Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

7. Attachment F - Bushfire Hazard Assessment

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                         Bushfire Hazard Assessment and Management Plan



                                                            premises has:                                                  tanks used for gardens, and a 50,000-litre
                                                                                                                           swimming pool.
                                                            a.      an accessible dam, swimming pool or water tank
                                                            available for fire fighting purposes with an onsite water
                                                            volume of not less than 5,000 litres; and
                                                            a.      a water supply outlet pipe 50 millimetres in
                                                            diameter fitted with a standard fire brigade fitting
                                                            connected to the water supply (other than where the
                                                            water supply is in a swimming pool or dam).

                                                            Editor’s Note—Water supply capacity for fire fighting
                                                            purposes is in addition to water supply capacity for other
                                                            uses and activities on the premises.
Essential Community Infrastructure
         Essential community infrastructure is              Development involving essential community infrastructure
         able to function effectively during and            is not located within a medium or high bushfire hazard   Not applicable – the development does not
         immediately after bushfire events.                 area.                                                    constitute essential community infrastructure
                                                    AO4.1
                                                            OR

                                                            Where located in a medium or high bushfire hazard area,
 PO4                                                        development involving essential community infrastructure
                                                            is designed to function effectively during and after a
                                                            bushfire event in accordance with a Bushfire Hazard
                                                    AO4.2   Management Plan.

                                                            Editor’s Note— PSP8 Natural Hazards provides guidance
                                                            for assessing bushfire hazard risk and preparing a
                                                            bushfire hazard management plan.
Hazardous Materials
         Public safety and the environment are              Hazardous materials are not manufactured or stored in
         not adversely affected by the impacts of           bulk in a bushfire hazard area.                              Not applicable - The development will not store on
 PO5                                                AO5
         bushfire on hazardous materials                                                                                 manufacture hazardous materials.
         manufacturing or storing in bulk.
Access and Evacuation Routes
         Roads provide for easy and safe                    The road layout provides for through-roads and avoids
         evacuation of residents of premises and            cul-de-sacs and dead-end roads.                                COMPLIES WITH PO6
 PO6                                                AO6.1
         access by emergency services.
                                                            OR



                                                                                                             PR22428_BHAMP_199 Beddington Road, Doonan             Page 28
Log in to download the original file

7. Attachment F - Bushfire Hazard Assessment.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.