NOOSA COUNCIL IDAS Development Application Decision Notice                                                  5 of 10


28.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
      drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
      system in Kingfisher Drive. The maximum discharge of stormwater drainage allowable to Council’s kerb &
      channel street drainage system at any one location is 25 litres/second.

29.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
30.   The site shall be connected to Council’s existing sewerage reticulation system located in the road reserve
      at the front of the site and be constructed in accordance with Council’s standards and requirements at no
      cost to Council.
Town Water Supply
31.   The site shall be connected to Council’s existing town water supply and be constructed in accordance with
      Council’s standards and requirements at no cost to Council.

32.   Each individual water connection to the water reticulation system shall extend to the property boundary
      and be metered. All fees for the supply of water meters shall be paid to the Council.

33.   All water meters must be located outside the property boundary and in an easily assessable location to
      facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
      fences or locked gates. In this regard approval of the water meter configuration and location must be
      obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
      hydraulic drawings.
Earthworks& Site Stability
34.   Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
      Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
      or the blockage of, or interference with, any natural watercourses.

35.   Excavation of the site and the construction of the proposed works shall not have any adverse affects on
      the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a suitably
      qualified Registered Professional Engineer of Queensland (RPEQ) shall supervise the excavation of the
      site and the construction of the new works to determine whether any additional measures are required to
      protect the stability of adjoining buildings and/or structures and/or services and/or lands.

36.   Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that
      border the development site. Fences that are affected shall be replaced prior to the Building Certifier
      issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on
      the plans submitted for Operational Works approval.

37.   Earthworks required on site shall be undertaken without the use of vibratory equipment and in a manner
      that does not compromise the stability of the site or adversely impact on the adjoining buildings and/or
      structures and/or lands.

38.   An existing Conditions Survey shall be carried out on adjoining structures and buildings prior to any
      construction works taking place on site. If distress already exists, a photographic survey shall be
      undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
      copy of this report is to be submitted to Council prior to the issue of operational works approval.

39.   Certification of the completed works must be provided to Council by the supervising engineer. The
      certification shall state that the completed works conform with all aspects of the design and that the
      completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
      and/or services and/or lands.
Acid Sulfate Soils
40.   As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of
           3
      100m or greater which extends below 5m AHD will need to be carried out in accordance with State
      Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard
      appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be
      submitted to Council for approval prior to obtaining a Development Permit for Operational Works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40072611\@[email protected]

Used in these records

About this file

File size
48 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001010.001 [As Published].pdf · 48 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.