin SES Termite Damage                                                0               0               0              0          35,424               [email protected]%
  500857          500851 - Sunshine Beach NAC - Roof Replacement                                232,500        228,650         228,650         228,650         410,196               [email protected]%
  500873          500873 - NAC - LTS AMP Pool Renewal Program                                         0               0               0              0           8,956               [email protected]%
  500874          500874 - Sunshine Beach NAC - Renewal Program                                  700,000        700,000         700,000         700,000        621,105               08        88.73%
  500907          500905 - Rufous St - Stage 3 Community House, Car Park & Landscape           3,195,000       3,147,746       3,147,746      3,147,746       681,570            16,[email protected]%
  500908          500906 - Rufous St - Stage 3 Civil Works (Water Main)                          53,000          53,000          53,000         53,000          54,488               [email protected]%
                                                                                                                                                                                 Page 52 of 100

Section 53

Page 53 of 100

NOOSA COUNCIL                                                                                                                                    Capital Schedule
                               ¢     ay     al 4          >                                                                                                                       .

                                                                                                                                                                                     As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

   500916         500912 - Peregian Beach Surf Club Roof Replacement                                     0         164,412         164,412         164,412          16,328               [email protected]%
   500940         500925 - Rufous St - Stage 3 Digital Hub Expansion                                42,000         42,000           42,000         42,000           24,173            2,[email protected]%
   500941         500926 - Rufous St - Stage 3 Project Management                                  130,000         130,000         130,000         130,000          74,657           60,[email protected]%
   500952         500931 - Community Facilities Minor Works Brought Forward                              0         184,418         184,418         184,418         173,824           34,[email protected]%
   500973         500947 - Noosaville Wallace House Restumping                                     85,000          85,000           85,000         85,000          123,610            9,760 &     145.42%
   510009         510009 - NAC Pool Earthing System                                                      0               0         150,000         150,000           7,403               0@         494%
   510015         510015 - NAC Replacement of Light Pole Fittings                                        0               0          59,500         59,500                0               [email protected]%
   510016         510016 - Noosa Leisure Centre Replacement of Ventilation Fans                          0               0          30,000         30,000                0               [email protected]%
   510018         510018 - Pomona School of Arts Hall - Amenities Upgrade                                0               0               0               0            630             1,[email protected]%
   510023         510023 - Legal and Procurement Advice, Ricon Insolvency                                0               0               0               0         135,236           34,[email protected]%
                                                                  Total Community Facilities      4,437,500      4,735,226        4,974,726       4,974,726      2,367,601          159,428        47.59%

   500858         500852 - Tewantin Administration Building Roof                                         0          81,775          81,775          81,775            -241               0@         -0.29%
   500963         500933 - Tewantin Admin Building - Security Upgrade                                    0         86,606          86,606          86,606           79,973               [email protected]%
                                                                   Total Corporate Buildings             0         168,380         168,380         168,380          79,732               0         47.35%

   500974         500978 - Shire Gravel Resheeting Annual                                          410,000         410,000         410,000         410,000         437,722          183,[email protected]%
                                                                  Total Gravel Road Network        410,000         410,000         410,000         410,000        437,722           183,671       106.76%

   500661         500661 - Noosa North Shore Campground Redevelopment                            2,410,000       2,456,544       2,892,544        2,892,544      2,995,314           22,[email protected]%
   500663         500663 - Noosaville, Noosa River Holiday Park Large Amenities Refurb                   0           5,000           5,000           5,000           4,588               [email protected]%
                                                                         Total Holiday Parks      2,410,000       2,461,544       2,897,544       2,897,544      2,999,902          22,971        103.53%

   500651         500651 - Noosaville Library, Refurbishment Planning and Design                         0         30,000           30,000         30,000           30,518               [email protected]%
   500975         500948 - Cooroy Butter Factory Arts Centre (The Pottery) Louvre Repla             15,000          15,000          15,000          15,000          14,400               [email protected]%
   510010         510010 - Cooroy Butter Factory Roof & Gutter Upgrade                                   0               0          88,000         88,000           61,588               [email protected]%
                                                                   Total Libraries & Galleries      15,000         45,000          133,000         133,000         106,507               0         80.08%

   501006         500300 - Minor Capital Acquisitions                                                    0               0               0               0          26,329               [email protected]%
                                                                                                                                                                                   Page 53 of 100

Section 54

Page 54 of 100

NOOSA COUNCIL                                                                                                                                  Capital Schedule
                                     af     >            >                                                                                                                      t

                                                                                                                                                                                   As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

                                                                       Total Not Applicable             0              0               0               0          26,329               0          0.00%

   500551         500551 - Noosa Hinterland Priority Playground - Planning & Design              300,000          321,527         321,527        321,527         281,973         291,[email protected]%
   500594         500594 - Botanic Garden Shade House                                            380,000         367,602         367,602         367,602        306,069            6,[email protected]%
  500882          500882 - Peregian Beach Town Square Upgrade Planning & Design                         0          13,890          13,890         13,890          11,113               [email protected]%
  500976          500949 - Lake Macdonald Botanic Garden Irrigation System Renewal                 57,330         57,330          57,330          57,330          51,568               [email protected]%
  500977          500950 - Lake Macdonald Botanic Garden Signage Renewal                          25,608          25,608          25,608          25,608          16,258               08        63.49%
   500978         500951 - Noosa Heads Alex Dan Park Playground Renewal                            67,427          67,427         67,427          67,427          67,761               [email protected]%
   500979         500952 - Sunrise Beach Ben Lexcen Drive Park Playground Renewal                 60,000          60,000          60,000          60,000          61,593               [email protected]%
  500980          500953 - Shire BBQ Renewal Program Annual                                        75,000          75,000          75,000         75,000         63,672                [email protected]%
  500981          500954 - Shire Park Furniture Renewal Program Annual                            50,000          50,000          50,000          50,000         26,443                08        52.89%
  500982          500955 - Shire Park Shelter Renewal Program Annual                               45,000         45,000          45,000          45,000         34,798                08        77.33%
  500993          500966 - Cooran Pioneer Park Facilities Upgrade Annual                           65,000         65,000          65,000          65,000          67,765               0®@      104.25%
  500983          500979 - Noosaville Gympie Tce Park Furniture Renewal Annual                    150,000         150,000         150,000        150,000         147,721               08        98.48%
   510008         510008 - Noosa Heads Lions Park - Damage Repair                                       0              0          60,000          60,000          41,526               08        69.21%
                                                                 Total Parks & Playgrounds      1,275,365      1,298,383        1,358,383       1,358,383      1,178,259         297,468         86.74%

   500671         500671 - Noosa Heads, Park Road Boardwalk Construction                                0              0          80,000          80,000          47,784          19,[email protected]%
  500906          500903 - Tewantin, Hilton Terrace CNLGGP Shared Pathway                               0          18,074          18,074         18,074          11,506               [email protected]%
  500923          500919 - Wallace Park Pathway 5&6                                                     0          14,609          14,609         14,609          15,247               0g       104.37%
  500984          500956 - Shire Pathway Renewal Program Annual                                   100,000         100,000         100,000        100,000         117,600               0        117.60%
  500994          500967 - Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades              174,000         174,000         174,000        174,000          10,863               [email protected]%
   510013         510013 - Noosa Heads Noosa Drive Boardwalk                                            0              0               0               0          39,324               [email protected]%
   501020         510024 - Claude Batten Dr Pathway and Noosa Main Beach Boardwalk                      0              0               0               0         46,798                [email protected]%
                                                               Total Pathways & Boardwalks        274,000        306,683         386,683        386,683          289,122          19,869         74.77%

    100726        100726 - Peregian Beach Public Amenities Renewal                               577,000          594,215         594,215       594,215          613,481               08       103.24%
                                                                     Total Public Amenities       577,000         594,215        594,215         594,215         613,481               0        103.24%

  500312          500957 - Shire Bus Shelter Disabled Compliant Program Annual                   500,000         500,000         500,000        500,000          598,567               08       119.71%
                                                                                                                                                                                 Page 54 of 100

Section 55

Page 55 of 100

&        iS          |                                                                                                                    =
                          NOOSA COUNCIL                                                                                                                                 Capital Schedule
                                                                                                                                                                                  As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

                                                        Total Public Transport Infrastructure    500,000        500,000         500,000         500,000         598,567               0        119.71%

  500530          500530 - Whole of Shire Reseal & Rehabilitation Program                              0               0               0              0           6,162               08         0.00%
  500840          500757 - Black Mountain - Road Priority Sections and Road Reconstruct         1,290,000       1,318,214       1,318,214      1,318,214       1,542,370           7,[email protected]%
  500967          500936 - Directional Signage Walter Hay Dr Roundabouts and Reef St                   0         26,533          26,533          26,533             173               00         0.65%
  500986          500958 - Shire Kerb & Channel Renewal Program Annual                            100,000        100,000         100,000         100,000         82,738               [email protected]%
  500987          500959 - Shire Reseal & Rehabilitation Renewal Program Annual                 3,600,000       3,600,000      3,600,000       3,600,000       4,067,439       3,165,874 &     112.98%
  500996          500969 - Boreen Point, Tewah St Gravel Road Seal                               250,000        250,000         250,000         250,000          62,533            3,[email protected]%
  500997          500970 - Boreen Point, Hector Street Road Widening and Kerb & Channel           97,000          97,000          97,000          97,000         87,054               [email protected]%
  500998          500971 - Pomona, Ambulance Street Sealing of Gravel Section                    200,000        200,000         200,000         200,000          61,120             3210        30.56%
   501014         500982 - Tewantin Beckmans Rd Bypass Forward Design                                  0         50,000          50,000          50,000          69,112             850 ©      138.22%
   510017         510017 - Damaged Guardrail Renewals (Various)                                        0               0          51,800          51,800         26,032           26,[email protected]%
   510022         510022 - Sunrise Beach, Tingira Cres Emergent Slip Repair                            0               0               0              0         608,284           10,[email protected]%
   510025         510025 - Sunshine Beach, Ross Cres Emergent Slip Repair                              0               0               0              0         550,607            9,999 ©       0.00%
                                                                Total Sealed Roads Network      5,537,000       5,641,747      5,693,547       5,693,547       7,163,625       3,224,978       125.82%

   510012         510012 - Design Noosa District Sports Road & Pathway Network                         0               0         50,000          50,000          63,152               08       126.30%
                                                          Total Sports Ground and Facilities           0               0         50,000          50,000          63,152               0        126.30%

  500919          500915 - Swan Avenue Drainage                                                        0         20,000          20,000          20,000          19,088            7,[email protected]%
  500920          500916 - Gympie Terrace Stormwater                                            1,200,000       1,184,831       1,184,831      1,184,831       1,419,086           7,[email protected]%
  500942          500927 - Stormwater Backflow Vulnerability Assessment                                0           5,287           5,287           5,287              0               [email protected]%
  500954          500937 - GPT Liner Net Replacement                                                   0          15,000          15,000          15,000         14,965               [email protected]%
  500988          500960 - Shire Bioretention Basin Renewals Program Annual                       80,000         80,000           80,000         80,000           7,810            2,[email protected]%
  500989          500961 - Shire Pit Structure Renewal Program Annual                             150,000        150,000         150,000         150,000        107,064           11,[email protected]%
  500999          500972 - Noosaville, Project Ave Stormwater Drainage Easement Upgrade          250,000        250,000          50,000          50,000          12,676            4,090 ©      25.35%
   510014         510014 - Cooroy Apex Park Drainage                                                   0               0               0              0          24,315               08         0.00%
                                                                 Total Stormwater Drainage      1,680,000       1,705,118      1,505,118       1,505,118       1,605,004         33,285        106.64%

  500968          500938 - George Pearce Memorial Bench and Parkyn Hut Sign Renewal                    0          14,156          14,156          14,156         11,941               [email protected]%
                                                      Total Streetscapes and Road Corridors            0          14,156          14,156          14,156         11,941               0         84.35%
                                                                                                                                                                                Page 55 of 100

Section 56

Page 56 of 100

aly    =            —™                                                                                                                      re
                          NOOSA COUNCIL                                                                                                                                  Capital Schedule
                                                                                                                                                                                    As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

  500300          500546 - Whole of Shire Forward Planning & Design Program - Construct          350,000         300,000         300,000         300,000         348,911            5474 ©      116.30%
  500678          500678 - Castaways Beach, David Low Way Safety and Corndor Improveme                  0          41,995          41,995          41,995         34,466                [email protected]%
  500679          500679 - Tewantin, Hilton Tce & Ernest St Intersection Upgrade Constr          1,800,000       1,917,976      3,617,976       3,617,976       2,252,379         802,[email protected]%
  500893          500893 - Sunshine Beach Pacific Avenue Pathway, Pedestrian & Drainage                 0         28,444           28,444         28,444            3,836               08        13.49%
  500951          500929 - Noosaville Gympie Terrace Corridor Renewal Stage 2                     764,000         764,000         764,000         764,000        479,750               [email protected]%
  500990          500962 - Noosa Heads Leslie Drive Koala Pole Renewals                            14,000          14,000          14,000          14,000           9,650               [email protected]%
   501000         500973 - Transport Strategy, Walking & Cycling Strategy &CNLG Grant            650,000         650,000         600,000         600,000         349,504          102,[email protected]%
                                               Total Transport and Infrastructure Management     3,578,000      3,716,415       5,366,415       5,366,415       3,478,496         910,343        64.82%

  500894          500894 - Eumundi Rd Landfill Concept Design & Geotechnical Investigat                 0           8,020           8,020           8,020              0                [email protected]%
  500896          500896 - Eumundi Rd Landfill Recyclables Sales Shed & Education Room                  0         45,000           45,000         45,000          32,356                [email protected]%
  501001          500974 - Noosa Heads The
5	1	1	1	15	7	821	1242	102	24	95	Woods Bin Storage Enclosure 100,000    100,000         100,000         100,000         41,543                [email protected]%
   501002         500975 - Noosaville Eumundi Road Transfer Station Sealing of Gravel R           135,000         135,000         135,000         135,000         114,891              [email protected]%
  501003          500976 - Masterplan Landfill SW Controls & Design                              220,000         220,000         220,000         220,000          104,534           6,[email protected]%
   510011         510011 - Pomona Waste Transfer Station Resurfacing                                    0               0         130,000         130,000         115,001               08       88.46%
   510027         510027 - Noosaville Waste Transfer Station - Outbound Weighbridge                     0               0               0              0           14,892               0®@       0.00%
   510028         510028 - Illegal Dumping Hotspot                                                      0               0               0              0            567                 [email protected]%
                                                                   Total Waste Management        455,000         508,020          638,020        638,020         423,785            6,031        66.42%

  500686          500686 - Shire Bridge Annual Level 3 Inspections Annual                         110,000         110,000         110,000         110,000         78,856                [email protected]%
  500753          500753 - Zero Emissions Noosa Project Implementation                           380,000          759,072         759,072         759,072        272,382                10       35.88%
  500991          500963 - Shire CCTV Drainage Condition Assessment Program Annual               300,000         300,000          150,000         150,000         71,650           86,[email protected]%
  500992          500964 - Shire Road Infrastructure Asset Data Mgt & Condition Annual           350,000         350,000          275,000         275,000          14,251          83,[email protected]%
   501004         500977 - Asset Management Systems Implementation                                250,000        250,000          175,000         175,000         77,219                [email protected]%
   510020         510020 - Noosa Junction Streetscape                                                   0               0               0              0            3,515          13,[email protected]%
   510021         510021 - Disaster Recovery - Bushfires 2019 - Coordination & PM                       0               0               0              0          25,361                08        0.00%
                                                                   Total Asset Management        1,390,000      1,769,072       1,469,072       1,469,072         543,234         183,551        36.98%

                                                                                                                                                                                  Page 56 of 100

Section 57

Page 57 of 100

ay     —™           -                                                                                                                      1
                          NOOSA COUNCIL                                                                                                                                  Capital Schedule
                                                                                                                                                                                   As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

  500518          500518 - Plant and Fleet Replacement Program                                   1,484,040      1,816,970       1,254,088       1,254,088        796,413          209,[email protected]%
                                                              Total Fleet - Plant Replacement   1,484,040       1,816,970       1,254,088       1,254,088        796,413         209,345         63.51%

  500542          500542 - Implementation of Cl Anywhere Functionality for TechnologyOn          800,000         906,717         906,717         906,717         438,923           81,[email protected]%
                                                               Total Information Technology      800,000          906,717        906,717        906,717         438,923            81,162        48.41%

   500107         500107 - Noosa River Hydraulic Model                                                  0         34,910          34,910          34,910         34,910                [email protected]%
  500714         5007 14 - Whole of Shire, Climate Change Adaptation Strategy                     50,000         252,305          252,305       252,305         293,512           105,[email protected]%
  500716          500716 - Whole of Shire, Project Team Resources for New Planning Sche           450,000         581,048        581,048         581,048        529,538             2,[email protected]%
  500889          500889 - Shire Project Team Materials & Services                                      0         46,952           46,952         46,952          37,566            1,[email protected]%
  500890          500890 - Shire Planning Scheme Consultancy                                            0         136,142         136,142         136,142        182,091           443708       133.75%
  500995          500968 - Shire Project Place Spaced Approach - Placemaking Pilot Prog           100,000         100,000         100,000         100,000            102               [email protected]%
                                                           Total Planning Scheme Expansion       600,000        1,151,356       1,151,356       1,151,356       1,077,718         153,821        93.60%

                                                                              Grand Total     28,398,905      30,880,183      30,872,601      30,872,601     25,920,940        7,669,851        83.96%

                                                                                                                                                                                 Page 57 of 100

Section 58

Page 58 of 100

NOOSA COUNCIL                                                                                                                                      Capital Schedule
                                                                                                                                                                                         As at 30 June 2020

Report run date: 27-Jul-2020 08:41:33

                  Capital Works Program
                  YTD Actual Expenditure                                                         $25,920,940
                  Committed Expenditure                                                           $4,845,178
                  Remaining Capital Expenditure                                                     $106,483
                  Full Year Budgeted Expenditure                                                 $30,872,601

                               Expenditure                  |    |      Expenditure
                                15.69%              EE                     0.34%

                                                                                                                                                                                     Page 58 of 100

Section 59

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      11 AUGUST 2020


8                        INFRASTRUCTURE SERVICES DEPARTMENT UPDATE - 4TH QUARTER 2019-20
DOCUMENT INFORM AT ION




Author                           Director Infrastructure Services, Carl Billingham
                                 Infrastructure Services Department

Index                            ECM/ Subject/ Branch Management/ Infrastructure Services

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Infrastructure Services to the Services &
Organisation Committee Meeting dated 11 August 2020 providing an update on operations of the
Infrastructure Services Department for the period 1 April to 30 June 2020.


REPORT
The adopted organisation structure includes the following branches under the Infrastructure
Services Department and functions within the Director’s Office:
    Asset Management;
    Buildings and Facilities;
    Civil Operations;
    Disaster Management;
    Infrastructure Planning, Design and Delivery; and
    Transport Strategy.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Infrastructure Services Department.




                                                                                            Page 59 of 100

Section 60

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                            11 AUGUST 2020


INFRASTRUCTURE SERVICES DEPARTMENT

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
Asset Management
Finalise the Noosa Spit Shoreline             The SEMP has been reported to               Undertake planning for approvals          Prepare for SEMP implementation
Erosion Management Plan (SEMP) and              Council.                                      proposed in the SEMP.                       for the 2020/2021 budget.
develop an action plan to prioritise any
recommendations arising from the
SEMP
Complete Pathways & Boardwalks and            The Pathways AMP is currently in            The Parks & Playgrounds AMP is            Complete the final draft of the AMPs
the Parks & Playgrounds Asset                   draft format but still requires more          behind schedule but will be drafted         for adoption by Council.
Management Plans                                work with data information.                   by the end of July.
Develop pilot Lifecycle Plans for Beach       No activities have commenced.               No activities have commenced.             The development of a standard
Accesses,     Sealed      Roads      and                                                                                                  template for lifecycle plans is still to
Stormwater asset classes.                                                                                                                 be completed.
                                                                                                                                        Finalise lifecycle plan template and
                                                                                                                                          commence          development         of
                                                                                                                                          Lifecycle Plans.
Develop a Service/Management Plan for         Continued       consultation      with      Finalise the Hastings Street service      Have the Service Plan endorsed by
Hastings Street Noosa.                          Hastings Street Association has               management plan.                            Council.
                                                seen the timeframes extended for
                                                the service plan, as a number of
                                                items require further development
                                                before they can be included within
                                                the document. This includes the
                                                collation of maintenance plans and
                                                activities that are specific to the
                                                infrastructure within Hastings Street.
Asset Data Management program                 Buildings       and       Stormwater        Work      Order        Management         Asset Detail Data Reports and
                                                revaluations have been undertaken             development is currently on task.           Dashboard.
                                                and are finalising the draft report.        Sealed road asset condition survey        Commence        new    work     order
                                                                                              has commenced.                              management pilot project.
                                                                                                                                        Validation of road data from survey.
Business as Usual activities                  Development of the 2020/21 reseal           Preparation of an alternative             Ongoing development of the
                                                program.                                      2020/21 capital works program.              Technology One system to improve
                                              Continual development of asset                                                            asset inspection practices.
                                                working groups.

                                                                                                                                                               Page 60 of 100

Section 61

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        11 AUGUST 2020



BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                       THE NEXT QUARTER
Buildings & Facilities
Ensure Council owned and operated              Shelter renewal program                     Grant Funded Projects                  Shelter Renewal program
assets continue to follow the Noosa look       BBQ renewal program                         BBQ renewal program                    BBQ renewal program
and feel guidelines                            Shower renewals                             Shelter renewal program                Shower renewal
                                               Bottle Fill Stations                        Shower renewal                         Grant Funded Projects
Management of Council engaged                  Pest Control Evaluation                     Security Monitoring Contract           Ensure all Council contractors have
contractors to maintain levels of service                                                    Trade Services Review                    completed their requests as per
and ensure availability of staff during a                                                                                               contracts.
disaster.
Ensure compliance of shire wide assets         Test and tag electrical devices             Test and tag electrical devices        Continue      as    per   scheduled
to meet legislative requirements               Back flow prevention                        Electrical RCD testing                   maintenance of all compliance and
                                               Fire services                               Back flow prevention                     legislative requirements.
                                               Lift maintenance                            Fire services
                                               Air conditioning maintenance                Air conditioning maintenance
Delivery of 90% of the Capital Works           Tewantin SES Roof replacement               Shelter renewal program                Shelter renewal program
Program as approved by the CWE                 Wallace House Restumping                    BBQ renewal program                    BBQ renewal program
                                               19/20 Capital Works Completed               Shower renewal                         Shower renewal
                                                                                             Grant Funded Projects                  Grant Funded Projects.
                                                                                             Progress with Noosa Waters’ entry
                                                                                               design.
Review of systems and services to              Invitation to Quote (ITQ) for services      ITQ for pest control in community   Ensure all contracts have          been
maintain a high service level.                   (Pest Control).                               buildings.                            completed for the financial year
Business as Usual activities                   Back flow prevention devices                Back flow prevention.                  Planned maintenance activities.
                                                 serviced as per schedule.                   COVID-19 staff and public safety       Reactive maintenance activities.
                                               Continued asset compliance for                activities.
                                                 FY19/20.                                    Shire     Assets   compliance for
                                               COVID-19 staff and public safety              FY20/21.
                                                 activities.                                 Grant Funded Projects
                                               Shelter Assets Captured                     Building and Facilities working
                                               Distribution Boards Captured                  group.
                                                                                             Shelter asset capture.




                                                                                                                                                           Page 61 of 100

Section 62

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                           11 AUGUST 2020



BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                         THE NEXT QUARTER
Civil Operations
Implement QitPlus system for reporting          Group text messaging in place for          Ongoing group text messaging to be       Continue with group text messaging
by on call officers.                              use by On Call Officers                      used as an interim measure.                approach.
Develop a Strategic Tree Management             Completed Noosa Waters palms               Commence Tewantin area 20/21             Commence Peregian Beach area
Plan                                              thinning and replacement program             proactive works program                    20/21 proactive works program
                                                Completed proactive works program                                                     Continue Tewantin area 20/21
                                                  for 19/20.                                                                              proactive works program
                                                Completed the capture of tree data
                                                  for precinct areas.
Contribute   to    improved   asset             Identified issues associated with          Contributions to the new High Risk       Ongoing participation in Asset
management      outcomes    through               Dath Henderson Road culverts and             Erosion Working Group working              Working Groups including: Roads,
involvement in the Asset Working                  collaborated on solutions for repairs        group                                      Bridges, Stormwater, Parks &
Groups                                            through the Roads Working Group            Foamed Asphalt presentation for            Playgrounds
                                                Implementation                     of        Roads Working Group
                                                  recommendations from the review of         Roads Landscaping Sub-Working
                                                  footpath inspection process.                 Group

Develop a plan for street lighting              Addressing      lighting defects           First quarterly   inspections   for      Work with the Asset Planning team
including: Renewal program for rate 3             identified through the 3 monthly             2020/21.                                   to populate lighting condition data in
lighting, review of level of service to           inspection and any customer                                                             Council’s asset system
inform a plan for lighting upgrades and           requests.
reducing      ad     hoc    installations,
Opportunities to implement LED lighting.
Conduct Business Improvement Review             Assessment of grader utilisation and       Detailed        assessment of            Prepare Briefing note to Executive
of the Branch                                     future    requirements     including         recommendations to determine               Team with a prioritised action plan.
                                                  discussions with Gympie Regional             future actions.
                                                  Council.
Review Branch Workforce Plan in                 COVID-19 Risk Assessments and              Finalise MyPlans from 19/20 and          Commence delivery of training
conjunction    with    the    Corporate           changes to work practices                    preparation of new MyPlans for             provided for in 20/21 budget
Workforce        Planning         Project                                                      20/21                                    Review the Branch Workforce Plan
Undertake a project in conjunction with                                                                                                   taking into account the Service
Libraries Branch to improve computer                                                                                                      Review results.
literacy     for     field      workers
Performance Plans for Field Staff




                                                                                                                                                              Page 62 of 100

Section 63

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020



BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
Finalising the policy/process for planting      Finalised draft policy and guideline      Prepare Briefing note to Executive        Conduct Councillor Workshop on
in and managing structures in the road            with feedback from working group            Team                                        proposed policy and guideline.
reserve to reduce risk and complaints
Establish      a     Memorandum         of      Consultation regarding cessation of       Joint COVID-19 Risk Assessments           Joint signing of MOU by Council
Understanding between Council & the               FNBG activities due to COVID-19.            and changes to work practices               and Friends of the Botanic Gardens
Friends of Noosa Botanic Gardens                                                            Finalise MOU in consultation with
                                                                                              Friends of the Botanic Gardens
Delivery of 90% of Capital Works                Resurfacing Hastings Street and           Install  new     Botanic   Gardens        Footpath renewal projects
Program as approved by CWE                        Claude Batten Drive                         signage                                   Wallace Park Pathway
                                                Tingira Cr and Ross Cr stabilisation      Dath Henderson Rd Culvert repairs
                                                  and reinstatement                         Gravel Road Resheeting Program
                                                Leslie Drive Koala poles renewal
                                                Hector & Tewah St. gravel road seal
                                                  projects
                                                Ambulance St gravel road seal
                                                  project
                                                Completed       AW      Dan     Park
                                                  playground renewal
                                                Completed Noosa Botanic Gardens
                                                  irrigation renewal.
Develop good working relationships with         Completed additional garden bed           Continue to work positively with the      Continue to work positively with the
the    Hastings      Street    Association        renovations in liaison with HSA             Association in the delivery of              Association in the delivery of
including contribution to a Precinct Plan       Liaison with HAS regarding tree             services in the Hastings St precinct        services in the Hastings St precinct
                                                  pruning works                               particularly levy funded activities         particularly levy funded activities
                                                Carried out resurfacing works on       
                                                  Hastings Street and Claude Batten
                                                  Drive.
Disaster Management
Governance                                      The Noosa Disaster Management             Implementation of lessons learnt          Review and amendment of DM Sub-
Review of Disaster Management Plans               Plan has been tested a number of          QERMF risk assessment to be                 Plans.
                                                  times in recent months.                     undertaken to inform review of DM         Development of Threat Specific -
                                                QERMF Risk Assessment to                    Plan                                        Pandemic Plan
                                                  commence August 17th.                                                                 Specific policies written to ensure
                                                                                                                                          more robust procedures in place
                                                                                                                                        Continuous improvement



                                                                                                                                                             Page 63 of 100

Section 64

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                             11 AUGUST 2020



BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER
Capability                                     Disaster Management presentation           Recruitment     and      training  for      Looking     for   opportunities  for
Strengthen and increase the Disaster             for Councillors.                             positions continues                           improvement and utilisation of Bush
Management       capability,    including      Fire Management presentation for           Investigating initiatives for Bushfire        fire funding.
training and conducting exercises.               Councillors.                                 Funding                                     Staff training to create in-house
                                               QDMA Training and Disaster                 Working with QFES Communities                 expertise in mapping for flood
                                                 Management inductions completed              Team to develop and implement                 forecasting
                                                 for Cr Stewart as the new Chair of           recovery and resilience programs.           Planning for joint annual exercise /
                                                 the LDMG.                                  Continuing refinement of flood                Guardian training.
                                               Guardian training scheduled for              forecasting software.                       Continuous improvement
                                                 August.                                    Developing procedures for LDCC.
                                                                                            Reviewing and finalising LDCC
                                                                                              position duty statements
                                                                                            Audit of evacuation centres and
                                                                                              neighbourhood safer places.
Legislative     Compliance       Review        IGEM Bushfire review, specific to          Actioning IGEM review findings.             Implementation    of   new    IGEM
Monitor,    develop     and     maintain         Peregian Fires                                                                             framework
compliance levels in accordance with
Local, State and Commonwealth
requirements.
Engagement        &       Collaboration        Fire Events tested relationships with      Capture lessons learnt in final             Continual building of relationships
Build and maintain internal and external         both    internal     and     external        format    from     all   stakeholder          through collaborative approach
partnerships/ networks to strengthen the         stakeholders                                 agencies.
Noosa Shire community resilience.              LDMG        Bushfire      De-briefing      Continue building relationships
                                                 Scheduled for August.
Infrastructure Planning, Design & Delivery
Finalise signage guidelines & signage         Refined signage requests process            Include refined signage requests            Implement signage guidelines and
design criteria.                              Reference made to the Local                   process in the Noosa Signage                  criteria for use by all staff
                                                Government Neutral Services Signs             Guidelines                                  Monitor and update as required
                                                Public Places Guide 2019 document           Guidelines and criteria to be
                                                in the Noosa Signage Guidelines               finalised for adoption by Director.
Progressive development of Streetscape       Planning from the Noosa Drive and            Planning for the Noosa Drive and            Continue working on concept report
Plans in accordance with the Noosa             the Hastings Street precincts is               Hastings      Street    precincts   in        for the Noosa Drive and Hasting
Design                      Principles.        progressing.                                   conjunction with the HPR cycle                Street precincts.
(Gympie Terrace, Cooroy, Pomona,             Place Design has prepared a draft              planning project.                           Continue working with Coles on the
Peregian, Thomas Street, Noosa                 streetscape consultation package for         Working with the Noosa Junction               redevelopment of the Bowls club
Junction)                                      the Noosa Junction Association.                Association and Place Design to               site.
                                                                                              produce concept plans for a

                                                                                                                                                               Page 64 of 100

Section 65

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         11 AUGUST 2020



BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                         THE NEXT QUARTER
                                                                                              streetscape.                             Await Noosa Junction Association
                                                                                            Working with Coles on the                  consultation results to determine
                                                                                              redevelopment of the Bowls club            their priorities.
                                                                                              site.                                    Progress concept design for Noosa
                                                                                                                                         Junction streetscape, develop draft
                                                                                                                                         levy model and commence further
                                                                                                                                         consultation.
                                                                                                                                       Place making team will be included
                                                                                                                                         in development of any precinct
                                                                                                                                         planning.
                                             Regular representation at various            Presentation to new Council on           Run a series of Noosa Design
Run a series of workshops for the
                                               working groups.                                Noosa Design Principles.                   Principles workshops planned for
Infrastructure Services Department that
focus on the Noosa Design Principles         Noosa Design Principles regularly                                                         the       Infrastructure    Services
                                               discussed at working group meeting.                                                       Department.
and the relationship they have to service
level requirements for Councils Asset                                                                                                  Reviewing asset management plans
Management Plans.                                                                                                                        for alignment with the Noosa Design
                                                                                                                                         Principles.
Develop a design intent statement for all      Reviewed and endorsed 2019/2020            Continue to review and endorse           Continue to develop a design intent
new key projects; Review and endorse             Capital Works program projects with          changes in project scope prior to          statement for all new key projects
changes in project scope prior to                a focus on the design look and feel.         implementation, with a focus on the        for 2020/2021 Capital Works
implementation with a focus on the             Revised Project Management Plan              design look and feel for 2019/2020         program.
design look and feel.                            has been developed which includes            Capital Works program.                   Continue to review and endorse
                                                 a section for agreed scope and                                                          changes in project scope prior to
                                                 statement of intent.                                                                    implementation, with a focus on the
                                                                                                                                         design look and feel for 2020/2021
                                                                                                                                         Capital Works program.
Ensure that the Noosa Design Principles      Project team is working on planning          Continue working on planning from        Continue working on the planning
are    considered     in   the   cross         from Noosa Junction to Noosa Drive             Noosa Junction to Noosa Drive and          for Noosa Junction to Noosa Drive
departmental strategic planning of the         and     Hasting    Street      precinct        Hasting Street precinct upgrades.          and      Hasting     Street precinct
Hastings Street Precinct and future            upgrades.                                    Continue working on the planning           upgrades.
place making projects.                       Project team is working with the               for a Noosa Junction Streetscape         Continue working on the planning
                                               Noosa Junction Association on the              upgrade.                                   for a Noosa Junction Streetscape
                                               planning for a Noosa Junction                                                             subject to budget.
                                               Streetscape upgrade.
Cooroy      Hinterland       Playground      Procurement activities are continuing        Submit DA RFI responses.                 Complete ECI process.
designed and constructed.                      with the ECI and construction tender         Seek to enter into an ECI                Tender assessment report &
                                               submissions assessed and a                     agreement with preferred tenderer.         recommendation to Council for
                                               preferred contractor identified.                                                          approval of construction contract.

                                                                                                                                                            Page 65 of 100

Section 66

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                         11 AUGUST 2020



BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                        CURRENT PRIORITIES                            THE NEXT QUARTER
                                            Stockpile of plants and trees for use      Finalise Cooroy Maple          Street       Issue tender for Cooroy Maple
                                              in playground purchased and                  carpark and pedestrian         safety         Street carpark and pedestrian safety
                                              inspected.                                   improvements tender.                          improvements.
                                            DA RFI responses finalisation.             Councillor workshop.
                                            Revision to project management
                                              plan (PMP).
Construction of the intersection upgrade    Construction progressing with the          Ongoing communication activities            Ongoing communication activities.
and        associated         stormwater       eastern section of works complete.          informing    residents   and    the         Achieving practical completion.
improvements on Hilton Terrace to                                                          community on the progress of                Project Finalisation and handover.
improve safety for road users and                                                          construction work.
pedestrians.                                                                             Ongoing construction inspection
                                                                                           and management activities.
                                                                                         Roundabout             construction
                                                                                           commencing and working towards
                                                                                           practical completion.
Continue to rollout PTAIP DDA bus stop        Design of all sites in the 19/20         Preparation, design and planning for        Tender and Delivery 20/21 PTIAP
compliance program in line with                 PTAIP program.                             2020/2021     PTAIP    DDA      Bus           Program package 1 and 2
legislative requirements.                     Construction of Package 1,2 & 3            program commenced.
                                                completed.
Develop streetscape policy to outline         Working with the Noosa Junction          Awaiting commencement of the                Work with place making section to
funding options with the local business         Association to develop the scope,          place     making     section    within        develop a streetscape policy.
community.                                      concepts and levy model for a              strategic planning.                         Adopt    place     making     section
                                                Streetscape upgrade.                     Continue working as part of the               streetscape policy.
                                              Revised levy model prepared for a          project team working on the
                                                Noosa      Junction   Streetscape          planning     for   Noosa      Junction
                                                upgrade.                                   Streetscape subject to budget and
                                                                                           resourcing
Coordinate with DTMR the Beckman’s            Ongoing meetings are being held          Continue to progress ongoing                Secure resourcing for the detailed
Road and Cooroy Intersection upgrades.          with TMR officers and Council has          Tewantin Bypass meetings with                 design of the upgrade of the Cooroy
                                                received a response from TMR to            TMR officers.                                 Noosa Road and Beckman’s Road
                                                Council's previous letters.              Finalise funding agreements for               intersection.
                                              Council’s alternate concept design         Cooroy       Noosa     Road       and       Prepare detail design drawings and
                                                has been reviewed, costed and              Beckman’s        Roads    intersection        tender documents for the Cooroy
                                                provided to TMR.                           upgrade design.                               Noosa Road and Beckman’s Roads
                                              Council has successful secured           Currently negotiating with TMR for            intersection upgrade.
                                                $600,000 in funding from TMR for           $9.5M in construction funding the           Review funding agreements for
                                                the design of the Cooroy Noosa             Cooroy Noosa Road intersection                Cooroy      Noosa     Road      and


                                                                                                                                                            Page 66 of 100

Section 67

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020



BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                           THE NEXT QUARTER
                                                 Road      and    Beckmans    Road           upgrade.                                     Beckman’s     Roads     intersection
                                                 intersection upgrade.                                                                    upgrade construction.
                                               Reviewed funding agreement for
                                                 Cooroy Noosa Road and Beckman’s
                                                 Roads intersection upgrade design.
Design decisions to be documented and          Design     decisions   are   being        Continue to document design                Develop a program of infrastructure
reported to the RPEQ or Council as               documented and reported to RPEQ.            decisions and report to RPEQ.                assessments based on level of risk.
required.                                      Standards are being included in           Continue to include standards in           Adopt process for documenting
Include standards in construction                construction drawings sets.                 construction drawings sets.                  Design decisions reporting to
drawing sets. Develop a program of
                                                                                           Continue to develop a process for            Council.
infrastructure assessments based on
                                                                                             documenting     design      decisions
level of risk e.g. traffic volumes audit
                                                                                             reporting to Council.
Assess lighting compliance risk at
roundabouts & crossings etc.
Define staff roles within Project              Staff roles have been defined within      Continue ongoing development of            Continuous improvement activities.
Management Plans and Improve                     current Project Management Plans.           tools and procedures.
awareness of previous project lessons          Lessons learnt register established       Continue     documenting   lessons
learnt summaries.                                and populated from recent projects          learnt summaries for completed
                                                 for future reference.                       projects future reference.
Provide high level corporate reporting of      Quarterly risk reporting is being         Continue to develop to report              Continuous improvement activities.
Project Risk to PCG, CWE and Council.            provided to PCG and CWE each                Quarterly risk to PCG and CWE.
                                                 quarter.
                                               Continue to refine smart sheet tool
                                                 for reporting high level corporate
                                                 reporting of Project Risk to PCG and
                                                 CWE.
Continually evolve contractor selection        Consultants / contractors are             Continue use of lessons learnt and         Continuous improvement activities.
process.                                         reviewed and scorecard developed            contractor references database for
Develop database of lessons learnt and           after project completion.                   completed projects.
contractor references.                         Lessons learnt and contractor             Continue to use consultants /
Review of consultants / contractors after        references database has been                contractors review scorecard for key
project completion.                              developed for key projects.                 projects.
North Shore Holiday Camp designed              Handover of project completed.            Defects management.                        Defects management.
and developed for sustainable tourism.         Final optimisation of bore water          Continue to manage ongoing                 Ongoing monitoring of performance
                                                 treatment and sewer systems.                revegetation works with Noosa &              and costs of water treatment and
                                               Project completed and handed over           District Landcare.                           sewer systems.
                                                 to Corporate Services - Property


                                                                                                                                                            Page 67 of 100

Section 68

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                       11 AUGUST 2020



BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                         THE NEXT QUARTER
Plan and manage a continual effort to         Project Officers are regularly             Continue to regularly engage with        Early identification of community
inform and engage the community.                engaging with the community on key           the community throughout key               engagement required for FY20/21
                                                projects.                                    projects.                                  projects.
                                              Recent projects include Cooroy             Looking    at   tools   that can         Noosa Parade upgrade community
                                                Hinterland Playground via Cooroy             standardise    the    engagement           engagement.
                                                Library and dedicated project                process.
                                                website.
                                              The IPDD section has successfully
                                                recruited an infrastructure planning
                                                officer to assist with better upfront
                                                planning        for       community
                                                engagement.
Recognise project success and promote         Infrastructure Services continues to       Continue to regularly promote good       Continue to regularly promote good
these good news stories.                        regularly promote good news                  news projects via media releases           news projects via media releases
                                                projects via media releases and              and Council's website.                     and Council's website.
                                                Council's website.                                                                    Close consultation with Council’s
                                              Recently       completed      project                                                   media team with material from
                                                promoted include Black Mountain                                                         projects such as Orealla Bridge and
                                                Road, Gympie Terrace, North Shore                                                       Hilton Terrace.
                                                Holiday     Camp     and    Peregian
                                                Amenities.
Improve processes related to transport        Backlog of outstanding CRM's is            Continue to reduce CRM’s and           Continue to reduce CRM’s and
and traffic CRMs to achieve higher level        being maintained to under 100.               regularly meet with the customer         regularly meet with the customer
of service targets.                           CRM working groups continue to aid           service team.                            service team.
                                                decision making.                           Continue to improve processes          Continue to improve processes
                                              Regular meetings are being held              related to transport and traffic         related to transport and traffic CRMs
                                                with the customer service team.              CRMs to achieve higher level of          to achieve higher level of service
                                              Improved processes and procedures            service targets.                         targets.
                                                are in place for the transport and
                                                traffic team.
Ensure all relevant interdepartmental         Continued         IPDD        section      Continue with the IPDD section           The    IPDD    section    is   well
skills and roles are represented at the         representation at regular working            representation at working group            represented    at     all    Asset
Asset Management Working Team                   group meetings.                              meetings.                                  Management      Working      group
meetings.                                                                                                                               meetings.
Review       community     engagement         Regular meetings continue to be            Continue with regular meetings with      Continuous improvement activities.
activities e.g. provision of advance            held with Community Engagement               Community Engagement (CE) and
notification & where consultation is            (CE) and a schedule of engagement            continue to develop and share
needed regarding the capital works              activities is shared with CE.                smartsheet       schedule        of

                                                                                                                                                          Page 68 of 100

Section 69

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        11 AUGUST 2020



BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            THE NEXT QUARTER
program                                    The IPDD section has successfully            engagement.
                                             recruited an infrastructure planning       Project officers are continuing to
                                             officer to assist with better upfront        inform and regularly engaging with
                                             planning         for       community         the community throughout projects
                                             engagement.                                  and this remains a focus.
                                           Project officers are continuing to
                                             inform and regularly engaging with
                                             the community throughout projects
                                             and this remains a focus.
Encourage the delivery of projects to      IPDD develops and implements               Update and adopt standard IPDD              Ongoing development of project
follow documented project management         project management plans as part of          PMP template.                                 management processes.
plans.                                       the delivery of key projects.              Project management plans are                Continuous improvement activities.
                                                                                          being followed for the IPDD sections
                                                                                          delivery of projects.
Business as Usual activities               Parking reviews are complete for           A parking review is underway for          Community engagement for the
                                             Arakoon Crescent, Sunshine Beach             Quamby Place, Noosa Heads.                  Noosa Parade corridor and parking
                                             and Pitta Street, Peregian Beach.          Continue working with Noosa                 review for Quamby Place, Noosa
                                           Design are complete for the                  Junction Association scoping a              Heads.
                                             Peregian Beach Boardwalk.                    proposed streetscape upgrade.             Continue working with Noosa
                                           Provided ongoing design support            Providing ongoing design support            Junction Association scoping a
                                             for:                                         for:                                        proposed streetscape upgrade.
                                             o Emergent slip repair projects at           o Sobraon            Street     Slope     Providing ongoing design support for:
                                                  Sunshine Beach and Sunrise                   stabilisation at Sunrise Beach          o Sobraon           Street     Slope
                                                  Beach.                                  o Noosaville        Waste     Transfer           stabilisation at Sunrise Beach.
                                             o Teewah Street and Hector                        Station.                                o Noosaville       Waste     Transfer
                                                  Street, Boreen Point and                o Tewantin Bypass - Beckman’s                    Station.
                                                  Ambulance Street, Pomona.                    Road.                                   o Tewantin Bypass - Beckman’s
                                           Delivery of Black Mountain Road              o Walking and Cycling Strategy                   Road.
                                             upgrade,       Gympie        Terrace              including sport and recreation          o Walking and Cycling Strategy
                                             Stormwater     improvements      and              plan, TMR CNLGG corridor                    including sport and recreation
                                             corridor upgrade Tewah Street and                 analysis for Tewantin to Noosa              plan, TMR CNLGG corridor
                                             Hector Street, Boreen Point and                   Heads, Noosa Heads to Marcus                analysis for Tewantin to Noosa
                                             Ambulance Street, Pomona.                         Beach, Marcus Beach to Shire                Heads, Noosa Heads to Marcus
                                           Commenced construction on Hilton                  Boundary.                                   Beach, Marcus Beach to Shire
                                             Terrace roundabout and corridor              o Planning for Noosa Drive and                   Boundary.
                                             upgrade, and design for Orealla                   Noosa Heads precincts.                  o Planning for Noosa Drive and
                                             Crescent Bridge replacement.                                                                  Noosa Heads precincts.



                                                                                                                                                          Page 69 of 100

Section 70

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020



BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                             THE NEXT QUARTER
                                                                                         Designs     are     progressing     for    Finalisation of tender documents for
                                                                                           Doonella Bridge renewal, Kin Kin             Doonella Bridge renewal, Kin Kin
                                                                                           Wahpunga Lane Bridge renewal,                Wahpunga Lane Bridge renewal,
                                                                                           Tablelands Road B Bridge renewal,            Tablelands Road B Bridge renewal,
                                                                                           Project      Avenue        stormwater        and Project Avenue stormwater
                                                                                           upgrade, Ivory Palms footpath                upgrade and Sea Eagle Drive safety
                                                                                           upgrade, Sea Eagle Drive safety              improvements.
                                                                                           improvements         and      O-Boats      Delivery of Doonella Bridge, Kin Kin
                                                                                           retaining wall.                              Wahpunga Lane Bridge and Cooran
                                                                                         Finalisation of tender documents for         tableland Road B Bridge renewal.
                                                                                           Doonella Bridge renewal, Kin Kin           Providing Planning, Design and
                                                                                           Wahpunga Lane Bridge renewal,                Delivery support for COVID 19 Grant
                                                                                           Tablelands Road B Bridge renewal,            funded projects; Shine House,
                                                                                           Peregian Beach Boardwalk, Project            Peregian Beach Boardwalk Renewal,
                                                                                           Avenue stormwater upgrade and                Noosa Heads Sunshine Beach Road
                                                                                           Sea       Eagle       Drive     safety       Pathway Lighting Upgrade, Noosa
                                                                                           improvements.                                Regional Gallery - Refurbishment of
                                                                                         Delivery     of     Hilton     Terrace       Foyer & Amenities, Renewal of
                                                                                           roundabout, corridor upgrade and             Playgrounds, Noosa waters & Lake
                                                                                           Orealla         Crescent        Bridge       Macdonald and Sunshine Beach
                                                                                           replacement.                                 Skate Park Shade Structure.
                                                                                         Providing Planning, Design and
                                                                                           Delivery support for COVID 19
                                                                                           Grant funded projects.

Transport Strategy
Plan the implementation of the key         Roll out of Schools program                 Ongoing Schools program                      Ongoing Schools program
transport strategies in the Noosa                                                        Development of financial modelling           Ongoing development of financial
Transport Strategy 2017-2027.                                                              for range of transport initiatives.            modelling for transport initiatives.
Implement approved actions from the        Report to Council on 2019/2020              Investigate Covid impacts to peak            Develop actions that meet the
Noosa Transport Strategy 2017-2027           Christmas period transport initiatives        period initiatives.                            challenges and opportunities as a
that encourage the use of alternative        identifying further 20% increase in         Investigate       opportunities for            result of Covid.
transport  and    reduce    community        Public Transport use over the                 improved walking and cycling                 Workshop with Council;
dependence on private motor vehicles.        Christmas period through use of the           uptake as a result of Covid.
                                             Noosa Styled Loop Bus.                                                                       o Covid action plan
                                                                                         Collaboration on the Walking and
                                                                                                                                          o Triggers for traffic intervention
                                                                                           Cycling Strategy projects.
                                                                                                                                        Roll out of Go Noosa App new
                                                                                         Development of cycling features as
                                                                                           part of the Go Noosa App.                      walking and cycling features.

                                                                                                                                                             Page 70 of 100

Section 71

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                          11 AUGUST 2020



BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
Trial key transport strategy initiatives.     Established working group with            Ongoing        collaboration     and     Ongoing           collaboration    and
Develop      a     memorandum          of       TransLink regarding:                        negotiation with TransLink on:                negotiation    with    Kinetic  and
understanding with TransLink and other         o Terms of MOU                              o MOU                                          TransLink to:
key stakeholders.                                                                          o Investigate potential Bus Depot             o Develop electric bus proposal
                                               o Planning for electric buses for
                                                  Noosa;                                      sites                                         including electric bus depot.
                                               o Upgrade         Noosa         Heads       o Noosa        Heads        Multimodal        o Scope Public Transport service
                                                  multimodal transport interchange;           interchange                                   improvements
                                             Public       Transport         service      o Public       Transport       service
                                                improvements                                  improvements including Woods to
                                                                                              National Park shuttle bus during
                                                                                              peak periods (Covid impacts
                                                                                              dependent)
Business as Usual Activities                   Noosa Drive walking and cycling         Collaboration with Walking and               Obtain co-funding from TransLink
                                                 pathway concept planning nearing           Cycling project and High Priority             for Noosa Drive precinct planning
                                                 completion.                                Corridor Study team on design                 (2020/21 Financial year)
                                                                                            outputs.                                    Commence early stage targeted
                                                                                         Ongoing negotiation with TransLink             stakeholder consultation and design
                                                                                            on funding for Noosa Heads
                                                                                            Multimodal Transport interchange.




                                                                                                                                                            Page 71 of 100

Section 72

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    11 AUGUST 2020


Previous Council Consideration

Nil.

Finance

Nil.

Risks & Opportunities

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Nil


Departments/Sections Consulted:

       Chief Executive Officer    Community Services                          Corporate Services
       Executive Officer          Director                                    Director
       Executive Support          Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

       Executive Services         Environment & Sustainable Development   X   Infrastructure Services
       Director                   Director                                X   Director
       Community Engagement       Building & Plumbing Services            X   Asset Management
       Customer Service           Development Assessment                  X   Buildings and Facilities
       Governance                 Economic Development                    X   Civil Operations
       People and Culture         Environmental Services                  X   Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                       Page 72 of 100

Section 73

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  11 AUGUST 2020


9                        OPERATIONAL PLAN PROGRESS REPORT - 4TH QUARTER 2019-20
DOCUMENT INFORM AT ION




Author                           Chief Executive Officer, Brett de Chastel
                                 CEO’s Office

Index                            ECM/ Subject/ Corporate Planning

Attachments                      1.   Operational Plan Progress
                                 2.   Key Performance Indicators


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 11 August 2020 providing an update on progress with the
implementation of the Operational Plan to 30 June 2020 and details of Council’s Key
Performance Indicators.


REPORT
As usual, this quarterly report is in two parts. The first part provides Council with an overview of
progress in implementing the annual Operational Plan. The second part focuses on the Key
Performance Indicators (KPIs) which are reported to Council on a quarterly basis.

To provide context about how our organisational reporting to Council works, the following graphic
is provided:




                                                                                    Page 73 of 100

Section 74

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        11 AUGUST 2020


This report relates to the final quarter of the 2019/20 financial year for the Operational Plan and
some management KPIs.
1.    OPERATIONAL PLAN UPDATE
Only the major initiatives are included in the Operational Plan with day to day “business as usual”
activities included in Branch Plans.

The Branch Plans are being used by Managers to manage day to day activities. They are an
effective tool for ensuring that all of the “business as usual” activities are undertaken and that any
minor projects are followed through. They are reported to Council by Directors on a quarterly
basis and those reports are on this round of Council meetings.

Details of each Operational Plan project is set out in Attachment 1 with an assessment of
whether the issue in completed, on track or behind schedule. Comments are also provided for
the information of Councillors about the status of each issue. It is important to note that this is
“as at 30 June” i.e. the end of the fourth quarter and in some instances, the actions have been
advanced further since that time.

There are 32 initiatives in the 2019/20 Operational Plan. The current status of those projects is:

 Status                    Quarter 1             Quarter 2            Quarter 3            Quarter 4
                       (July – Sept 2019)     (Oct – Dec 2019)    (Jan – March 2020)   (Apr – June 2020)
 Not started                   3                     3                    0                    0
 Behind Schedule               4                     3                    8                    7
 On Track                      24                    21                   18                   8
 Completed                     1                     5                    6                    17

As this report deals with the finalisation of the 2019/20 Operational Plan, details of each of the 7
initiatives that are behind schedule are set out below:

Initiatives                                  Comment
Adoption    of the Noosa River               A Stakeholder Reference Group is being developed to
Management Plan and commence                 finalise and support implementation of the Plan. A report
implementation                               outlining the proposed Terms of Reference for the Group and
                                             the next steps will be presented to Council shortly.
Commence construction of the new             This project was delayed by the appointed contractor going
Peregian Beach Community House               into liquidation requiring the works to be re-tendered. The
                                             new detailed design process is complete in preparation for
                                             re-tendering for construction.
Undertake detailed design and tender         The commencement of this project is dependent upon the
for the next stage of the Peregian Digital   finalisation of the Peregian Beach Community House which
Hub (refit of Community House)               was delayed due to the contractor going into liquidation. The
                                             initial layout, use and design options have been scoped.
Finalise Climate Change Adaptation           The draft Coastal Hazard Adaptation Plan is currently being
Plan and initiate the implementation of      prepared for Council endorsement and community
actions                                      engagement. A shire wide Climate Change Response Plan
                                             has been scoped and will be reported to Council in August.
Establish a place making team and            The establishment of the place making team has been
commence pilot project                       awaiting the finalisation of the Planning Scheme which was
                                             adopted by Council in July.
Continue implementation of Council’s         Although some work has been done in relation to this project,
Revenue Diversification Project              the project lead had been diverted to work on Council’s
                                             COVID-19 responses, budget etc.

                                                                                           Page 74 of 100

Section 75

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      11 AUGUST 2020


Initiatives                                Comment
Develop       Community   Sustainability   This project will be considered in the 2020/21 financial year
Indicators                                 when Council reviews its Corporate Plan and considers the
                                           option of developing a Community Plan.



2.    KEY PERFORMANCE INDICATORS

As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. 16 of those KPIs are reported to Council on a quarterly basis.

As far as the CEO is aware, we are one of the few councils in Queensland to make this KPI
information available to the public via “non-confidential” reports. The KPIs are included in
Attachment 2.

The key issues arising from an assessment of the KPIs are as follows:

Our People
    In relation to Workplace Health and Safety, our Lost Time Injury Duration results rose in the
      last quarter but were consistent with the same period last year.
    Personal leave overall was less than the same period last year however the proportion of
      leave taken over 5 days duration is higher, partially due to people needing to self-isolate
      due to COVID-19 symptoms.
    Accrue annual leave has increased as staff are constrained in options to travel for leave.
    Staff turnover was slightly down on the March quarter. Turnover for the 2019/20 year was
      9.6% which was 1.3% less than the 2018/19 year.

Our Customers
    The number of customer requests has reduced to average levels from the higher numbers
      seen at the peak of the Covid-19 lockdown.
    Management of our frontline phone customers continues to be of a high standard with
      average wait times continuing to be less than the same period in previous years.
    The KPIs for building information requests and plumbing applications are outside target
      levels. This is due to a combination of factors: the disruption of COVID-19, reduced
      staffing, increased volume and complexity of requests and the reduced statutory
      timeframes for plumbing applications. Measures have been implemented to improve
      matters including appointing a new plumbing inspector which will reduce the time taken to
      process applications.

Our Finances
    Our financial KPIs measure solvency, investment performance and outstanding rates. All
      of these KPIs continue to be on track and in particular, there is no change in trend for rate
      arrears.
    Council receives a financial performance report at the end of each month which provides a
      more detailed analysis of Council’s financial position. Council receives a detailed report on
      Capital Works progress every quarter.




                                                                                         Page 75 of 100

Section 76

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        11 AUGUST 2020


Our Systems and Processes
       The use of online services remains slightly above last year. The proportion of payments
         made electronically has increased particularly as cash payments have been limited due to
         the COVID-19 pandemic.

Previous Council Consideration

Quarterly reports are provided to Council outlining our progress with the Operational Plan.

Finance
The projects within the Operational Plan are reviewed and funded as part of Council’s annual
budget process.

Risks & Opportunities
A failure to achieve the outcomes set out in the Operational Plan would be problematic. In some
cases, projects may take longer than anticipated to achieve the best outcome.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

The details of each of the Operational Plan activities have been provided by relevant
Departments.

Departments/Sections Consulted:

X      Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer             Director                                    Director
X      Executive Support             Community Development                       Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

X      Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
X      Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 76 of 100

The text continues on section 77.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.