Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

RFI - S25-054 Revised Concept Issue 18.06.2025 updated

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (34.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                                                              L2     THE STRUCTURAL WORK SHOWN ON THESE DRAWINGS HAVE BEEN DESIGNED USING
               GENERAL NOTES                                                                                                         THE FOLLOWING BASE WIND PARAMETERS IN ACCORDANCE WITH AS1170.2.
                                                                                                                                                                                                                                                                                                    DRAINAGE/PLUMBING/TREES
      G1       THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND OTHER                                        IMPORTANCE LEVEL                -    2                 WIND SPEED (m/s)                              WIND PRESSURE (kPa)
               CONSULTANTS DRAWINGS, SPECIFICATIONS AND INSTRUCTIONS. ANY DISCREPANCIES OR OMISSIONS                               REGION                         -     B1                SERVICEABILITY - 42.64                        SERVICEABILITY - 1.09                               D1 THE EXTERNAL FINISHED SURFACE SURROUNDING THE FOOTINGS AND SLAB ON GROUND IS TO BE
               SHALL BE REFERRED TO THE ENGINEER FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.                                TERRAIN CATEGORY                -    TC1                                                                                                                    WELL DRAINED AT ALL TIMES BY SLOPING THE SOIL AWAY FROM THE BUILDING AND GRADED TO GIVE A
                                                                                                                                                                                          ULTIMATE        - 62.32                       ULTIMATE       - 2.33
                                                                                                                                                                                                                                                                                               SLOPE OF NOT LESS THAN 50mm OVER THE FIRST 1 METER FROM THE BUILDING. PONDING OF WATER
                                                                                                                                                                                                                                                                                               AROUND THE BUILDING IS TO BE PREVENTED DURING AND AFTER CONSTRUCTION. ALL WATER IS TO
      G2       PRIOR TO THE COMMENCEMENT OF CONSTRUCTION THE CONTRACTOR SHALL CHECK AND CO-ORDINATE
                                                                                                                                                                                                                                                                                               BE DRAINED TO EITHER THE STREET FRONTAGE OR TO FIELD DRAIN PITS CONNECTED TO A
               WITH THE ARCHITECT AND OTHER CONSULTANTS ALL STEPS, FALLS, REBATES, SETDOWNS, CHASES AND
                                                                                                                                                                                                                                                                                               DISCHARGE LINE. SPOON DRAINS ARE TO BE LOCATED AT THE TOP AND BOTTOM OF ALL BATTERS.
               PENETRATIONS.
                                                                                                                                                                                                                                                                                               REFER TO THE BCA CLAUSE 3.1.2 FOR FURTHER DRAINAGE REQUIREMENTS.

      G3       ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. DIMENSIONS SHALL NOT BE
               OBTAINED BY SCALING OFF THE DRAWINGS.                                                                                                                                                                                                                                        D2 ENSURE PLUMBING INCLUDING STORMWATER DISCHARGE, SEWERAGE AND DRAINAGE ARE KEPT IN
                                                                                                                              L3     THE STRUCTURAL WORK SHOWN ON THESE DRAWINGS HAVE BEEN DESIGNED USING                                                                                      GOOD WORKING ORDER AND ARE NOT ALLOWED TO SATURATE THE GROUND AROUND THE BUILDING.
      G4                                                                                                                             THE FOLLOWING BASE EARTHQUAKE PARAMETERS IN ACCORDANCE WITH AS1170.4                                                                                      REPAIRS TO DAMAGE MUST BE ADDRESSED PROMPTLY
               ALL DIMENSIONS SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF THE WORKS.
                                                                                                                                     PROBABILITY FACTOR - 1.0
      G5       THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE STRUCTURE AND ADJACENT                                        HAZARD FACTOR - 0.08                                                                                                                                   D3 TREES AND SHRUBS ARE TO BE KEPT A MINIMUM OF 2 TIMES THEIR MATURE HEIGHT AWAY FROM THE
               STRUCTURES IN A STABLE CONDITION AND ENSURING NO PART SHALL BE OVERSTRESSED DURING THE                                                                                                                                                                                          BUILDING. IN THE EVENT THIS CANNOT BE ACHIEVED A "ROOT BARRIER" SYSTEM SHALL BE INSTALLED
                                                                                                                                     DOMESTIC STRUCTURE - YES
               WORKS.                                                                                                                                                                                                                                                                          AND CERTIFIED BY A SPECIALIST CONTRACTOR TO PROTECT THE BUILDINGS FOUNDATION SYSTEM.
                                                                                                                                     SUBSOIL CLASS - Ce
      G6       ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE RELEVANT CURRENT CURRENT                                EARTHQUAKE DESIGN CATEGORY - EDC1                                                                                                                      D4 ALL PLUMBING INSTALLED ON REACTIVE CLAY SITES IS TO BE PLACED IN ACCORDANCE WITH THE BSA
               AUSTRALIAN STANDARDS, THE BCA, AND LOCAL COUNCIL REGULATIONS.                                                         WHERE THESE PARAMETERS ARE BEING CONSIDERED BY OTHERS FOR USE ON ANY                                                                                      RECOMMENDED GUIDELINES FOR SANITARY AND STORMWATER INSTALLATION ON REACTIVE CLAY
                                                                                                                                                                                                                                                                                               SITES AS A MINIMUM STANDARD.
                                                                                                                                     ELEMENTS ON THE BUILDING, THEY SHOULD BE DESIGN CHECKED BY ANOTHER
      G7       ALL NON-LOADBEARING WALLS SHALL BE KEPT 20mm CLEAR OF THE UNDERSIDE OF SLABS, BEAMS AND                               SUITABLY QUALIFIED ENGINEER WHO SHOULD ALSO PROVIDE CERTIFICATION FOR
               OTHER STRUCTURAL ELEMENTS, UNLESS NOTED OTHERWISE.                                                                    THAT ELEMENT. WESTERA PARTNERS ARE NOT RESPONSIBLE FOR EARTHQUAKE
                                                                                                                                     LOADING CALCULATIONS ON ELEMENTS PROVIDED BY OTHERS.
                                                                                                                                                                                                                                                                                                    FOUNDATIONS
      G8       THE CONTRACTOR IS TO CONFIRM THE LOCATIONS OF ALL EXISTING UNDERGROUND SERVICES AND
                                                                                                                                                                                                                                                                                             F1     REFER TO SOIL REPORT AND FOOTING PLAN FOR REFERENCE TO THE REQUIRED FOUNDING
               TAKE NECESSARY MEASURES TO AVOID CLASHES PRIOR TO COMMENCING EARTHWORKS AND/OR PILING.                                LOAD COMBINATIONS HAVE BEEN CALCULATED IN ACCORDANCE WITH AS/NZS 1170.0
                                                                                                                              L4                                                                                                                                                                    MATERIAL FOR THE FOOTINGS, THE SOIL PROFILE ACROSS THE SITE AND SPECIFIC SITE
                                                                                                                                                                                                                                                                                                    RECOMMENDATIONS.
      G9       THE STRUCTURAL ENGINEERING DESIGN DOCUMENTED FOR THIS PROJECT RELATES TO THE PROPOSED
               NEW CONSTRUCTION OF BUILDING ELEMENTS. THE CONDITION AND COMPLIANCE OF EXISTING                                       SITE PREPARATION                                                                                                                                        F2     THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SHOULD THE FOUNDATION MATERIAL DIFFER
               STRUCTURAL COMPONENTS HAVE NOT BEEN ASSESSED NOR CERTIFIED AS PART OF WESTERA                                                                                                                                                                                                        FROM THAT STATED IN THE SOIL REPORT.
               PARTNERS COMMISSION ON THIS PROJECT UNLESS SPECIFICALLY STATED ON THE DESIGN DOCUMENTS.                        SP1 SITE EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH AS3798 - GUIDELINES ON
                                                                                                                                  EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS.                                                                                                    F3     TOPSOIL CONTAINING PLANT ROOTS AND ANY ORGANIC MATERIAL SHALL BE REMOVED FROM
      G10 IT IS THE BUILDERS RESPONSIBILITY TO OBTAIN SUFFICIENT SURVEY & GEOTECHNICAL ADVICE AND TO                                                                                                                                                                                                THE BUILDING AREA PRIOR TO CONSTRUCTION.
          INSTALL RETENTION SYSTEMS AS NECESSARY TO FACILITATE EXCAVATIONS ADJACENT TO SITE                                   SP2 REFER TO THE GEOTECHNICAL REPORT FOR THE SOIL PROFILE ACROSS THE SITE AND SITE
          BOUNDARIES.                                                                                                             RECOMMENDATIONS.                                                                                                                                           F4     FOOTINGS SHALL BE LOCATED CENTRALLY UNDER COLUMNS AND WALLS UNLESS NOTED
                                                                                                                                                                                                                                                                                                    OTHERWISE.
      G11 WHERE PROPRIETARY ITEMS / ELEMENTS / ASPECTS FORM PART OF THE STRUCTURE, WESTERA                                    SP3 THE SITE SHALL BE STRIPPED OF ALL TOPSOIL & VEGETATION AND PROOF ROLLED TO IDENTIFY SOFT
          PARTNERS HAS RELIED UPON MANUFACTURERS SUPPLIED INFORMATION FOR THEIR SPECIFICATION AND                                 SPOTS, WHICH SHALL BE EXCAVATED AND REPLACED WITH SUITABLE FILL APPROVED BY THE                                                                            F5     ALL WATER AND LOOSE MATERIAL SHALL BE REMOVED FROM FOOTING EXCAVATIONS PRIOR TO
          DESIGN.                                                                                                                 GEOTECHNICAL ENGINEER.                                                                                                                                            CONCRETING.

      G12 UNLESS NOTED OTHERWISE WESTERA PARTNERS CERTIFICATION EXCLUDES NON-STRUCTURAL                                       SP4 IN ACCORDANCE WITH AS3798, THE COMPACTION REQUIREMENTS FOR SHALLOW FILL ARE AS                                                                             F6     UNLESS OTHERWISE NOTED ON DRAWINGS, ALL FOOTINGS SHALL BE FOUNDED INTO MATERIAL
          CLADDING ELEMENTS INCLUDING FIRE RATING AND / OR FIRE TOXICITY FOR SUCH CLADDING ELEMENTS.                              FOLLOWS:                                                                                                                                                          HAVING A SAFE BEARING CAPACITY OF NOT LESS THAN 100kPa. TO BE CONFIRMED IN WRITING
                                                                                                                                                                                                                                                                                                    BY A GEOTECHNICAL ENGINEER.
      G13 "AS CONSTRUCTED" DRAWINGS WHEN ISSUED BY WESTERA PARTNERS SHALL ONLY INCORPORATE                                                A) SAND UP TO 800mm DEEP IS TO BE COMPACTED IN 200mm LAYERS BY A VIBRATING PLATE
                                                                                                                                                                                                                                                                                             F7     IT IS THE BUILDING CONTRACTORS RESPONSIBILITY TO MAINTAIN FOOTING DIMENSIONS
          DESIGN CHANGES FORMALLY ADVISED BY CLIENT/BUILDER, AND APPROVED AND INSPECTED BY                                                OR VIBRATION ROLLER. THE FILL IS TO HAVE AN N VALUE OF 7 USING A STANDARD
                                                                                                                                                                                                                                                                                                    INDICATED ON THE DRAWINGS. THE BUILDER IS TO SEEK GEOTECHNICAL ADVICE ON THE
          WESTERA PARTNERS.                                                                                                               PENETROMETER TEST. DENSITY INDEX IS TO BE NOT LESS THAN 75% IN ACCORDANCE
                                                                                                                                                                                                                                                                                                    ABILITY TO EXCAVATE THE EXISTING GROUND IN ITS PRESENT CONDITION AND ALLOW FOR
                                                                                                                                          WITH AS1289. TESTING OF DENSITY INDEX SHALL BE DONE IN ACCORDANCE WITH AS1289.
                                                                                                                                                                                                                                                                                                    FORMWORK OR MASS CONCRETE OVER POUR.
      G14 WESTERA PARTNERS HAS LIMITED CONTROL OR INPUT TO LOCAL GOVERNMENT OR OTHER
          LEGISLATED APPROVALS UNLESS SPECIFICALLY ENGAGED BY ITS CLIENT. ANY CHANGES TO                                                  B) NON-SAND FILL UP TO 400mm DEEP SHALL BE COMPACTED IN NOT MORE THAN 150mm
          APPROVAL REQUIREMENTS (INCLUDING ORDERS FOR SUSPENSION OF WORKS ETC) SHOULD BE
          COMMUNICATED TO WESTERA PARTNERS AND ALL OTHER RELEVANT DESIGNERS TO ALLOW
                                                                                                                                          LAYERS BY A MECHANICAL ROLLER, CLAY FILL SHALL BE MOIST DURING COMPACTION.
                                                                                                                                          STANDARD COMPACTION INDEX IS NOT TO BE LESS THAN 95% FOR A RESIDENTIAL
                                                                                                                                                                                                                                                                                                    CONCRETE
          ASSESSMENT OF POTENTIAL RISKS AND ENSURE DESIGN AND SAFETY COMPLIANCE.                                                          PROJECT AND 98% FOR A COMMERCIAL DEVELOPMENT OR PAVEMENT IN ACCORDANCE                                                                            C1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS3600 CONCRETE
                                                                                                                                          WITH AS1289. REACTIVE CLAY SHOULD BE AVOIDED AS FILL BUT IF USED SHOULD BE                                                                           STRUCTURES CODE AND THE REFERENCED STANDARDS THEREIN.
      G15 THE CONTRACTOR SHALL CONTACT THE ENGINEER AT LEAST 24 HOURS PRIOR TO                                                            PLACED AT A MOISTURE CONTENT WHICH APPROXIMATES THE FIXED EQUILIBRIUM
          ARRANGE AN INSPECTION WHEN REQUIRED.                                                                                            MOISTURE CONTENT.                                                                                                                                 C2 THE CONCRETE STRENGTH GRADE AND THE COVER TO REINFORCEMENT FOR THE VARIOUS
                                                                                                                                                                                                                                                                                               CONCRETE ELEMENTS SHALL BE AS LISTED BELOW:
               LOADINGS                                                                                                       SP5 ANY FILLED BUILDING PLATFORMS IN EXCESS OF THE FILL LEVELS DESCRIBED ABOVE SHALL BE
                                                                                                                                  CONTROLLED FILL IN ACCORDANCE WITH AS3798 - GUIDELINES ON EARTHWORKS FOR COMMERCIAL
      L1                                                                                                                                                                                                                                                                                                                SURFACES IN CONTACT      INTERIOR                 EXTERIOR
               THE STRUCTURAL WORK SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED FOR THE                                              AND RESIDENTIAL DEVELOPMENTS OR THE GEOTECHNICAL REPORT. THE TESTING AND CERTIFICATION
               FOLLOWING LIVE LOADS:                                                                                              OF THE FILL PLATFORM SHALL BE CARRIED OUT BY A SUITABLY QUALIFIED TESTING BODY.                                                                                                           WITH GROUND          SURFACES                 SURFACES
                                                                                                                                                                                                                                                                                                       ELEMENT          STRENGTH    COVER   STRENGTH    COVER       STRENGTH    COVER
                          LOCATION          UNIFORM LOAD (kPa)               POINT LOAD (kN)                                  SP6 FOR SITES WHERE CUT AND FILL IS REQUIRED, THE FILL SHALL CONTINUE PAST THE EDGE OF THE
                                                                                                                                                                                                                                                                                                                          GRADE               GRADE                   GRADE
                                                                                                                                  BUILDING AT LEAST 1m AND SHALL BE RETAINED OR BATTERED BEYOND THIS POINT. REFER TO THE                                                                     FOOTINGS U.N.O                N25         50          -          -         -         -
                      GARAGE SLAB                    2.5                                  13                                      GEOTECHNICAL REPORT FOR BATTER SLOPE DETAILS. UNLESS NOTED OTHERWISE THE INTERIOR OF
                                                                                                                                                                                                                                                                                             FOOTINGS BEAMS                N32         50          -          -          -            -
                                                                                          1.8                                     THE SLAB SHALL BE FOUNDED ON COMPACTED MATERIAL AND THE EDGE BEAMS & INTERNAL LOAD-
                    GENERAL AREAS                    1.5                                                                          BEARING ELEMENTS SHALL BE FOUNDED ON NATURAL SOIL (REFER GEOTECHNICAL REPORT)                                                                              GROUND SLAB & STAIRS           N32        50         N32        30        SB40          45
                         BALCONIES                   2.0                                  1.8                                                                                                                                                                                                SUSPENDED SLABS                 -          -         N40        30        SB40          45
                               ROOF                  0.25                                 1.1                                                                                                                                                                                                CONC COLUMNS/WALLS              -          -         N40        30        SB40          45

C1     ##.##.####   REVISION NAME                                                                                                                                                         BRISBANE
                                                                             DESIGNED:           APPROVED:
                                                                                                                                                                                     T: 07 3852 4333    CONSULTANTS:                                                                       PROJECT: PROPOSED RESIDENTIAL DEVELOPMENT                                          PROJECT NUMBER
                                                                                                                                                                                                        CONSULTANTS NAME                                                                                                                                                         S24-###
                                                                                                                                            WE S TE R A
                                                                                                                                                                                       GOLD COAST
                                                                             DRAWN:
                                                                                                                                                                                     T: 07 5571 1599                                                                                       LOCATION: PROJECT LOCATION
                                                                                                                                                                                   SUNSHINE COAST
                                                                                                                                                                                                                                                                                                                                                                              SHEET NUMBER
                                                                             CHECKED:
                                                                                                                                            PART NE RS                               T: 07 5391 3777
                                                                                                                                                                                    NORTHERN NSW
                                                                                                                                                                                                       USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
                                                                                                                                                                                                       PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE
                                                                                                                                                                                                                                                                                           TITLE:       CONSTRUCTION NOTES - SHEET 2
                                                                                                                                                                                                                                                                                                                                                                                     1.1
                                                                                                                                                                                                                                                                                                                                                                                      .
                                                                             DATE:                                             STRUCTURAL+CIVIL+ENVIRONMENTAL ENGINEERS                                DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM
                                                                                                                                                                                     T: 02 6674 8047   THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
                                                                                                                                                                                  CENTRAL VICTORIA
                                                                                                                                                                                                                                                                                                        CLIENT NAME                                                                        ##
                                                                                                                                                                                                       STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
                                                                             PAGE SIZE:     A3   For and on behalf of           www.westerapartners.com.au   ABN 52 097 417 975
                                                                                                                                                                                                       CARRIED OUT WITHCARE AND DUE DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS.       CLIENT:                                                                            REVISION
No.     DATE        REVISIONS                                    DRN   ENG                       WESTERA PARTNERS PTY. LTD.                                                          T: 03 5441 0922
Log in to download the original file

RFI - S25-054 Revised Concept Issue 18.06.2025 updated.pdf · 34.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.