Skip to the record
Accept no imitations.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                                  Page 8
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012




3 STRATEGY DESCRIPTION AND PLAN
The overall intent of the stormwater strategy is to mimic the natural hydrology of the site by
minimising the level of disturbance to the existing ground conditions.

Key features of the strategy include:
   1. Maintaining ground-level permeability across 90% of the site:
            a. Only 3% of the site (177 m²) will be slab-on-ground construction (for the Music
                 building (due to soundproofing needs) and part of the Create building (due to
                 the raised ground levels in that area). The majority of structures will be built on
                 raised piers (consistent with a Noosa beach-house feel) to largely preserve
                 ground level infiltration characteristics. The pier-construction technique will
                 preserve large areas of shallow tree roots, which will assist in maintaining the
                 natural infiltration rate of the soils and retaining natural biological nutrient
                 removal capacity.
            b. 7% of the site is carpark, and this will use permeable pavement to reduce
                 runoff from small rainfall events.
   2. 68% of the site free is free of structures (buildings/carparks) which will minimise
       change to pollutant generation or infiltration properties. This area includes significant
       retention of existing vegetation, as well as revegetation with existing species.
   3. Roof runoff will be captured in rainwater tanks that are designed to suit the non-
       potable water demands at the Flexi-Learning Centre. 25% of the site is covered in
       roofs and about 60% of roof areas will drain to rainwater tanks, and about 60% of this
       water is able to be reused. The overflow from these tanks will be diverted to
       infiltration trenches. The balance of roof areas will drain directly infiltration trenches,
       rather to via rainwater tanks, because the relatively low non-potable water demands
       at the Centre do not justify harvesting water from every roof.
   4. The mean annual volume of surface runoff leaving the site is expected to be about
       20% less than existing levels (due to rainwater harvesting and infiltration).
   5. Runoff from the site will enter the stormwater drainage system along Girraween Crt,
       which drains through an existing bioretention/infiltration system at the end of the court
       before reaching the Noosa National Park/Girraween Nature Reserve and Burgess
       Creek. Whilst this existing bioretention system is not specifically needed to treat
       runoff from the site (and probably isn’t designed to do so), it does provide an
       additional layer of protection to the receiving environment (given the nature of the
       intended use, there are unlikely to be any activities on the site that would generate
       atypical pollutant loads).
   6. The small increase in impervious areas means there is only a small increase in peak
       flows under major storm conditions. The very small amount of flood detention
       required (about 1 m3) will be easily accommodated within the site design at the
       detailed design stage (as part of infiltration systems, additional landscape
       depressions or additional airspace in rainwater tanks).
   7. Overland flow paths will be similar to existing conditions, and under major storm
       events water will sheet flow across the south-western boundary of the site on to
       Girraween Crt and then flow west towards Burgess Creek.

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.