Original source · versioned page text
ResponsetoApplicantReport
Attached to the e-mail MCU12/0184 Concerns about development approval Rod Ritchie.
1. Total vehicle trips including details of size of vehicles, purpose of trip, time of trip and number of trips per day. Top Forestry Rd traffic volume and dust • Current traffic estimates of around 200 vehicles/are based on no publicly available statistics. • Recent traffic counts by local residents puts the daily traffic at around 75 movements per day. • Dust from multi-wheeled heavy vehicles is much greater than for four-wheeled traffic. • Therefore broiler farm traffic will increase road dust by an amount greater than even 25%. Operational vehicle trips Appendix A indicates a maximum of 204 vehicle movements per batch cycle. This figure does not include vehicle numbers for: a) litter removal if required (MWA estimates 12 semi-trailers); b) fuel deliveries; c) increased integrated avocado production with a 33% orchard expansion. Conclusion If these basic anomalies in the traffic data provided by the applicant are any indication, then the overall quality of the response, and indeed the traffic studies to date, shows a complete lack of credibility within a framework of changing plans that make it near impossible to determine what in fact would happen with traffic issues should this application be approved.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.