Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-10-15 General Committee Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


     26.   Stormwater runoff from the development must be disposed of on-site without causing
           scour or damage to the subject site or any adjoining property.
           Earthworks and Retaining Walls
     27.   All earthworks must be carried out in compliance with an Operational Works
           Development Permit.
     28.   All earthworks and associated batters/retaining walls must be contained entirely
           within the subject site unless written permission from the respective landowner(s) is
           provided to Council.
     29.   All earthworks must be undertaken in accordance with the provisions of Australian
           Standard AS3798: Guidelines on Earthworks for Commercial and Residential
           Developments, Council’s codes and relevant government regulations and guidelines.
           Certification must be provided by an RPEQ and submitted to Council prior to the
           issue of the Certificate of Classification for the building.
     30.   The development works must not adversely impact on the stability of the subject site,
           any other property or private or public structure.
     31.   Earthworks and development works carried out on site must not affect the structural
           integrity of any of the existing fences or structures that border the site. Fences that
           are affected shall be replaced prior to the Building Certifier issuing the Certificate of
           Classification.
           Telecommunication Services
     32.   Unless otherwise stipulated by telecommunications legislation at the time of
           construction, the development must be provided with all necessary conduits, pits and
           pipes to accommodate the future connection of optic fibre technology
           telecommunications.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT


1.   PROPOSAL
The application seeks a Development Permit for Material Change of Use for Multiple Housing -
Type 4 Conventional for 4 dwelling units, comprising 1 x 3 bedroom unit and 3 x 2 bedroom units.
The 2 bedroom units also have an open study/TV room on the second floor. Each unit has a
double garage with access to the site from Wattle Street. Refer to Figure 1 – Proposed units.




                                                                                    Page 26 of 55
Log in to download the original file

2018-10-15 General Committee Agenda(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.