2022-11-14 General Committee Meeting Minutes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                            14 NOVEMBER 2022


             Plan No.    Rev.   Plan/Document Name                                       Date
             34680-      0      Pontoon P3A Foam Details, prepared by The Jetty          2/11/2021
             P3A-2              Specialist
             34680-      0      Pontoon P3B-1 Construction Details, prepared by The      2/11/2021
             P3B-1              Jetty Specialist
             34680-      0      Pontoon P3B Foam Details, prepared by The Jetty          2/11/2021
             P3B-2              Specialist
             34680-      0      Pontoon P3C Construction Details, prepared by The        2/11/2021
             P3C-1              Jetty Specialist
             34680-      0      Pontoon P3C Foam Details, prepared by The Jetty          2/11/2021
             P3C-2              Specialist
             34680-      0      Pontoon P3D Construction Details, prepared by The        2/11/2021
             P3D-1              Jetty Specialist
             34680-      0      Pontoon P3D Foam Details, prepared by The Jetty          2/11/2021
             P3D-2              Specialist
             34680-      0      Pontoon P3E Construction Details, prepared by The        2/11/2021
             P3E-1              Jetty Specialist
             34680-      0      Pontoon P3A Foam Details, prepared by The Jetty          2/11/2021
             P3D-2              Specialist
             34680-B1-   0      Pile Bracket B1 General Arrangement, prepared by         2/11/2021
             1                  The Jetty Specialist
             34680-B1-   0      Pile Bracket B1 Corner Bracket, prepared by The Jetty    2/11/2021
             2                  Specialist
             34680-B1-   0      Pile Bracket B1 Corner Bracket 2, prepared by The        2/11/2021
             3                  Jetty Specialist
             34680-B1-   0      Pile Bracket B1 6mm Chequer Plate, prepared by The       2/11/2021
             4                  Jetty Specialist
             34680-B2-   0      Inboard Pile Bracket B2 General Arrangement,             2/11/2021
             1                  prepared by The Jetty Specialist
             34680-B2-   0      Inboard Pile Bracket B2 Exposed Bracket, prepared by     2/11/2021
             2                  The Jetty Specialist
             34680-B2-   0      Inboard Pile Bracket B2 UA Bracket, prepared by The      2/11/2021
             3                  Jetty Specialist
             34680-SJ-   0      Starter Jetty Platform 2, prepared by The Jetty          2/11/2021
             3                  Specialist
             34680-SJ-   0      Starter Jetty Headstock, prepared by The Jetty           2/11/2021
             1                  Specialist
             34680-SJ-   0      Starter Jetty Platform 1, prepared by The Jetty          2/11/2021
             2                  Specialist
             34680-      0      4m Gangway 1 Construction Detail, prepared by The        2/11/2021
             GW-1               Jetty Specialist
        Currency
        3.      This approval lapses where the construction of the jetty extension and pontoons
                have not commenced within 17 November 2028, unless application is made and
                approved by Council for an extension.
        Nature and extent of Use
        4.      All vessels, kayaks and SUPs for hire and all equipment associated with the
                marine use of the facility must wholly moored/stored within the approved lease
                area, with a maximum of 31 vessels at any one time.
        5.      All structures must be constructed wholly within the approved commercial lease
                area as per the approved plans.
        6.      All commercial activities including, the loading and unloading of passengers and
                boat docking is confined to the commercial lease areas of the respective
                commercial operation.
        Structures

                                                                                        Page 4 of 13
Log in to download the original file

2022-11-14 General Committee Meeting Minutes(PDF, 521KB).pdf · 534 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.