GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
38. All vegetated stormwater quality treatment devices must be:
designed consistent with the Bioretention Technical Design Guidelines (Water
by Design, 2012); and
maintained in accordance with the Water by Design (2009) - Maintaining
Vegetated Stormwater Assets (Version 1). A copy of this document must be
retained on the site together with the approved Operational Works drawings for
the stormwater quality treatment system and a detailed life cycle costing of the
system attached as an addendum. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
39. Any proprietary stormwater quality treatment devices must be routinely checked,
serviced and cleaned in accordance with the manufacturer’s recommendations.
Records of all maintenance activities undertaken must be kept and made available to
Council upon request. Where replacement cartridges or other necessary components
for the system become unavailable, an alternative system is required to be retrofitted
into the development to achieve an equivalent pollutant reduction outcome.
40. Any Site Operator Management Strategy must include the Water by Design (2009) –
Maintaining Vegetated Stormwater Assets (Version 1) document and/or maintenance
manual for the proprietary device as appropriate and must include the full cost of
maintaining the system in accordance with that document.
41. Where proprietary devices are endorsed as part of the Operational Works Approval, a
copy of a signed supply agreement between the body corporate/site operator and the
stormwater filtration system supplier for the maintenance of the proprietary devices
must be provided to Council prior to the pre-start meeting for the development. The
supply agreement must be for at least 10 years.
Acid Sulfate Soils
42. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and provided in the application for the Development Permit for Operational Works.
43. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a pH range of 6.5-8.5 pH units;
50mg/L maximum total suspended solids concentration;
0.3mg/L maximum total iron concentration;
0.2mg/L maximum total aluminium concentration;
no visible plume at either the point of release from the site or within a waterway.
44. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 “Concrete Structures for Retaining
Liquids” to ensure groundwater does not enter the basement after construction is
completed.
45. All treated material must undergo verification undertaken by a qualified person* using
the SPOCAS or Chromium Reducible Sulphur testing suite, and the results must be
submitted to Council for appraisal.
46. The application for Operational Works must demonstrate that continual dewatering of
groundwater’s will not occur as a result of groundwater movement along any bedding
material associated with pipes and around the basement of the development.
Page 11 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.