2022-11-14 General Committee Meeting Minutes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                         14 NOVEMBER 2022


        7.    All structures must use materials, natural finishes and colours that blend with the
              surrounding natural landscape.
        8.    Structures must be designed and constructed such that they are free standing
              within the waterway and are not connected to or behind the revetment wall or
              rock wall.
        9.    Structures must be designed and constructed such that they do not place
              additional vertical or lateral loads onto the existing revetment wall that may
              compromise the long term stability and/or durability of the wall. Upon completion
              of works, a certification by RPEQ must be provided to Council in this regard.
        10.   All structures must have no detrimental effects on stormwater drains and/or
              easements.
        11.   No boatlifting devices are to be attached or moored at the structures for the
              purpose of elevating a vessel above the water without Council approval.
        12.   The jetty and deck areas must be constructed in a manner to render the
              underside area vermin proof.
        13.   There must be no electrical reticulation system carrying electricity in excess of
              24 volts beyond the revetment wall unless all switches and power outlets are
              positioned above the 1% AEP flood level.
        14.   Lighting associated with the use must be designed, installed, operated, and
              maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
              Effects of Outdoor Lighting.
        15.   Wastewater and sullage must only be disposed of at approved pump out facilities.
        16.   The mooring facility must not be utilised for live-aboard purposes.
        17.   Any construction and post construction activity must not to impact on the
              condition of the waterway and is to be conducted so as not to breach the
              Environmental Protection Act EPA (1994) and the Environmental Protection
              (Water) Policy 2009.
        18.   Certification by a Registered Professional Engineer of Queensland that states
              that the jetty extension and pontoons are constructed in accordance with best
              practice methods and are structurally sound must be submitted to Council. This
              certification must be submitted to Council within three (3) months of the
              completion of the works. A final inspection and approval of the structure by
              Council’s Inspector is also required. Please contact Council’s Planning
              Assessment Section to arrange the inspection.
        19.   After completion, the proposed works must be maintained in a sound state of
              repair in accordance with the approved plans.
        20.   All necessary State government approvals relating to this development must be
              obtained prior to any works commencing on the site.
        Environment
        21.   To ensure the safety of persons accessing the approved works and to prevent
              environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
              associate pipework, valves, vents and systems shall be conducted by a suitably
              qualified professional and submitted to Council for approval prior to the use of
              the new works (pontoon/jetty extensions). The audit shall demonstrate that the
              fuel systems are in a safe and serviceable condition or, where necessary, identify
              repair and rectification requirements to meet the relevant Australian Standards
              and industry best practice environmental management. Any repair works must
              be completed, with certification submitted by the auditor to Council, prior to the
              use of the new works (pontoon/jetty extensions).
                                                                                    Page 5 of 13
Log in to download the original file

2022-11-14 General Committee Meeting Minutes(PDF, 521KB).pdf · 534 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.