STANDARD SAFE DESIGN REPORT (STD SDR REPORT) SDR5 ALL ASPECTS DETAILED OR NOTED IN THE WESTERA CIVIL/ENVIRONMENTAL/STRUCTURAL DOCUMENTS ARE SDR18 IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY TO ENSURE
THOSE REQUIRED FOR THE COMPLETED PROJECT OR DEVELOPMENT ONLY. THE BUILDER, PROJECT THAT SITE WORKERS ARE SUITABLY QUALIFIED, TRAINED AND INSURED FOR THE TASKS BEING
IN ACCORDANCE WITH THE WORK HEALTH AND SAFETY ACT AND REGULATIONS 2011 THE FOLLOWING CHECKED
MANAGER OR PRINCIPAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY NECESSARY UNDERTAKEN ON SITE. (CCD) (CE)
TASKS AND HAZARDS HAVE BEEN IDENTIFIED AS POTENTIAL CONSTRUCTION RELATED HAZARDS ASSOCIATED
WITH IMPLEMENTING THE DESIGN AS DOCUMENTED. TEMPORARY CONNECTIONS AS WELL AS SUPPORTS AND BRACING TO MAINTAIN THE STABILITY AND SAFETY
OF THE RELEVANT STRUCTURES THROUGHOUT THE CONSTRUCTION PERIOD. THIS INCLUDES ELEMENTS SDR19 IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT
(CCD) CONSTRUCTION CONFORMANCE TO DESIGN - SDR1,2,3,4,5,6,7,11,12,13,16,18,26,28 SUCH AS PREFABRICATED TIMBER AND STEEL ELEMENTS, UNRESTRAINED WALLS, CONCRETE COLUMNS, ALL SITE PERSONNEL ARE PROVIDED ADEQUATE SPACE, VENTILATION AND APPROPRIATE PERSONAL
RISK LEVEL = 3 BEAMS AND SLABS, PRECAST PANELS, ETC WHICH REQUIRE TEMPORARY SUPPORT OR PROPPING TO PROTECTIVE EQUIPMENT TO UNDERTAKE THE WORKS REQUIRED. ALL CONSTRUCTION EQUIPMENT IS TO
(SA&SWP) SITE ACCESS CONTROL AND FENCING INCLUDING STAIRS, SCAFFOLD, LADDERS, RAILINGS, SAFE WORK PREVENT OVER STRESS, EXCESSIVE DEFORMATION OR INSTABILITY UNTIL THE FINAL STRUCTURAL SYSTEM BE USED IN ACCORDANCE WITH BEST INDUSTRY SAFETY PRACTICES AND REGULATIONS. (GSW) (SWD&E)
PLATFORMS FREE FROM FALLING DEBRIS AND ADEQUATE WORKSPACE - SDR8,14,21,23,28 IS COMPLETED. THE DESIGNER IS TO BE CONTACTED FOR FURTHER ADVICE IF REQUIRED. (CCD)
SDR20 DEMOLITION WORKS ARE REQUIRED TO BE CARRIED OUT IN A SAFE, SYSTEMATIC AND ORDERLY MANNER IN
RISK LEVEL = 6
SDR6 WHERE THESE DESIGN DRAWINGS ONLY DOCUMENT PART OF A PROJECT OR DEVELOPMENT, IT IS THE ACCORDANCE WITH THE SITE SPECIFIC SAFETY PLAN AND ALL GENERAL SAFETY INDUCTION REGULATIONS.
(GSW) GENERAL SITE WORKS - SDR2,6,9,10,11,12,14,15,17,19,25,26,28 BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL DESIGN TEMPORARY PROPPING OF MEMBERS MAYBE REQUIRED IN ACCORDANCE WITH THE DIRECTION OF A
RISK LEVEL = 6 DRAWINGS ARE COORDINATED BETWEEN CONSULTANTS. FOR EXAMPLE, CO-ORDINATION TO ENSURE SUITABLY QUALIFIED PROFESSIONAL IN ACCORDANCE WITH RELEVANT SAFETY PRACTICES AND
APPROPRIATE SLAB THICKENINGS AND DETAILING FOR SEWAGE/STORMWATER CONNECTIONS, REGULATIONS. (DEM) (SIC)
(CE) USE OF CONSTRUCTION EQUIPMENT - SDR18,24,28
RISK LEVEL = 6 LOAD-BEARING AND BRACING WALL ELEMENTS, CAST IN FIXINGS, ETC. (CCD) (GSW)
SDR21 AT ALL TIMES THE BUILDER, PROJECT MANAGER, OR PRINCIPAL CONTRACTOR IS TO PROVIDE LOCAL
(SWD&E) STORMWATER, DRAINAGE AND ELECTRICAL SERVICES WORK - SDR9,10,14,19,28 SDR7 NO ALLOWANCE HAS BEEN MADE FOR CONSTRUCTION LOADS INCLUDING STACKING OF MATERIALS ON TRAFFIC AND PEDESTRIAN MANAGEMENT PLANS AS NEEDED TO ENSURE SAFE ACCESS AROUND AND ONTO
RISK LEVEL = 6 DECKS, FLOORS OR ROOF PLATFORMS, LOADS IMPOSED DUE TO PLANT, MACHINERY, LIFTING DEVICES, THE BUILDING SITE. CONSIDERATION MUST ALSO BE GIVEN TO SAFE WORKER ACCESS TO ALL WORK AREA
IMPACT/VIBRATION/CYCLIC LOADS, ETC. IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL INCLUDING ADEQUATE WALKWAYS AND STAIRS, SCAFFOLDING, SECURE LADDER ACCESS, SAFE WORKING
(W@H) WORKING AT HEIGHTS - SDR21,22,23,28 CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE DESIGNER OF ANY LOADS, THAT ARE NOT DOCUMENTED, PLATFORMS, ACCESS PATHS FREE FROM FALLING OBJECTS, ADEQUATE RAILINGS, FALL ARREST SYSTEMS,
RISK LEVEL = 7 THAT THE STRUCTURE MAY BE SUBJECTED TO DURING CONSTRUCTION. (SIC) (OL) (EA) (CCD) ETC. ALL PITS, FLOOR CAVITIES AND RELATED COVERS AND GRATES MUST BE MADE SAFE. (SA&SWP)
(DEM) DEMOLITION - SDR10,15,18,20,26,28 (W@H) (FC)
SDR8 UNLESS NOTED ON THE DRAWINGS NO ADDITIONAL ALLOWANCE HAS BEEN MADE FOR SPECIFIC LOADS
RISK LEVEL = 7 ASSOCIATED WITH THE MAINTENANCE OF THE STRUCTURE OR DEVELOPMENT. SDR22 ALL FORMWORK AND SCAFFOLDING SYSTEMS ARE TO BE DESIGNED AND CERTIFIED BY A LICENSED
(EA) ENVIRONMENTAL GROUND VIBRATIONS, NOISE AND DUST - SDR7,9,28 THE DESIGNER IS TO BE INFORMED OF ANY REQUIREMENTS NECESSARY TO EXTERNALLY SUPPORT CONTRACTOR TO COMPLY WITH RELEVANT AUSTRALIAN STANDARDS AND KEPT AND MAINTAINED IN A
RISK LEVEL = 6 PLATFORMS, CRANES, SCAFFOLDS ETC AS REQUIRED. (SIC) (SA&SWP) (CCD) (OL) GOOD WORKING ORDER. REGULAR CHECKS ON ERECTED MEMBERS AND FIXINGS MUST BE CARRIED OUT
BY A QUALIFIED PROFESSIONAL TO ENSURE COMPLIANCE WITH THE DESIGN. (FC) (W@H)
(SP&IT) SURROUNDING PROPERTY AND INFRASTRUCTURE INCLUDING TREES - SDR9,10,28 SDR9 DURING CONSTRUCTION, THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR SHALL
RISK LEVEL = 5 PROTECT NEIGHBOURING PROPERTIES FROM NOISE AND DUST IN ACCORDANCE WITH LOCAL SDR23 CLIMBING ON SCAFFOLDING OR FORMWORK AND WORKING AT HEIGHTS WITHOUT SUITABLY
AUTHORITY REQUIREMENTS, RADIATION, GROUND VIBRATIONS, STORMWATER FLOWS AND OTHER APPROVED RAILINGS, BARRIERS AND RESTRAINTS FIXED OFF TO CERTIFIED ANCHOR POINTS IS
(EX) TRENCHING AND EXCAVATIONS >1m - SDR10,14,28 CONSTRUCTION HAZARDS. CONDITION REPORTS ON NEIGHBOURING PROPERTIES AND STRUCTURES STRICTLY PROHIBITED. (FC) (W@H) (SA&SWP)
RISK LEVEL = 7 ARE RECOMMENDED PRIOR TO CONSTRUCTION. (EA) (SWD&E) (U/AGS) (P&IT) (GSW)
(CS) CONFINED SPACES - SDR10,14,16,27,28 SDR24 ALL SITE MACHINERY AND ELECTRICAL EQUIPMENT IS TO BE KEPT IN GOOD WORKING ORDER WITH
RISK LEVEL = 7 SDR10 THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR IS REQUIRED TO VERIFY AND IF CURRENT SAFETY TAGGING AND SERVICING WHERE APPLICABLE. (CE) (SWD&E)
NECESSARY CONDUCT FURTHER SEARCHES TO ACCURATELY LOCATE EASEMENTS, UNDER GROUND
(U/AGS) - WORK AROUND UNDERGROUND AND ABOVE GROUND SERVICES AND OBSTRUCTIONS - SDR9,10,28 AND ABOVE GROUND SERVICES, PROPERTY BOUNDARIES, TREES, EXISTING STRUCTURES AND OTHER SDR25 THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR IS TO ADEQUATELY TREAT AND DISPOSE
RISK LEVEL = 7 OBSTRUCTIONS PRIOR TO DEMOLITION AND OR CONSTRUCTION. THE DESIGNER IS TO BE IMMEDIATELY OF DANGEROUS SITE MATERIALS INCLUDING CONTAMINATED SOILS AND ASBESTOS IN ACCORDANCE
NOTIFIED OF ANY ELEMENTS NOT SHOWN ON THE APPROVED DRAWINGS AS THE DESIGN AND SAFETY WITH AUTHORITY REGULATIONS, INDUSTRY STANDARDS AND PRACTICES. (HM) (GSW)
(HM) EXPOSING AND HANDLING HAZARDOUS MATERIALS - SDR16,25,28
RISK LEVEL = 4 DESIGN REPORT MAY REQUIRE AMENDING. (DEM) (SP&IT) (U/AGS) (GSW) (SWD&E)
SDR26 THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR IS TO ENSURE THAT THE SITE IS
(FC) FORMWORK CONSTRUCTION - SDR21,22,23,28 SDR11 THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR MUST OBTAIN DESIGN AND INSPECTION MAINTAINED IN A SAFE WORKING MANNER AND THAT ALL SITE PRACTICES ARE IN ACCORDANCE WITH
CERTIFICATES ON ALL SUNDRY ELEMENTS OF THE STRUCTURE AND DEVELOPMENT INCLUDING BUT NOT CURRENT WORK PLACE HEALTH AND SAFETY LAWS AND REGULATIONS. (CCD) (GSW)
RISK LEVEL = 6
LIMITED TO COMPACTION TESTING, PIPELINE TESTING, CLADDING DESIGN AND FIXINGS, WINDOWS, SDR27 IDENTIFIED CONFINED SPACES COMPLY WITH RELEVANT STANDARDS FOR REASONABLY SAFE ACCESS
(LSC) LIFTING AND POSITIONING OF STRUCTURAL COMPONENTS - SDR15,18,28
BALUSTRADES, STAIRS, SUSPENDED CEILINGS, INTERNAL FIT-OUT ITEMS AND ALL OTHER ELEMENTS NOT AND MINIMIZED FOR ENTRY. THE BUILDER, PROJECT MANAGER AND/OR THE PRINCIPAL CONTRACTOR
RISK LEVEL = 6
DETAILED IN THE DESIGN DOCUMENTS. (GSW) (CCD) HAS RESPONSIBILITY TO CONTROL ACCESS AND MANAGE ASSOCIATED HAZARDS AND RESIDUAL RISKS
(SIC) STRUCTURE/MEMBER INSTABILITY DURING CONSTRUCTION - SDR7,8,12,14,20,28 WHICH MAY INCLUDE INUNDATION, BIOLOGICAL, ENGULFMENT, ASPHYXIATION, ETC. THROUGH ACCESS
RISK LEVEL = 6 SDR12 THE CONSTRUCTION IS TO BE FULLY CARRIED OUT IN ACCORDANCE WITH ALL DESIGN DRAWINGS CONTROL, PERMITS, AND MONITORING PROCESSES. (CS)
AND NOTES AS DOCUMENTED. IF CONSTRUCTION CEASES AT ANY STAGE, THE DESIGNER IS TO BE
(OL) OVER LOADING DUE TO CONSTRUCTION & MAINTENANCE LOADS - SDR7,8,15,28 NOTIFIED TO PROVIDE ADVICE ON THE SAFETY OF COMPLETED CONSTRUCTION WORK AT THAT SDR28 REFER DRAWING SHEETS FOR ANY SPECIFIC ADDITIONAL REQUIREMENTS.
RISK LEVEL = 5 TIME. (SIC) (GSW) (CCD)
(AMH) ADDITIONAL MATERIAL HAZARDS EXIST. REFER TO PROJECT SID HAZARD CHECKLIST (FORM WHS 006 a & b) SDR13 IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY
TO INFORM THE DESIGNER OF ANY CHANGE TO CONTRACTUAL ARRANGEMENTS
THE ABOVE LISTED TASKS AND HAZARDS HAVE BEEN ASSESSED AND ARE TO BE FURTHER MITIGATED BY
1) FOLLOWING RISK REDUCTION MEASURES AS INDICATED ABOVE.
BETWEEN THE CLIENT AND THEMSELVES WHICH MAY IMPACT ON THE DESIGN AND RISK TABLE '2' MITIGATED HAZARD RISK ASSESSMENT TOOL WITH RECOMMENDED ACTIONS BY PCBU REPRESENTATIVE
2) COMPLY WITH RISK TABLE '2' SUGGESTED ACTIONS. SAFETY OF THE DESIGN. (CCD) RISK LEVEL =
CONSEQUENCE IF IT DID OCCUR
3) IMPLEMENTING AND COMPLY WITH RISK REDUCTION MEASURES INDICATED IN THE PROJECT SDR14 THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR SHALL PROVIDE CONSEQUENCE x PROBABILITY
SID-ARAM (FORM WHS-006b) IF ABOVE (AMH) - ADDITIONAL MATERIAL HAZARD BOX IS CHECKED. SUITABLE WARNING SIGNS, BARRIERS AND ACCESS CONTROLS TO CONFINED SPACES 1 - INSIGNIFICANT. 2 - MINOR. 3 - CONSIDERABLE. 4 - EXTREME. 5 - CATASTROPHIC.
PROBABILITY OF EVENT (NO DAMAGE ). (SOME DAMAGE AND/OR (REPAIRABLE DAMAGE (SERIOUS DAMAGE (MAJOR DAMAGE
SDR1 IT IS THE CLIENT'S RESPONSIBILITY TO PROVIDE THIS 'SAFE DESIGN REPORT' TO THE BUILDER, PROJECT AND FENCING AROUND ALL EXCAVATIONS. AT NO STAGE SHOULD AN EXCAVATION BE OCCURRING FIRST AID TREATMENT). AND/OR INJURIES AND/OR FATALITY OR AND/OR MULTIPLE
MANAGER AND/OR PRINCIPAL CONTRACTOR AND THEIR MUTUAL RESPONSIBILITY TO HAVE A SAFETY APPROACHED OR ENTERED INTO UNLESS AN APPROVED AND CERTIFIED SHORING CAUSING LOST TIME). PERMANENT DISABILITY). FATALITIES).
MANAGEMENT PLAN ("SMP") FOR SITE ACCESS AND SAFE WORKING. (CCD) (SA&SWP) SYSTEM HAS BEEN INSTALLED OR THE BANKS HAVE BEEN BATTERED AND/OR BENCHED 1 - WILL ONLY OCCUR IN
1 2 3 4 5
IN ACCORDANCE WITH THE PROJECTS GEOTECHNICAL ENGINEERING SPECIFICATION EXCEPTIONAL CIRCUMSTANCES
SDR2 IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY TO BUILD THE WORKS AND/OR WRITTEN INSTRUCTIONS BY THE INSPECTING GEOTECHNICAL ENGINEER. 2 - COULD OCCUR AT SOMETIME 2 4 6 8 10
STRICTLY IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND NOT TO MAKE ANY VARIATIONS TO THE (SA&SWP) (EX) (GSW) (SIC) (SWD&E)
CONSTRUCTION WITHOUT THE SPECIFIC WRITTEN APPROVAL OF THE DESIGNER. (CCD) (GSW) 3 - LIKELY TO OCCUR SOMETIME 3 6 9 12 15
SDR15 AT NO STAGE SHALL SITE PERSONNEL PASS UNDER MATERIALS BEING LIFTED AND
4 - WILL PROBABLY OCCUR 4 8 12 16 20
SDR3 IT IS THE CLIENT'S RESPONSIBILITY, THROUGH CONSULTATION AND ENGAGEMENT OF SUITABLY QUALIFIED MOVED AROUND ON SITE. IT IS THE BUILDER, PROJECT MANAGER OR PRINCIPAL
CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT SITE MATERIALS ARE DELIVERED, 5 - EXPECTED TO OCCUR 5 10 15 20 25
PROFESSIONALS, TO MAKE THE DESIGNER AWARE OF ANY INFORMATION RELATING TO HAZARDS AND RISKS
WHERE CONSTRUCTION WORK IS TO BE CARRIED OUT, INCLUDING BUT NOT LIMITED TO: THE LOCATION OF TRANSPORTED, STORED AND POSITIONED IN A SAFE MANNER AND IN ACCORDANCE RISK LEVEL 1 TO 3 = MINOR 4 TO 6 = LOW 7 TO 8 = MODERATE 9 TO 10 = SIGNIFICANT 11 TO 18 = MAJOR 19 TO 25 = EXTREME
UNDER GROUND AND ABOVE GROUND SERVICES, IDENTIFICATION OF CONTAMINATED SOILS OR UNEXPECTED WITH THE PRODUCT SPECIFICATION, THE SITE SPECIFIC SAFETY PLAN AND GENERAL BEFORE CARRYING OUT UNACCEPTABLE RISK UNACCEPTABLE RISK.
SUGGESTED BE AWARE OF ENSURE PREPARE WORK
SOILS AND OTHER MATERIALS OR THE PRESENCE OF DANGEROUS MATERIALS INCLUDING ASBESTOS. (CCD) SAFETY INDUCTION REGULATIONS. (LSC) (GSW) (OL) (DEM) ACTIONS BY THE RISK AND ADEQUATE METHOD STATEMENTS, WORKS NECESSITATING THIS FURTHER MITIGATIONS THE HAZARD HAS NOT
PRINCIPAL CONSEQUENCES. CONTROL ENSURE ADEQUATE RISK, MEET WITH THE ARE REQUIRED. BEEN MITIGATED TO
SDR16 BUILDERS AND CONTRACTORS ARE REQUIRED TO OBTAIN AND COMPLY WITH MATERIAL BUILDER TAKE ADEQUATE MEASURES. MONITORING OF THE DESIGNER TO DISCUSS ALL ALTERNATIVELY, THE "REASONABLE
SDR4 THIS DESIGN HAS BEEN DOCUMENTED IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARDS, LOCAL MEASURES OUTLINED IN THE CHANGED TO THE PRACTICABLE "RISK
PRODUCT SPECIFICATIONS AND RECOMMENDATIONS WHEN USING MATERIALS AND AND/OR PRECAUTIONS. ENSURE ALL WORKS. ADHERE
AUTHORITY REGULATIONS AND STANDARD BUILDING CODES OF PRACTICE UNLESS NOTED OTHERWISE. PROJECT CONTRACTORS CLOSELY TO THE DESIGN DOCUMENTS SO THAT DESIGN CONCEPT MAY REDUCTION
ELEMENTS SPECIFIED IN THE DESIGN DOCUMENTS. (HM) (CCD)
EACH LEVEL OF CONSTRUCTION IS TO BE STRUCTURALLY COMPLETED AND INSPECTED TO ENSURE DESIGN MANAGER HAVE ADEQUATE ASSOCIATED NOTES NO MITIGATION MEASURES BE REQUIRED TO STANDARD. THE
COMPLIANCE BY THE CERTIFYING AUTHORITY PRIOR TO ADVANCING TO THE NEXT STAGE OF WORK. IT IS THE SDR17 TRAINING. ON THE DESIGN ARE MISSED. PREPARE MEET WESTERA'S DESIGN AD HAZARD
THE BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR MUST ELIMINATE OR DETAILED WORK PLANS, SAFE SAFE DESIGN REDUCTION
DOCUMENTS.
BUILDER, PROJECT MANAGER OR PRINCIPAL CONTRACTOR'S RESPONSIBILITY TO PROGRAM THE WORKS IN A LIMIT (SO FAR AS REASONABLE PRACTICABLE) SLIP HAZARDS AND PROTRUDING, SHARP WORK METHOD STATEMENTS REQUIREMENTS. APPROACH IS
SAFE MANNER AND TO HIGHLIGHT TO THE DESIGNER ANY ASPECTS OF THE WORK THAT MAY REQUIRE OR ABRASIVE ELEMENTS ON SITE. HAZARDOUS ELEMENTS MUST BE CAPPED, (SWMS), PERMIT TO START, INADEQUATE.
FURTHER CLARIFICATION OR ADVICE WITH REGARD TO THE HEALTH AND SAFETY OF THE PROJECT. (CCD) ADEQUATELY SCREENED OR CLEARLY MARKED TO ENSURE SITE SAFETY. (GSW) MONITORING, TRAINING, ETC.
C1 ##.##.#### REVISION NAME BRISBANE
DESIGNED: APPROVED:
T: 07 3852 4333 CONSULTANTS: PROJECT: PROPOSED RESIDENTIAL DEVELOPMENT PROJECT NUMBER
CONSULTANTS NAME S24-###
WE S TE R A
GOLD COAST
DRAWN:
T: 07 5571 1599 LOCATION: PROJECT LOCATION
SUNSHINE COAST
SHEET NUMBER
CHECKED:
PART NE RS T: 07 5391 3777
NORTHERN NSW
USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE
TITLE: CONSTRUCTION NOTES - SHEET 1
1.0
.
DATE: STRUCTURAL+CIVIL+ENVIRONMENTAL ENGINEERS DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM
T: 02 6674 8047 THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
CENTRAL VICTORIA
CLIENT NAME ##
STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
PAGE SIZE: A3 For and on behalf of www.westerapartners.com.au ABN 52 097 417 975
CARRIED OUT WITHCARE AND DUE DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT: REVISION
No. DATE REVISIONS DRN ENG WESTERA PARTNERS PTY. LTD. T: 03 5441 0922
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.