SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                           11 AUGUST 2020


Noosa River Holiday Park
                                   2019/20      2019/20
                                                           % Current          YTD
 Noosa River Holiday Park          Current         YTD
                                                             Budget       Variance
                                   Budget       Actuals
 Total Revenue                    2,206,229    1,694,740      76.82%      (511,489)
 Total Expenditure                1,500,605    1,226,027      81.70%        274,579
 Operating Surplus/(Deficit)        705,624      468,713                  (236,911)

 The site was closed to all patrons from 26 March 2020 – 11 June 2020 with the exception of
   essential travellers.
 Budgeted variable costs such as management commission and water and wastewater
   charges reduced as a result of the closure.
 The site reopened on 12 June with 35% occupancy limit and at 30 June was operating with
   an 80% occupancy limit.

Noosa North Shore Campground
                                   2019/20      2019/20
                                                           % Current          YTD
 North Shore Campground            Current         YTD
                                                             Budget       Variance
                                   Budget       Actuals
 Total Revenue                     386,328        96,725      25.04%      (289,603)
 Total Expenditure                 369,205      236,037       63.93%       133,167
 Operating Surplus/(Deficit)        17,123     (139,312)                  (156,435)

 The site was closed to all patrons from 26 March 2020 – 18 June 2020.
 Budgeted variable costs such as management commission and water charges reduced as a
   result of the closure.
 The site reopened on 19 June 2020 with a 40% occupancy limit and at 30 June 2020 was
   operating with an 80% occupancy limit.

COVID-19 REOPENING AND OPERATIONAL PLANS
Extensive consultation was undertaken with park managers and the COVID-19 Taskforce to
develop reopening and operational plans for all holiday parks during the COVID-19 pandemic.
Risk registers have been prepared for each site with a suite of control measures implemented
including the staged reopening approach to ensure the risk of COVID-19 transmission is
minimised.

Current occupancy limits are being maintained with a watching brief in place given recent
increases in reinfection rates in Victoria and NSW.

PARK OCCUPANCY PERFORMANCE
Figure 1. Occupancy (%)
                                                       Figure 1 highlights the impact of
                                                       closure or restricted operations on the
                                                       aggregate financial year occupancy
                                                       level achieved for each site. The
                                                       higher levels of occupancy at Noosa
                                                       River Holiday Park reflect the location
                                                       of the park and its popularity with
                                                       customers, whilst the lower occupancy
                                                       level at Boreen Point Campground
                                                       reflect the geographical location and
                                                       different experiential offering for
                                                       guests.

                                                                              Page 34 of 100
Log in to download the original file

2020-08-11 Services & Organisation Committee Agenda(PDF, 4MB).pdf · 4.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.