Bligh Tanner Consulting Engineers                                                                            Page 5
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012




2 DESIGN OBJECTIVES
This chapter outlines the relevant stormwater management design objectives for site.


2.1 Stormwater Treatment Objectives
Stormwater quality is to be managed in accordance with the Noosa Plan Water Sensitive
Urban Design Code (Table 14-61).

Table 3 How the proposal responds to the Noosa Plan
Specific Outcome                       Probable Solutions                   Proposed Approach
Water reuse                            S1.1 Development complies            Minimise ground-level
O1 Development uses a                  with the water quality standards     impervious areas (i.e. slab on
combination of detention and           in Table 2 of the SEQ Regional       ground construction) to less
retention systems to capture           Plan Implementation Guideline        than 25% of the site area.
run-off from areas on the site;        No. 7 for Water Sensitive Urban
AND                                    Design;                              Capture and manage the first 10
O2 Water storage devices must          S2.1 No solution provided            mm of runoff from impervious
have sufficient capacity having        S3.1 Captured water is plumbed       areas, including:
regard to local rainfall pattern       to be available for all external     • capturing roofwater for non-
and the catchment area of roof         uses including gardening,               potable uses
or other hard standing surface;        irrigation, ponds, filling           • infiltrating excess water into
AND                                    swimming pools and outdoor
O3 Captured water is utilised for      cleaning, as well as all ground         the soils to preserve the
all non-potable uses on site;          floor toilet cisterns and washing       regional hydrology.
AND                                    machine cold taps;
O4 On-site detention does not          S3.2 Where the captured water
adversely impact on water              is used for toilet flushing and/or
requirements downstream of the         laundry use, an automatic or
site where the water is required       manual interchange device that
to sustain the ecology and             allows alternate use of captured
hydrology of downstream                water or the reticulated water
systems (environmental flows);         supply is installed to ensure that
AND                                    there is a continual supply of
O5 Within the Shire Business           water for sanitary flushing and
Centre site, as shown on Map           laundry use.
SBC, on-site detention                 S4.1 No solution provided
measures are contained within          S5.1 No solution provided
the developed areas of the site,
clear of drainage lines and
Open Space Precincts.
Run-off treatment                      S6.1 & S7.1 Development              Capture and manage first 10
O6 Run-off that leaves the site        complies with the water quality      mm of runoff from impervious
is treated so as not to adversely      standards in Table 2 of the SEQ      surfaces as per Table 2 of the
impact on the ecology and              Regional Plan Implementation         SEQ Regional Plan
hydrology of downstream                Guideline No. 7 for Water            Implementation Guideline No. 7
environmental flows;                   Sensitive Urban Design.              for Water Sensitive Urban
AND                                                                         Design
O7 Within the Shire Business
Centre site, as shown on Map
SBC—
a) run-off treatment occurs
within the site ; and b) drainage
lines are only used for final
polishing of run-off.

Town water supply                      S8.1 A suitable backflow
connections                            prevention device is installed to
O8 Backflow devices or similar         protect the potable water within

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.