Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2017-02-07 Services & Organisation Committee Agenda

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                        7 FEBRUARY 2017


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             THE NEXT QUARTER
                                                                                             construction (between Surf Club and        Completion of Noosa Pde upgrade
                                                                                             Park Road).                                  community consultation and report to
                                                                                                                                          Council.
Planning & Environment
Management of Flying Fox Issues               Trialled Sprinkler System in Wallace       Implementing subsidy scheme for              Review effectiveness of subsidy
                                                Park                                         residents affected by flying fox in            scheme for residents affected by
                                                                                             Wallace Park.                                  flying fox in Wallace Park.
Draft Local Government Infrastructure         Workshop        undertaken     with        Correlate       Unitywater’s      DMatt      Determine future works required and
Plan                                            Councillors on LGIP requirements             projections with State population              costs
                                              Planning Assumptions for LGIP                projections                                  Progressive reports to be presented
                                                adopted by Council                         Mapping of existing infrastructure             to Council for each infrastructure
                                                                                             networks and costings                          network
                                                                                           Reviewing desired standards of
                                                                                             service for all infrastructure networks
                                                                                             with Council officer asset managers
Develop    Noosa   River   Management         Options and Issues Paper for state         Continue discussions with state              Future workshops with Council to
Strategy                                        agencies prepared to progress Jury           agencies on Jury recommendations               address Jury recommendations and
                                                Recommendations                            Review and update Noosa River Plan             community consultation
                                              Council resolved to update the Noosa
                                                River Plan under a whole of
                                                catchment management framework
Develop Koala Policy        and   Koala       Koala Management Plan adopted by           Assisting USC with Koala research.           Prioritise actions   of   the   Koala
Management Plan                                 Council                                    Undertake      audit    of    koala            Management Plan
                                                                                             infrastructure
Develop an auditing        program   for      Develop register for all signage in        Ongoing inspection of signage                Continue auditing programme for
advertising devices                             Tech One and an app for completing           complaints and advice on signage               advertising devices
                                                signage audit in conjunction with ICT        requirements
                                                Branch.                                    Commence auditing of advertising
                                                                                             devices


Audit of Public and Private Stormwater        Completed Audit of all Public              Information to all owners of                 Continue review of privately owned
Detention Basins                                Stormwater Detention Basins and              Stormwater       Detention  Basin              stormwater basins and advice to land
                                                incorporate programme for upgrades           maintenance requirements and offer             owners.
                                                of Basins in 2016-17 Budget                  of assistance to owners



                                                                                                                                                            Page 125 of 141
Log in to download the original file

2017-02-07 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.