2022-11-14 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 14 NOVEMBER 2022
14.15. Lighting associated with the use must be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
Effects of Outdoor Lighting.
15.16. Wastewater and sullage must only be disposed of at approved pump out
facilities.
16.17. The mooring facility must not be utilised for live-aboard purposes.
17.18. Any construction and post construction activity must not to impact on the
condition of the waterway and is to be conducted so as not to breach the
Environmental Protection Act EPA (1994) and the Environmental Protection
(Water) Policy 2009.
18.19. Certification by a Registered Professional Engineer of Queensland that
states that the jetty extension and pontoons are constructed in accordance with
best practice methods and are structurally sound must be submitted to Council.
This certification must be submitted to Council within three (3) months of the
completion of the works. A final inspection and approval of the structure by
Council’s Inspector is also required. Please contact Council’s Planning
Assessment Section to arrange the inspection.
19.20. After completion, the proposed works must be maintained in a sound state
of repair in accordance with the approved plans.
20.21. All necessary State government approvals relating to this development must
be obtained prior to any works commencing on the site.
Environment
21.22. To ensure the safety of persons accessing the approved works and to
prevent environmental harm, a safety audit of the on-site fuel storage tanks,
bowsers and associate pipework, valves, vents and systems shall be conducted
by a suitably qualified professional and submitted to Council for approval prior to
the use of the new works (pontoon/jetty extensions). The audit shall demonstrate
that the fuel systems are in a safe and serviceable condition or, where necessary,
identify repair and rectification requirements to meet the relevant Australian
Standards and industry best practice environmental management. Any repair
works must be completed, with certification submitted by the auditor to Council,
prior to the use of the new works (pontoon/jetty extensions).
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REASONS TO JUSTIFY THE DECISION DESPITE THE CONFLICT WITH THE
PLANNING SCHEME:
Find the following matters relevant to the assessment and sufficient reason to approve the
application:
1. Although there is a proposed net increase of pontoons which increases site cover
within the lease area, the proposal:
a. will ensure the vessels are moored wholly within the existing lease area of the
marine facility; and
b. maintains the character of the site as a marine facility which is compatible with
surrounding marine activities.
For: Crs Stockwell, Stewart, Finzel, Lorentson, Wilkie and Jurisevic
Against: Cr Wegener
Carried.
Page 9 of 13