Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

RFI - S25-054 Revised Concept Issue 18.06.2025 updated

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (34.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                               SCALE 1 : 20




                                                                                                                                                                                                                                                                                                                                                                                                                       FOOTING DEPTH
                                                                                                                                                                                                                                                                                                                                                                       TWO LAYER 10
                                                                                                                                                                                                                                                                                                                                                                       ABLEFLEX AROUND PIPE
                                                                                                                                                                                                  SIZE & SPACING TO                      TWO LAYER 10 ABLEFLEX




                                                                                                                                                                                                                                                                                                                                                                                                                             'D'
                                                                                                                                                                                                  MATCH BEAM BOTTOM                      AROUND PIPE                                                                                               N12-300                  N12-300
                                                                                                                                                                           300 COG                                                                                                                                                                 U-BARS                   U-BARS
                                                                                                                                                                                                  REINFORCEMENT
                                                                                                                                                                                                                                                 PIPE PENETRATION                                                                                                                             PIPE PENETRATION




                                                                                                                                                                                                                                                                                                                                                                                CLEAR
                                                                                                                                                                                                                                       75 MIN.




                                                                                                                                                                                                                                                                                                                                                                                  50
                                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                                 1/N12 PER
                                                                                                                                                                                                                                                                                              1
                                                                                                                                                                                                                                                                 FOOTING BAR EXTRA REINFORCEMENT




                                                                                                                                                                                                                     MIN.
                                                                                                                                                                                                                      75
                                                                                                                                                     FOOTING                                                                                  ENSURE CLEAR COVER FROM
                                                                                                                                                                                                500 LAP                                                                      TO MATCH BTM FOOTING                                                 600 LAP                       600 LAP
                   REFER FOUNDATION PLAN                                                                                                         TRENCH MESH                                                                                  PIPE AND REINFORCEMENT         REINFORCEMENT
                                                                                                                                                     OR BARS.                                                    VARIES
                   FOR FOOTING DETAILS
                                                                                                                                                                                             2xLAP + 2x75 PIPE CLEARANCE + PIPE DIAMETER
                                                                                                                                                                                                                                                                                                                                                  PIPE THROUGH TOP OF FOOTING
                                                                                                                                                                                           PIPE THROUGH MIDDLE OF FOOTING
                                                                                                                                                                                            (FOOTINGS WITH TRENCH MESH OR N12 BARS)




                                                                                                                                                                                                                                                                                                     FOOTING DEPTH




                                                                                                                                                                                                                                                                                                                                                                                                                     FOOTING DEPTH
                                                                                                                                                                                                                                TWO LAYER 10
                   PILES TO ENGINEERS DESIGN                                                                                                                                                                                    ABLEFLEX AROUND PIPE




                                                                                                                                                                                                                                                                                                           'D'




                                                                                                                                                                                                                                                                                                                                                                                                                           'D'
                                                                                                                                                                                                   N12-300                           N12-300
                                                                                                                                                                                                   U-BARS                            U-BARS                                                                                                                                             PIER FOOTING DOWN TO
                                                          1                                                                                                                                                                                                       PIPE PENETRATION                                                                                                      BOTTOM OF PIPE TRENCH
                                                      1


                                                                                   OF INFLUENCE
                                                                                   BELOW ZONE
                                                                                      500 MIN.


                                                                                        LINE
                                                                                                                                                                       1




                                                                                                                                                                                                                                                                                                                                                                        CLEAR
                   SERVICE PIPE LOCATIONS                                                                                                                         1




                                                                                                                                                                                                                                                                                                                                                                          50
                                                                                                                                                                                                                                                                                                                          1
                   TO BE DETERMINED BY                                                                                                           EXTRA REINFORCEMENT
                                                                                                                                                 TO MATCH BTM FOOTING                                                                                                                                                          1
                   BUILDER PRIOR TO                                                                                                                                                           600 LAP                                       600 LAP
                                               1000




                   CONSTRUCTION                                                                                                                  REINFORCEMENT
                                                                                                                                                                                                                                                                                                                                             600                                    600


                                     1000
                                                                                                                                                                                          PIPE THROUGH BOTTOM OF FOOTING                                                                                                                            PIPE UNDER FOOTING
                                                                                                                                                                                            NOT APPLICABLE TO FOOTING BEAMS (FB) OF
                                                                 ZONE OF INFLUENCE LINE                                                                                                             SUSPENDED SLAB BEAMS
                                                                                                                                                                                                                                                                                                                                                  NOTE:
                                                                                                                                                                                                                                                                                                                                                  ALL SERVICES TRENCHES SHALL FALL AWAY
                                                                 BASE OF TRENCH                                                                                                                                                                                                                                                                   FROM THE BUILDING. SEAL ALL PENETRATIONS
                                                                                                                                                                                                                                                                 (FOOTINGS WITH TRENCH MESH OR N12 BARS)                                          THROUGH FOOTINGS AND CUT OFF WALLS.


          TYPICAL FOOTING PILE DETAIL                                                                                                                                                                                                              PIPE PENETRATION DETAILS
             BESIDE SERVICE PIPES
                                                                                                                                                                                                                                                   SCALE 1 : 20

                                                                                                                        SLAB ON GROUND                                           PLUMBING PENETRATIONS INSTALLED BY
                                                                                                                                                                                                                                                                                                                 REINFORCING                 EXPANDING FOAM SEPARATING DRAIN
                                     (UNLESS NOTED OTHERWISE ON PLANS)                                                  REFER SLAB AND                                           PLUMBER TO LOCAL AUTHORITY
                                                                                                                                                                                 APPROVAL                                                SAND BEDDING                                                            FABRIC                      FROM CONCRETE STRUCTURE IN
                                                                                                                        FOOTINGS PLAN                                                                                                                                                                                                        ACCORDANCE WITH AS/NZS 3500                          EXPANSION JOINT BY
                                                                                                                                                                                                                                         TO CONCRETE SLAB
                                                                                                                                                                                                                                                                                                                                             TYPICAL.                                             PLUMBER TO LOCAL
                                                                                                                                                                                                                                                                                                                                                                                                  AUTHORITY REQUIREMENT




                                                          MINIMUM 20mm WIDE x 22 GAUGE STAINLESS STEEL LOOPED
                                                          STRAP AT MAXIMUM 1.0m CRS. THE PLUMBER SHALL SET UP THE
                                                          STRAPPING WHEN LAYING THE PIPEWORK.

                                                          THE BUILDER SHALL ENSURE THAT THE STRAPPING IS PROTECTED
                                                          DURING SLAB PREPARATION KEEPING THE LEGS OF THE STRAP                                                                                    INTERNAL SLAB BEAM
                                                          EXTENDING VERTICALLY THROUGH THE BEDDING MATERIAL.                                                                                       OR FOOTING                                                                                                                      EDGE BEAM OR
                                                                                                                                                                                                                                                                                                                                   FOOTING
                                                                                                                                                   EXPANSIVE CLAY SOIL OR
                                                          ONCE THE SLAB REINFORCEMENT HAS BEEN PLACED AND                                          OTHERWISE UNSTABLE                                                                                   BORED OR BUCKET PIERS OR PILES IF
                                                          CHAIRED THEN THE PLUMBER SHALL FIX THE STRAPPING TO                                      GROUND                                                                                               REQUIRED - REFER FOUNDATION PLAN
                                                          THE REINFORCEMENT USING AN APPROPRIATE STRAPPING TOOL
                                                          MAKING SURE THAT THE STRAPPING IS SECURELY FIXED AND TAUT.

                                                          THE BUILDER SHALL PLACE ADDITIONAL CHAIRS TO SUPPORT THE                                                                                                                                                                                                   SWIVEL COUPLING BY PLUMBER TO
                                                           REINFORCEMENT ADJACENT EACH STRAP FIXING POINT TO ENSURE THE                                                                                                                                                                                                                                                                     BEDDING MATERIAL
                                                                                                                                                                                                                                                                                                                     LOCAL AUTHORITY REQUIREMENT
                                                          REINFORCEMENT IS NOT TRODDEN DOWN DURING CONCRETE PLACEMENT.                                                                                                                                                                                                                                                                      TO AS/NZS 3500.2.2003
                                                                                                                                                                                                                                                                                                                                                                                            TYPICAL.

                                                                                                                                         INSTALLATION OF SEWER DRAINAGE IN UNSTABLE SOIL
C1    ##.##.####     REVISION NAME                                                                                                                                                                  BRISBANE
                                                                                        DESIGNED:         APPROVED:
                                                                                                                                                                                               T: 07 3852 4333    CONSULTANTS:                                                                         PROJECT: PROPOSED RESIDENTIAL DEVELOPMENT                                                          PROJECT NUMBER
                                                                                                                                                                                                                  CONSULTANTS NAME                                                                                                                                                                             S24-###
                                                                                                                                                    WE S TE R A
                                                                                                                                                                                                 GOLD COAST
                                                                                        DRAWN:
                                                                                                                                                                                               T: 07 5571 1599                                                                                         LOCATION: PROJECT LOCATION
                                                                                                                                                                                             SUNSHINE COAST
                                                                                                                                                                                                                                                                                                                                                                                                           SHEET NUMBER
                                                                                        CHECKED:
                                                                                                                                                    PART NE RS                                 T: 07 5391 3777
                                                                                                                                                                                              NORTHERN NSW
                                                                                                                                                                                                                 USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
                                                                                                                                                                                                                 PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE
                                                                                                                                                                                                                                                                                                       TITLE:           SLAB & FOOTING DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                    3.7
                                                                                                                                                                                                                                                                                                                                                                                                                     .
                                                                                        DATE:                                          STRUCTURAL+CIVIL+ENVIRONMENTAL ENGINEERS                                  DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM
                                                                                                                                                                                               T: 02 6674 8047   THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
                                                                                                                                                                                            CENTRAL VICTORIA
                                                                                                                                                                                                                                                                                                                        CLIENT NAME                                                                                              ##
                                                                                                                                                                                                                 STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
                                                                                        PAGE SIZE:   A3   For and on behalf of          www.westerapartners.com.au   ABN 52 097 417 975
                                                                                                                                                                                                                 CARRIED OUT WITHCARE AND DUE DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS.         CLIENT:                                                                                            REVISION
No.    DATE          REVISIONS                                              DRN   ENG                     WESTERA PARTNERS PTY. LTD.                                                           T: 03 5441 0922
Log in to download the original file

RFI - S25-054 Revised Concept Issue 18.06.2025 updated.pdf · 34.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.