SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 11 AUGUST 2020
INFRASTRUCTURE SERVICES DEPARTMENT
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Asset Management
Finalise the Noosa Spit Shoreline The SEMP has been reported to Undertake planning for approvals Prepare for SEMP implementation
Erosion Management Plan (SEMP) and Council. proposed in the SEMP. for the 2020/2021 budget.
develop an action plan to prioritise any
recommendations arising from the
SEMP
Complete Pathways & Boardwalks and The Pathways AMP is currently in The Parks & Playgrounds AMP is Complete the final draft of the AMPs
the Parks & Playgrounds Asset draft format but still requires more behind schedule but will be drafted for adoption by Council.
Management Plans work with data information. by the end of July.
Develop pilot Lifecycle Plans for Beach No activities have commenced. No activities have commenced. The development of a standard
Accesses, Sealed Roads and template for lifecycle plans is still to
Stormwater asset classes. be completed.
Finalise lifecycle plan template and
commence development of
Lifecycle Plans.
Develop a Service/Management Plan for Continued consultation with Finalise the Hastings Street service Have the Service Plan endorsed by
Hastings Street Noosa. Hastings Street Association has management plan. Council.
seen the timeframes extended for
the service plan, as a number of
items require further development
before they can be included within
the document. This includes the
collation of maintenance plans and
activities that are specific to the
infrastructure within Hastings Street.
Asset Data Management program Buildings and Stormwater Work Order Management Asset Detail Data Reports and
revaluations have been undertaken development is currently on task. Dashboard.
and are finalising the draft report. Sealed road asset condition survey Commence new work order
has commenced. management pilot project.
Validation of road data from survey.
Business as Usual activities Development of the 2020/21 reseal Preparation of an alternative Ongoing development of the
program. 2020/21 capital works program. Technology One system to improve
Continual development of asset asset inspection practices.
working groups.
Page 60 of 100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.