GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
ENGINEERING
External Works
17. A 2.0m wide concrete footpath must be provided within the road verge for the entire
length of the frontage of the site to Wattle Street. The path must generally match with
the existing grassed verge without causing a trip hazard. The works must be
undertaken in accordance with an Operational Works approval and must
include/address the following:
a. Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
Pathway Construction Details;
b. Be extended to smoothly tapered and join with the existing path along Garnet
Street.
Reinstatement Works
18. Any redundant driveway and/or kerb layback must be removed, and the kerb line and
verge area reinstated and landscaped to match the existing kerb and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and turf, and must be maintained by the developer until established.
19. The redundant private pathway connection within the grassed verge of Garnet Street
must be removed, and verge area reinstated and landscaped to match the verge
treatments.
20. Any badly damaged kerb and channel along the frontage of the site must be repaired
to the reasonable satisfaction of Council’s representative.
Site Access and Driveways
21. A sealed access driveway must be provided from Wattle Street to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-049
and R-050 to grades prevent vehicles from scraping and/or bottoming whilst
also allowing for compliant grades for the footpath and pedestrians movements
along the footpath and the grassed verge without any step or trip hazard.
Car Parking
22. Car parking must be provided within the site generally as shown on the approved
plans. The works must be undertaken in accordance with an Operational Works
approval and must be in compliance with the provisions of AS/NZS 2890.1-2004 with
allowance for standard vehicle to enter and leave the site in a forward gear and with a
minimum head clearance (headroom) at any point of 2.2m.
23. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a lawful
point/s of discharge in Garnet Street and/or Wattle Street. The works must be
undertaken in accordance with an Operational Works approval in compliance with the
relevant sections of Queensland Urban Drainage Manual and supported by a detailed
stormwater drainage design prepared and certified by a suitably qualified and
experienced Registered Professional Civil Engineer (RPEQ).
25. The development of the site must not worsen existing drainage conditions on other
properties by diverting stormwater runoff or cause additional stormwater ponding on
any other property.
Page 25 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.