2017-02-07 Services & Organisation Committee Agenda
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Develop 3 year asphalt road reseal Draft 3 year reseal program Complete a draft 3 year reseal A Budget analysis finalised and a
program distributed amongst Council staff for program. proposed 3 year reseal programme
comment. presented to Council for comment.
A 25 year budget analysis for the
sealed road network presented to the
Asset Management Steering
Committee.
Public Transport – electric bus trial Report to Council regarding the trial Monitor programme and key hold Monitor programme and key hold
start date. points. points.
Civil works infrastructure tenders Evaluations and award of Energex Commence Energex civil works for
received. Civil works infrastructure. electric bus infrastructure,
Livery design. incorporating Noosa ‘look and feel’
Engage designer for Noosa ‘look and design aspects.
feel’ of the charging infrastructure.
Continue implementation of the mobility Continued roll-out within the Parks & Development of more detailed Pathway inspections to be
application across the organisation with Natural Areas crews. pathway inspection programmes to implemented in mobility and
greater than 50% implementation of Civil complement asset condition and supported with detailed reporting.
Operations (including Parks). insurance compliance. Planning of mobility roadmap outside
Drafting a mobility roadmap for of infrastructure department.
endorsement by the asset
management steering committee.
Develop process to reduce the number of Completion of the majority of backlog Continue developing an in-house Implement the assessment tool with
traffic related CRM’s not completed within traffic related CRM’s. assessment tool to evaluate traffic minimal backlog CRM’s going
timeframes. requests. forward.
Business as Usual activities Capital works Executive and Project Commence community consultation Report to CWE and PCG’s on
Control Groups set up, along with for the Noosa Pde corridor upgrade progress of Capital Works Program
reporting spreadsheet and Manufacture of Noosaville Foreshore Award the following:
governance terms of reference for furniture prototype Hilton Terrace corridor upgrade
capital works management. Noosaville Foreshore furniture design contract
The following designs 90% complete: redesign Commence works for:
Finalising the Cooroy Noosa Road o Thomas Street culvert
The following designs completed Stage 1, 2 and 3 designs reconstruction
o Ben Lexcen Dr Stage 2 civil works, Evaluation and recommendation of o Kinmond Creek Road, Eastern
ready for resealing Kinmond Creek Road tenders Branch and Sandy Creek
o Mary Street footpath improvement Proposal for trial section of Main reconstruction
Beach boardwalk design and o Lake Weyba Drive bus turnaround
Page 124 of 141
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.