NOOSA COUNCIL IDAS Development Application Decision Notice                                                  6 of 10


Erosion and Sediment Control
41.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
42.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

          Contribution Required For:                                                          Amount:

          PSP12 – Public Open Space Contributions (Park)                                      $2,974
          PSP16 – Sewerage Headworks Contributions                                            $7,314
          PSP17 – Water Supply Headworks Contributions                                        $4,633
          PSP20 – Pathway Trunk Network Contributions                                         $669
          TOTAL Contribution Amount =                                                         $15,590
          Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
          from June 2007 until the date of payment.
       All contributions must be paid prior to the issue of a Development Permit for Operational Works

General
43.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

44.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

45.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
46.    The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
       Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
       external imperviously paved area correctly sized for all refuse and recycling containers and suitably
       screened from public places and neighbouring properties. (The applicant must notify Council if there is no
       safe & suitable kerbside bin pick up location.)

47.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
       shall comply with the following requirement:

       47.1. The equipment shall be installed and located in a manner that prevents excessive noise in
             accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
             spot fines) may apply for offences.

       47.2. A person must not use equipment on any day if it makes or causes noise to be made:

               47.2.1.    From 10pm to 7am: More than the lower of either –
                               40 dB(A)
                               3 dB(A) above the background noise level
               47.2.2.    From 7am to 7pm: More than the lower of either –
                               50 dB(A)
                               5 dB(A) above the background noise level
               47.2.3.    From 7pm to 10pm: More than 3 dB(A) above the background noise level.

               47.2.4.    Pool pumps must not be audible at an effected premises between 10pm-7am




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40072611\@[email protected]

Used in these records

About this file

File size
48 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001010.001 [As Published].pdf · 48 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.