26. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
27. All earthworks must be carried out in compliance with an Operational Works
Development Permit.
28. All earthworks and associated batters/retaining walls must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council.
29. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments, Council’s codes and relevant government regulations and guidelines.
Certification must be provided by an RPEQ and submitted to Council prior to the
issue of the Certificate of Classification for the building.
30. The development works must not adversely impact on the stability of the subject site,
any other property or private or public structure.
31. Earthworks and development works carried out on site must not affect the structural
integrity of any of the existing fences or structures that border the site. Fences that
are affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification.
Telecommunication Services
32. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The application seeks a Development Permit for Material Change of Use for Multiple Housing -
Type 4 Conventional for 4 dwelling units, comprising 1 x 3 bedroom unit and 3 x 2 bedroom units.
The 2 bedroom units also have an open study/TV room on the second floor. Each unit has a
double garage with access to the site from Wattle Street. Refer to Figure 1 – Proposed units.
Page 26 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.