Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2018-10-15 General Committee Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


        This condition is imposed pursuant to s646 s145 of the Planning Act 2016 being necessary
        trunknon-trunk infrastructure. The relocation of the bus stop is only to facilitate the
        development and therefore no offset of the Infrastructure Charges is applicable.
        infrastructure identified by Council’s LGIP to service the development.
        This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
        infrastructure. The relocation of the bus stop is only to facilitate the development and
        therefore no offset of the Infrastructure Charges is applicable.
36.     Pedestrian and bicycle facilities must be provided for the development. The works must be
        undertaken in accordance with an Operational Works approval and must include in
        particular:
               a 2.0 metre wide concrete footpath within the road verge for the entire length of the
               site’s frontage to Goodchap Street including a new pram ramp at the intersection with
               Val Crescent
               a 1.5 metre wide concrete footpath within the road verge for the entire length of the
               site’s frontage to Val Crescent. This path must be widened to 1.8m where not
               constrained by services or vegetation in the road reserve
               adequate separation of all specific pedestrian routes from vehicle access and
               manoeuvring areas, and clear demarcation by pavement marking, signposts or
               changes in surface materials or levels
               signage and lighting at strategic locations to direct people to building entries and
               public toilet facilities
               a pram crossing at the southern end of the path in Val Crescent
               joining smoothly to existing paths, services and verge areas
               10 bicycle spaces provided in accordance with AS2890.3 Bicycle Parking Facilities;
               and AUSTROADS Guide to Traffic Engineering Practice, Part 14 – Bicycles, Section
               10.
               end of trip facilities of one locker per two bicycle space and one shower cubicle with
               ancillary change room per 10 bicycle spaces or part thereof.
        Condition a is imposed pursuant to s646 s128 of the Planning Act 2016 being necessary
        trunk infrastructure identified by Council’s LGIP to service the development.
        Condition b is imposed pursuant to s665 s145 of the Planning Act 2016 being non-trunk
        infrastructure

Departments/Sections Consulted:

      Chief Executive Officer       Community Services                        Corporate Services
      Executive Officer             Director                                  Director
      Executive Support             Community Development                     Financial Services
                                    Community Facilities                      ICT
                                    Libraries & Galleries                     Procurement & Fleet
                                    Local Laws                                Property
                                    Waste & Environmental Health              Revenue Services

      Executive Services        X   Environment & Sustainable Development     Infrastructure Services
      Director                      Director                                  Director
      Community Engagement          Building & Plumbing Services              Asset Management
      Customer Service              Development Assessment                    Buildings and Facilities
      Governance                    Economic Development                      Civil Operations
      People and Culture            Environmental Services                    Disaster Management
                                X   Strategic Land Use Planning               Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 21 of 55
Log in to download the original file

2018-10-15 General Committee Agenda(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.