Log in to see the plans as drawnNoosa Landfill RRA Flood Assessment
4 VALIDATION
Validation of peak flows at the proposed RRA fill site has been carried out against a Rational
Method peak flow calculation. Details of the Rational Method calculation are provided in Appendix
A. The peak flow comparison shown below demonstrates a good level of agreement between the
TUFLOW results and the Rational Method.
Table 4-1 Peak Flow Validation at Northern Boundary of the Landfill Site
Rational Method Peak Flow (1% AEP) 12.8 m3/s
TUFLOW Peak Flow (1% AEP)
(Critical Duration of 30 minutes) 14.0 m3/s
Difference + 9.4%
J00352R1V2 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.