Council archive · source document
Appendix E - Stormwater Management Plan · MCU12/0133
From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.
Plans and drawings: the text below has words only, no drawings.
Bligh Tanner Consulting Engineers Page 13
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
Table 6: Comparison of runoff volumes and pollutant loads
Conventional Noosa
commercial Flexi Noosa Flexi
Conventional with best Noosa School School with
commercial practice* Flexi with tanks +
Existing development bioretention School tanks infiltration
Flow (ML/yr) 2.9 7.8 7.6 4.6 3.9 2.0
Total Suspended Solids (kg/yr) 160 1300 270 330 300 150
Total Phosphorus (kg/yr) 0.19 3.0 1.2 0.8 0.65 0.22
Total Nitrogen (kg/yr) 2.1 25 14 7.3 5.5 1.9
* sized to reduce pollutant loads by 80% (TSS) 60% (TP) and 45% (TN)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.