    Ipart 3 Acid suIfate soils
                   -




    3.1           Is the natural ground level of any point where work is being carried out less than 20 metres
                  Australian Height Datum (AHD)?


    DNo   I
                       .      En d of part 3 of this checklist.

    ~Yes

    3.2           Does the prop osed operational work involve the following?


    excavating more than 1 000 cubic metres of soil or sediment at or below five metres
                                                                                                 DYes               181 No
    AHD

    using more than 1000 cubic metres or m()re of material with an average depth of 0.5
                                                                                                 DYes               181 No
    metres on ’land, soil or sediment at or below five metres AHD
     I



    .             If yes to any of the above, then this application requires assessment by the Department of Environment and
                  Resource Man agement as an advice agency.


    Section reference:
    .             Sustainable PIanning Regulation 2009, schedule 7, table 3, item 3
    .             State planning policy.2/02: planning and managing development involving acid sulfate soils, section 3.6



(   Ipart 4 Easem ents and Substations
                   -




    4.5           Is any part of the premises subject to an easement ,in favour of the holder of’Pipeline Licence Number
                  1 issued under fhe<Retro/eum,Act 1923 for the construction or operation of the Moonie to ,Brisbane
                  strategic pipe line?


    ~No                .      En d of part 4 of this checklist.

    DYes               .      Th is application requries assessment by the pipeline licence holder as an advice agency.


    Section reference:
    .             Sustainable PIanning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17



    Ipart 8 Taking’or interfering with water
                   -




    8.8           Is any of the p roposed operational work for any thing constructed or installed that allows, under the
                  Water Act ,2000, for taking or interfering with artesian water (other than using a water truck to pump
                  water)?


    ~No

                       .      You must complete Taking artesian or sub-artesian water   -
                                                                                            IDAS form 12.   .




    DYes               .      Th is application requires assessment by the Department of Environment and Resource
                              M anagement as a concurrence agency.




    8.9           Is any of the p roposed operational work for any thing constructed or installed that allows, under the
                  Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?




    :DY:S I’
                              Go to question 8.12.

    I~N

                                                                                                Operational works   -
                                                                                                                        IDAS checklist 4.
                                                                                                        Version 1.0 December 2009

Used in these records

About this file

File size
59.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application IDAS Forms 1, 6 & 4 Ecological Assessment, Plans.pdf · 59.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.