2017-02-07 Services & Organisation Committee Agenda

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                            7 FEBRUARY 2017


BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                              THE NEXT QUARTER
Develop 3 year asphalt road reseal              Draft 3 year reseal program                Complete a draft 3 year reseal                A Budget analysis finalised and a
program                                           distributed amongst Council staff for        program.                                        proposed 3 year reseal programme
                                                  comment.                                                                                     presented to Council for comment.
                                                A 25 year budget analysis for the
                                                  sealed road network presented to the
                                                  Asset       Management     Steering
                                                  Committee.
Public Transport – electric bus trial           Report to Council regarding the trial      Monitor programme and key hold                Monitor programme and key hold
                                                  start date.                                  points.                                         points.
                                                Civil works infrastructure tenders         Evaluations and award of Energex              Commence Energex civil works for
                                                  received.                                    Civil works infrastructure.                     electric     bus      infrastructure,
                                                                                             Livery design.                                  incorporating Noosa ‘look and feel’
                                                                                             Engage designer for Noosa ‘look and             design aspects.
                                                                                               feel’ of the charging infrastructure.
Continue implementation of the mobility         Continued roll-out within the Parks &      Development of more detailed                  Pathway       inspections     to   be
application across the organisation with          Natural Areas crews.                         pathway inspection programmes to                implemented       in   mobility   and
greater than 50% implementation of Civil                                                       complement asset condition and                  supported with detailed reporting.
Operations (including Parks).                                                                  insurance compliance.                         Planning of mobility roadmap outside
                                                                                             Drafting a mobility roadmap for                 of infrastructure department.
                                                                                               endorsement        by     the     asset
                                                                                               management steering committee.
Develop process to reduce the number of         Completion of the majority of backlog      Continue developing an in-house              Implement the assessment tool with
traffic related CRM’s not completed within        traffic related CRM’s.                       assessment tool to evaluate traffic            minimal backlog CRM’s going
timeframes.                                                                                    requests.                                      forward.
Business as Usual activities                    Capital works Executive and Project        Commence community consultation             Report to CWE and PCG’s on
                                                  Control Groups set up, along with            for the Noosa Pde corridor upgrade             progress of Capital Works Program
                                                  reporting      spreadsheet     and         Manufacture of Noosaville Foreshore         Award the following:
                                                  governance terms of reference for            furniture prototype                            Hilton Terrace corridor upgrade
                                                  capital works management.                  Noosaville      Foreshore      furniture           design contract
                                                The following designs 90% complete:          redesign                                    Commence works for:
                                                                                             Finalising the Cooroy Noosa Road              o Thomas           Street     culvert
                                                The following designs completed              Stage 1, 2 and 3 designs                          reconstruction
                                                  o Ben Lexcen Dr Stage 2 civil works,       Evaluation and recommendation of              o Kinmond Creek Road, Eastern
                                                    ready for resealing                        Kinmond Creek Road tenders                        Branch    and     Sandy    Creek
                                                  o Mary Street footpath improvement         Proposal for trial section of Main                reconstruction
                                                                                               Beach boardwalk design and                    o Lake Weyba Drive bus turnaround


                                                                                                                                                               Page 124 of 141
Log in to download the original file

2017-02-07 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗