GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
Electricity and Telecommunication Services
47. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
48. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements/Covenants
49. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
50. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
51. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
52. Covenants for the preservation of sight lines distances must be created at the
intersection of Goodchap Street and Val Crescent and at the bend in Val Crescent.
The covenant areas must be generally in accordance with the QTraffic plan SK.01A
in the report dated 3 August 2018, and as modified in red by Council in the reference
documents. The covenant must be in favour of Council and the terms must include
but not be limited to:
No structures or fencing
No landscaping other than grasses, excluding the existing gum tree
The areas to be maintained at all times by the property owner.
Earthworks and Retaining Walls
53. All earthworks and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site (both
above and below ground) unless written permission from the respective landowner(s)
is provided to Council.
54. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
55. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
Page 12 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.