Bligh Tanner Consulting Engineers Page 12
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
Figure 3 MUSIC model schematic
10000
1000 Existing
Conventional commercial
100 development
Conventional commercial with
best practice bioretention
10
Noosa Flexi
1 Noosa Flexi with tanks
Noosa Flexi with tanks +
0.1 infiltration
Flow (ML/yr) Total Total Total
Suspended Phosphorus Nitrogen
Solids (kg/yr) (kg/yr) (kg/yr)
Figure 4: Comparison of runoff volumes and pollutant loads, which shows that the mitigated
pollutant loads are close to existing levels and well below a conventional ‘best-practice’
approach (note logarithmic scale). Actual values are presented in Table 6.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.