Original source · versioned page text
2022-11-14 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 14 NOVEMBER 2022 5. ITEMS REFERRED FROM COMMITTEES PLANNING & ENVIRONMENT COMMITTEE 1 MCU22/0048 & OPW22/0089 – DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR COMMERCIAL LANDING AND OPERATIONAL WORKS FOR PRESCRIBED TIDAL WORKS, SITUATED AT 222 GYMPIE TERRACE NOOSAVILLE Motion Moved: Cr Stewart Seconded: Cr Lorentson That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 8 November 2022 regarding Application No. MCU22/0048 & OPW22/0089 Development Permit for Material Change of Use - Landing - Commercial & Operational Works for Prescribed Tidal Works situated at 222 Gympie Terrace Noosaville and: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 34680-01 0 Cover Page, prepared by The Jetty Specialist 14/09/2021 34680-02 0 Existing Structures Plan, prepared by The Jetty 14/09/2021 Specialist 34680-03 0 Existing Structures Plan, prepared by The Jetty 14/09/2021 Specialist 34680-04 0 New Site Plan, prepared by The Jetty Specialist 14/09/2021 34680-05 0 Vessel Mooring Site Plan, prepared by The Jetty 14/09/2021 Specialist 34680-06 0 Pontoon Layout Details, prepared by The Jetty 14/09/2021 Specialist 34680-07 0 Elevations, prepared by The Jetty Specialist 14/09/2021 34680-08 0 Pile Setout, prepared by The Jetty Specialist 14/09/2021 34680- 0 Pontoon P1B, Construction Details, prepared by The 2/11/2021 P1B-1 Jetty Specialist 34680- 0 Pontoon P1B, Foam Details, prepared by The Jetty 2/11/2021 P1B-2 Specialist 34680- 0 Pontoon P2A & P1A, Construction Details, prepared by 2/11/2021 P2A-1 The Jetty Specialist 34680- 0 Pontoon P2A – 2 Foam Details, prepared by The Jetty 2/11/2021 P2A-2 Specialist 34680- 0 Pontoon P2B Construction Details, prepared by The 2/11/2021 P2B-1 Jetty Specialist 34680- 0 Pontoon P2B – 2 Foam Details, prepared by The Jetty 2/11/2021 P2B-2 Specialist 34680- 0 Pontoon P3A-1 Construction Details, prepared by The 2/11/2021 P3A-1 Jetty Specialist Page 3 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.