                                                                                                                          Bushfire Hazard Assessment and Management Plan



                                          Table 7: Assessment against the Noosa Plan 2020 – Bushfire Hazard Overlay Code.


           Performance Outcomes                                       Acceptable Outcomes                                            Compliance Assessment

Safety of people and property
         Development maintains the safety of                Development which will materially increase the number of
         people and property from the adverse               people living or congregating on premises, including           COMPLIES WITH PO1
         impacts of bushfire.                       AO1.1   reconfiguring a lot, is not located within a medium or high
                                                            bushfire hazard area.                                          The proposed new building will have an
                                                                                                                           appropriate setback for a vulnerable use, not
 PO1                                                        Development maximises setbacks from hazardous                  being exposed to greater than 10kW/m2 of
                                                            vegetation to achieve an acceptable risk.                      radiant heat.
                                                    AO1.2
                                                            Editor’s Note — PSP8 Natural Hazards provides
                                                            guidance for assessing bushfire hazard risk and
                                                            preparing a bushfire hazard management plan.
Impacts on Ecologically Important Areas
         Bushfire mitigation measures do not                No acceptable outcome provided
         adversely impact on:                                                                                              COMPLIES WITH PO2

         a. biodiversity values, connectivity and                                                                          The development footprint will result in the
         ecosystem functioning; and                                                                                        removal of a small number if native trees. The
         b. the long term physical integrity of                                                                            proposed APZ does not require any additional
 PO2     waterways, wetland and areas of native                                                                            native vegetation clearing. Therefore, the
         vegetation.                                                                                                       proposal will have minimal impacts on
                                                                                                                           biodiversity values, connectivity and ecosystem
                                                                                                                           functioning. The proposal will also not impact on
                                                                                                                           the long term physical of waterways, wetlands or
                                                                                                                           areas of mapped native vegetation
Water Supply for Fire Fighting Purposes
         Development provides an adequate                   Premises are connected to the reticulated water supply.
         water supply for fire fighting purpose                                                                            COMPLIES WITH AO3.2
         which is reliable, safely located and              Editor's note—For reconfiguring a lot, water supply needs
         freely accessible.                         AO3.1   to provide for a minimum flow and pressure of 10 litres a      The proposed dwelling will have the required
 PO3                                                        second at 200kPa at all times for fire fighting purposes.      minimum level of stored, dedicated, on-site
                                                                                                                           water supply for fire-fighting purposes. The site
                                                            OR                                                             has access to a 48,000-litre drinking water
                                                    AO3.2   Where there is no available reticulated water supply, the      supply and an additional two (2) 5,000 litre water




                                                                                                              PR22428_BHAMP_199 Beddington Road, Doonan                Page 27
Log in to download the original file

7. Attachment F - Bushfire Hazard Assessment.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.