GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
a 1.5 metre wide concrete footpath within the road verge for the entire length of
the site’s frontage to Val Crescent. This path must be widened to 1.8m where
not constrained by services or vegetation in the road reserve.
adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels
signage and lighting at strategic locations to direct people to building entries
and public toilet facilities
A pram crossing at the southern end of the path in Val Crescent
Joining smoothly to existing paths, services and verge areas
10 bicycle spaces provided in accordance with AS2890.3 Bicycle Parking
Facilities; and AUSTROADS Guide to Traffic Engineering Practice, Part 14 –
Bicycles, Section 10.
end of trip facilities of one locker per two bicycle space and one shower cubicle
with ancillary change room per 10 bicycle spaces or part thereof.
Condition a is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
Condition b is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
37. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval that is issued only where the Operational Works application
demonstrates the following in particular:
Stormwater quantity managed as described in section 4 of the Site Based
Stormwater Management Plan for Knowles Group Proposed Aged Care Facility
at Goodchap Street by Empire Engineering Revision B dated 3 May 2018, with
the exception of the following:
i. a stormwater quality treatment system designed in accordance with a
MUSIC model prepared in accordance with the Water By Design
Guidelines which demonstrates that pollutant reduction targets of 90%
reduction in Gross Pollutants, 80% reduction in Total Suspended Solids,
60% reduction in Total Phosphorous and 45% reduction in Total Nitrogen
can be achieved.
ii. To satisfy Section 4.8 of the MUSIC modelling Guidelines, the nodes
provided in the MUSIC model for any proprietary stormwater quality
treatment device must be verified by Stormwater Australia as achieving
the pollutant reduction and design parameters attributed to the node
included in the MUSIC model. Where Stormwater Australia is unable to
endorse the node for the proprietary stormwater quality treatment device,
the industry accepted bioretention basin node must be provided in the
MUSIC model, and redesign of landscaping layout to incorporate any
required bio retention device must be provided.
Page 10 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.