Skip to the record
Every meeting, every word.

Original source · versioned page text

2022-11-14 General Committee Meeting Minutes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                             14 NOVEMBER 2022


             Plan No.    Rev.   Plan/Document Name                                      Date
             1                  Specialist
             34680-SJ-   0      Starter Jetty Platform 1, prepared by The Jetty         2/11/2021
             2                  Specialist
             34680-      0      4m Gangway 1 Construction Detail, prepared by The       2/11/2021
             GW-1               Jetty Specialist
        Certification of piles condition
        3.      The installation of the piles must be supervised by a licensed cadastral surveyor.
                Certification of the location of the installed piles prepared by a licensed cadastral
                surveyor must be provided to Council.
                The certification must:
                a.    state that the location of the piles is in accordance with the approved plans,
                      and
                b.    be submitted to Council prior to the installation/construction of any other
                      elements of the approved works
        Currency
        3.4. This approval lapses where the construction of the jetty extension and pontoons
             have not commenced within 17 November 2028, unless application is made and
             approved by Council for an extension.
        Nature and extent of Use
        4.5. All vessels, kayaks and SUPs for hire and all equipment associated with the
             marine use of the facility must wholly moored/stored within the approved lease
             area, with a maximum of 31 vessels at any one time.
        5.6. All structures must be constructed wholly within the approved commercial lease
             area as per the approved plans.
        6.7. All commercial activities including, the loading and unloading of passengers and
             boat docking is confined to the commercial lease areas of the respective
             commercial operation.
        Structures
        7.8. All structures must use materials, natural finishes and colours that blend with the
             surrounding natural landscape.
        8.9. Structures must be designed and constructed such that they are free standing
             within the waterway and are not connected to or behind the revetment wall or
             rock wall.
        9.10. Structures must be designed and constructed such that they do not place
              additional vertical or lateral loads onto the existing revetment wall that may
              compromise the long term stability and/or durability of the wall. Upon completion
              of works, a certification by RPEQ must be provided to Council in this regard.
        10.11.   All structures must have no detrimental effects on stormwater drains and/or
             easements.
        11.12.   No boatlifting devices are to be attached or moored at the structures for the
             purpose of elevating a vessel above the water without Council approval.
        12.13.   The jetty and deck areas must be constructed in a manner to render the
             underside area vermin proof.
        13.14.    There must be no electrical reticulation system carrying electricity in excess
             of 24 volts beyond the revetment wall unless all switches and power outlets are
             positioned above the 1% AEP flood level.

                                                                                      Page 8 of 13
Log in to download the original file

2022-11-14 General Committee Meeting Minutes(PDF, 521KB).pdf · 534 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.