Original source · versioned page text
2018-10-15 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
Building Demolition/Removal/Relocation
20. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) in accordance with Planning
Scheme Policy 11, Waste Management Plans must be submitted and approved by
Council’s Environmental Health Officer prior to issue of a development permit for
operational works for demolition, removal or relocation of any building other than a
shed.
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate
fees are charged for mixed waste.
Waste storage areas must provide adequate separation of all reusable, recyclable
and waste materials. These must be located so that they are convenient and safe to
use.
The Plan must contain the following information:
The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application
A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify contractor
waste volume(m³) *specify proposed *specify and landfill site or
materials re-use or on-site contractor and other disposal site
recycling methods recycling outlet
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals -
please specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Waste Storage & Disposal
21. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
22. Waste collection services are limited to between 6.30am and 6.30pm Monday to
Saturday and not permitted on Sunday or public holidays.
Page 6 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.