Plans and drawings: the text below has words only, no drawings.
Bligh Tanner Consulting Engineers Page 5 Noosa Flexi Learning Centre Stormwater Management Plan August 2012 2 DESIGN OBJECTIVES This chapter outlines the relevant stormwater management design objectives for site. 2.1 Stormwater Treatment Objectives Stormwater quality is to be managed in accordance with the Noosa Plan Water Sensitive Urban Design Code (Table 14-61). Table 3 How the proposal responds to the Noosa Plan Specific Outcome Probable Solutions Proposed Approach Water reuse S1.1 Development complies Minimise ground-level O1 Development uses a with the water quality standards impervious areas (i.e. slab on combination of detention and in Table 2 of the SEQ Regional ground construction) to less retention systems to capture Plan Implementation Guideline than 25% of the site area. run-off from areas on the site; No. 7 for Water Sensitive Urban AND Design; Capture and manage the first 10 O2 Water storage devices must S2.1 No solution provided mm of runoff from impervious have sufficient capacity having S3.1 Captured water is plumbed areas, including: regard to local rainfall pattern to be available for all external • capturing roofwater for non- and the catchment area of roof uses including gardening, potable uses or other hard standing surface; irrigation, ponds, filling • infiltrating excess water into AND swimming pools and outdoor O3 Captured water is utilised for cleaning, as well as all ground the soils to preserve the all non-potable uses on site; floor toilet cisterns and washing regional hydrology. AND machine cold taps; O4 On-site detention does not S3.2 Where the captured water adversely impact on water is used for toilet flushing and/or requirements downstream of the laundry use, an automatic or site where the water is required manual interchange device that to sustain the ecology and allows alternate use of captured hydrology of downstream water or the reticulated water systems (environmental flows); supply is installed to ensure that AND there is a continual supply of O5 Within the Shire Business water for sanitary flushing and Centre site, as shown on Map laundry use. SBC, on-site detention S4.1 No solution provided measures are contained within S5.1 No solution provided the developed areas of the site, clear of drainage lines and Open Space Precincts. Run-off treatment S6.1 & S7.1 Development Capture and manage first 10 O6 Run-off that leaves the site complies with the water quality mm of runoff from impervious is treated so as not to adversely standards in Table 2 of the SEQ surfaces as per Table 2 of the impact on the ecology and Regional Plan Implementation SEQ Regional Plan hydrology of downstream Guideline No. 7 for Water Implementation Guideline No. 7 environmental flows; Sensitive Urban Design. for Water Sensitive Urban AND Design O7 Within the Shire Business Centre site, as shown on Map SBC— a) run-off treatment occurs within the site ; and b) drainage lines are only used for final polishing of run-off. Town water supply S8.1 A suitable backflow connections prevention device is installed to O8 Backflow devices or similar protect the potable water within
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.