Skip to the record
Search everything, all in one place.

Council archive · source document

Development Application IDAS Forms 1, 6 & 4 Ecological Assessment, Plans · OPW12/0257

of 86

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (59.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
ODD
1.13   Is any of the operational work proposed to be carried out within a coastal management district?



~No
DYes         .           It is recommended that you complete part 10 of this checklist.


1.14   Is any of the proposed operational work for constructing or raising waterway barrier works under the
       Fisheries Act 1994?


~No
DYes         .           It is recommended that you complete part 11 of this checklist.


1.15   Is any of the proposed operational work to be carried out completely or partly within a declared fish
       habitat area under the Fisheries Act 19947


~No
DYes         .           It is ’recommended that you complete part 12 of this checklist.


1.16   Is any of the proposed operational work removing, destroying or damaging marine plants under the
       Fisheries Act 19947


~No
DYes         .           It is recommended that you complete part 13 of this checklist.


1.17   Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
       Rivers Act 2005?


~No
                     .




DYes         .           It is recommended that you complete part 14 of this checklist.
                            ,




1.18   Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
       state-controlled road?


~No
DYes         .           It is recommended that you complete part 15 of this checklist.



Ipart 2 State-controlled roads
         -




2.1    Is the proposed operational work for filling or excavating listed in the Sustainable Planning
       Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?

~ No         .           End of part 2 of this checklist.

             .           This application requires assessment by the Department of Transport and Main Roads as a
DYes                     concurrence agency.



.      End of part 2 of this checklist.


Section reference:
.      Sustainable Planning Regulation 2009, schedule 7, table 3, items 1 (b)and 2




                                                                                           Operational works IDAS checklist 4
                                                                                                            -




                                                                                                  Version 1.0 December 2009

Used in these records

About this file

File size
59.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application IDAS Forms 1, 6 & 4 Ecological Assessment, Plans.pdf · 59.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.