Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Changes Application - MCU15/0023.02

of 53

Text shows just the words. Original shows the document exactly as it was published.

Very large file (15.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Project No. 112-14608
January, 2013            REF: 1-14608,2013-01-15,       BR VER O.                                                           Page 7


      TABLE 1                       SUBSURFACE PROFILE
             Test             Sand Fill (m)                              Natural Sand (m)                              Tennination
           Location                                                                                                     Depth (m)
                                                    Loose             Medium             Dense          Very Dense
                                                                       Dense
              BHl               0.00-1.10             NE             1.10-7.50        7.50-10.90         10.90-14.30      29.00
                                                                    16.90-20.40       14.30-16.90         20.40-TO
              BH2               0.00-2.20          2.20-4.00         4.00-9.50          9.50-TO               NE          11.50
             DCP1                   NE           0.00-1.103}         1.10-3.70          3.70-TO               NE           5.40
             DCP2                   NE           0.00-1.30 3}        1.30-3.30          3.30-TO               NE           5.10
             DCP3                   NE           O.OO-l.UU3}         1.00-2.60          2.60-TO               NE           ~AO
             DCP4                   NE           0.00-0.603}         0.60-2.50          2.50-TO               NE           4.00
         Notes:~
                    1)     NE - Not Encountered; TO - Termination Depth.
                    2)     All deplhs in metres below the existing ground surface at time of the investigation.
                    3)     Possible Fill.




   3.3      Groundwater

      Groundwater was not encountered in the boreholes at the time of the investigation.
      Seepage through the upper sandy soils could be expected following periods of prolonged
      rainfall, although this would be a transient condition.




                                                                                  ;;.. SOIL SURVEYS ENGINEERING

Used in these records

About this file

File size
15.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Changes Application - MCU15_0023.02.pdf · 15.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.