Bligh Tanner Consulting Engineers                                                             Page 7
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



The most appropriate acceptable solution for this site is to have rainwater tanks, sized at
1500L per required pedestal (Acceptable Solution A3), which is connected to each required
pedestal, external use, and washing machine cold water taps (Acceptable Solution A2).


2.4 Construction Phase Objectives
Stormwater run-off from land development and infrastructure development sites has a high
potential to cause water contamination and/or environmental harm. This is regulated under
the EP Act 1994.

Under S440ZG it is an offence to unlawfully deposit a prescribed water contaminant to
waters. Prescribed contaminants are listed in Schedule 9 of the Environmental Protection
Regulation 2008 (EP Reg), and include: ashes, clay, gravel, sediment, stones and similar
organic or inorganic matter, as well as building and construction materials and waste.

Under S 319 persons in Queensland carrying out activities which may cause environmental
harm must comply with the ’general environmental duty’ (GED). This requires that all
reasonable and practicable measures must be adopted to prevent and minimise
environmental harm. Although not being able to demonstrate compliance against GED is not
an offence, demonstrating that all reasonable and practicable measures have been adopted
is a defence for offences such as water contamination. For instance, under chapter 10,
s493A of the EP Act, where a person deposits a prescribed water contaminant to waters or
causes unlawful environmental harm, it is a defence to demonstrate compliance with the
GED. Demonstrating that all reasonable and practicable measures have been conceived and
implemented should encompass:
    • thorough and ongoing site assessments
    • consideration of, and adaptation for site specific erosion risk factors including
        topography, soil type, climate and season
    • design, installation, operation, management, maintenance and monitoring of control
        measures as identified in the erosion and sediment control plan.

Erosion Hazard Assessment
This site is considered low risk based on the following erosion hazard assessment:
   • Predicted Annual Soil loss (tonnes) = A x B x T
   • Where A = R.K.LS.C.P (as per the Revised Universal Soil Loss Equation).

Table 4 Values used in erosion hazard estimation
Factor    Description                  Adopted value
R         Rainfall erosivity factor    5700 (i 2y 6hr = 15.8 mm/hr)
K         Soil erodibility factor      0.04 (loam)
LS        Topographic factor           0.2 (100 m @ 1%)
C         Cover and management         1 (no cover)
P         Practice                     1.3 (no management)
B         Area of disturbance          0.5 ha
T         Predicted duration           0.5 yrs

Predicted unmitigated soil loss = 59 t/ha/yr x 0.5 ha x 0.5 yrs = 15 tonnes

As this is significantly less than 150 tonnes, this development is considered low risk,
and accordingly a minor erosion and sediment control plan will be provided as part of
the operational works application, as per Sunshine Coast Regional Council’s Manual
for Erosion and Sediment Control V1.2 (Nov 2008).

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.