GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled
roads
v. provision for worker car parking
maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
works programme identifying key components of the works and their respective
durations
establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
details on the location of external fill/dump sites, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be
fully repaired at the applicant’s expense
it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be
required to be submitted at the Pre-Start Meeting for the project.
Damage to Services and Assets
56. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
where otherwise, upon completion of the works associated with the
development.
57. Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval
B. Find the following are sufficient grounds to justify the decision despite the conflict with the
Planning Scheme:
1. There is a significant need for aged care facilities within the Noosa region and the
proposal will in part satisfy this need.
2. The use is compatible with surrounding residential uses and will not significantly
impact on the amenity of the area. Further conditions are proposed to mitigate and
address any potential amenity impacts.
3. The proposal being low rise and articulated with a variety of external finishes will sit
reasonably well within the streetscape without being overly dominant.
4. The proposal provides extensive landscaping to the Val Crescent frontage to screen
the development from the street.
Page 13 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.